Call +44 800 9755 164

Public tenders for business in Miskolc Hungary

Find all Business tenders in the world.
Finding business opportunities has never been easier.

Results for business. Make a new search!

Business services: law, marketing, consulting, recruitment, printing and security

MIHŐ – Miskolci Hőszolgáltató Kft. | Published June 14, 2016  -  Deadline July 22, 2016
cpvs

Business services: law, marketing, consulting, recruitment, printing and security

Business and management consultancy services

Miskolc Megyei Jogú Város Önkormányzata | Published February 27, 2015
Winner
RÁBA-QUELLE Kft.
cpvs
79410000, 79413000, 71210000, 71318000

Under an agency agreement summary to be performed during the Miskolctapolcai Beach and Waterpark development consultancy tasks: design documentation (export) review, taking into account the following aspects of investing in the professional interests of: - the technical content of the plan complies with the subsequent operation reliability, cost efficiency, energy rationalization aspects - the proposed service structure (number of pools, type, additional services) corresponds to the spa visitors needs and economic aspects - the planned investment cost justification of the return on reality - explore resource-saving opportunities for the investor's needs, goals Besides achieving. Based on these criteria, proposals to revise the plans.

Business services: law, marketing, consulting, recruitment, printing and security

MIHŐ – Miskolci Hőszolgáltató Kft. | Published October 4, 2016
Winner
Cop-Group Security Kft.
cpvs
79000000

to enforce a specified range beyond the 360 ​​days of the debts MIHŐ Kft., claim management activities carried out under orders supply.

Supply and installation of Power Supplies - No. 1 Changing Business Contract

MVK Miskolc Városi Közlekedési Zrt. | Published November 25, 2015
Winner
Miskolci Zöld Nyíl 2009 Konzorcium
cpvs
45000000, 45234121

"To a contract to develop the Miskolc urban tramways, within the framework of implemented EU-funded project, the extension of the reconstruction and the 1st line of existing infrastructure in urban tramways Upper Majláth station, as well as the associated entire infrastructure building, construction works according to FIDIC Yellow Book" contract related to the acquisition and installation of Power Supplies object. Understanding History: Miskolc tram railway track project development for large renovation, line extension and reconstruction of infrastructure related to the purchase of 31 pieces performed by the new advanced electric vehicle, replacing with the ongoing SGP and Tatra KT8D5 types of power from the vehicle fleet. It called for the redevelopment of part of the infrastructure of the energy supply network transformation rendszerűvé parallel beam system, in relation to the supply network system reconstruction. In accordance with the above, it is necessary to the operation of power conversion system to ensure the flow of electricity energy supply restructuring, review of existing equipment, redevelopment of the old regime. Customer TEBODIN in Hungary Kft charged the technical content of determining which of the designer - Miskolc urban public transport 43_09 DESIGN NETWORK OPTIMIZATION CONCEPT PLAN K 1:01 - summed up by the document. The SGP and Tatra trams KT8D5 type currently used in construction, in addition to power consumption parameters is currently regarded as temporary power supply system will satisfy traffic demands. The vehicles procured electricity demand, the current system has been unable to provide - due to voltage drop is much greater than the threshold endpoints - therefore imperative to rebuild the system. Description Original situation: the eastern section of the line is on Arany János utca, the line in the middle section of Ferenc János utca in the western section of the Fourth Street converters. The three power stations adjacent to the transformer auxiliary power supply can provide a possible malfunction via the cable network co-operation, or maintenance. The resulting voltage based on measurement data, the farm complex and Diósgyőri stretch of time trams peak voltage sags occur after high levels of the new trams into operation. Arany Janos converters: the old building, in the form of reconstruction of external necessity. Ferenc János utca converters: the new building, reconstruction is required. Fourth Street converters: Fourth Street premises. General description of the expected content:

For guidance related training, psycho-social and labor market consulting business conducted first contract no. Change

ROBOÁNI Oktató és Tanácsadó Kft. | Published December 17, 2014
Winner
SAVIC Group Képzési és Humánszolgáltató Közhasznú Nonprofit Kft.
cpvs
80400000

Can be classified into three categories consulting implementation (Group 1: Career guidance, training, individual and group counseling, Group 2: Psychosocial counseling, individual and group counseling, group 3: Labour tiny individual group counseling) IMPLEMENTATION OF LLG 48 consultancy days Psychosocial counseling 48 consultancy advice on the labor market within the framework of one time per week for 48 days consulting expert information days.

BUSINESS FOR UNDER CONTRACT, Gönci DEVELOP EXISTING BUILDING DISASTER ORS conversion, extension and information KORSZERŰSÍTÉSÉVEL- result of the procedure.

Borsod-Abaúj-Zemplén Megyei Katasztróvédelmi Igazgatóság | Published November 5, 2014
Winner
Industria 2000 Kft.
cpvs
45000000

Subject: within the framework of a contract, Gönci Disaster Ors developing existing building conversion, extension and modernization. Quantity: Detailed Description Redevelopment - not suitable for the floor and roof of the existing building condition based on visual inspection, to satisfactorily fulfill its long-term structural role, it will be demolished.

1.sz.szerződésmódosítás - "Guarding supply security, cash transport tasks in Miskolc Holding Local Government Asset Management Plc and member companies, and insurance services business event in the framework agreement."

Miskolc Holding Önkormányzati Vagyonkezelő Zrt. | Published December 23, 2015
Winner
MIREND-Sec Miskolc Rendjéért Vagyonvédelmi Kft.
cpvs
79713000, 75240000, 79710000

Its subject: Services: providing security and guard duties in Miskolc Holding Local Government Asset Management Company Ltd and its member firms for the following tasks: Object guarding, remote monitoring and security tasks for a total of 23 locations, as well as the tasks of the Miskolc Holding Local Government Asset Management Plc and member companies.. dispatch center to maintain transit services: supply of money delivery tasks in Miskolc Holding Local Government Asset Management Co. for the routes specified, the fund is open posture suited to the daily agenda supply of cultural events in the field Miskolc Municipality and organized at guarding tasks (security service) 6 Volume:. Object guard and security duties in Miskolc Holding Local Government Asset Management The Contractor is also responsible for the following locations manpower defense needs services, control of the security guard business law - primarily the people - and security, as well as the 2005 CXXXIII on the rules of private detective activity. Law, customer's security policies, and approved by the customer, each object watch Contractor's obligation to the protected objects, as regards the areas to guarding tasks manner and number of passengers and vagyonőrrel (the guard) constantly, as defined in the venue with a 12 hour shift, where candidates from the special services of the 12-hour shifts with the exception of objects which have been otherwise identified in the needs guarding. (For some objects and the number of general rule 2 people working different jobs should be provided in chronological order.) 1 (u: 4780/1) - watch: two main 24-hour (both in staying főportán); 1 person 12 hours (reception 06: 00-18: 00), one principal amount of 12 hours (18-06 confirmatory up area: 73,001 m2 Miskolc 3535 Foothills Way, Upper Majláth terminus (u. 30903/10) - 1 8 hours persons from 04,30 to 20,30 every area: 5,091 m2 3533 Miskolc, Fourth Street 10-16 (hrsz: 21795). - 1 person every 24-hour day area: 6,647 m2 trams in circulation: 1 person . day of 12 hours and a maximum of 30 tram in service Skoda, and occasionally the Tatra types of trams in the area, they accompany, vagyonvédelmük supply 78 (u: 4768/11). - Personal Concierge Service: 1 person reception (Monday-Thursday: 6 : 00 am to 18:00 pm (12-hour) Friday: 6:00 am to 15:00 pm (9 hours)) Freight Porta. 2 persons unarmed security guard 24 hours - 6:00 am to 6:00 pm every day special Others needs: Random bag checks, probing, starting diary, area: 23,272 m2 of sewage treatment plant (hrsz: 11014/2). - Number of guard stations at 6:00 pm Special needs as a dog Other special needs: security TFH receiving station Random breath testing and Bag Sajo river views gate to transport only the security guard's permission and area: 12 If 5,914 m2 3526 Miskolc, Tetemvár, Felsősor 221 (Corpse Castle protected area) (u: 3058/2) - Guard service: 7,00 Special demand for Others the special needs zárkamrák, engine room, swimming pool, security guard responsible for the vents in the summer to keep clean the internal traffic routes, lekaszálni the lawn, take care of the winter snow and síktalanításról. (And the necessary tools to MIVÍZ Ltd. does not provide..) The size of area: 9,041 m2 Miskolc, Greece Mountain védterület and Pereces pool facilities, works of art (u: Greek Mountain: 71,740 / 1, 71,740 / 2, 71,740 / 3, Pereces: 35,356 / 1 ) - watch: 7:00 am to 7:00 pm Other special needs zárkamrák one person, machine room, the security guard mission in the summer to keep clean the internal traffic routes 7, lekaszálni the lawn, take care of the winter snow and síktalanításról and 36th c. védterületen during mowing. (.. The necessary tools for these Ltd. does not guarantee the MIVÍZ) area: 1 ha 9845 m2 and 1202 m2 western part of the city Miskolc resources (land registry. 38349, 01048, 01046 / 1-2, 38,514.38519) - 1 main weapon security guard without a motor vehicle: Monday-Thursday: 16:00 am to 6:00 pm (14-hour) Friday: 15: 00 am to 6:00 pm (15 hours), resting and holidays: 17: 00 am to 6: 00 Other special needs: Zárkamrák, engine room, swimming pool, integrity vents The security guard keeps the summer traffic routes, remove grass, snow and winter care of síktalanításáról. (. The necessary tools for these Ltd. does not guarantee the MIVÍZ.) Area: 7609 m2 3524 Miskolc, Jósika travel védterület (u: 13027/1) -

"Nagyprojekttel conduct was related to public relations, event planning and media buying activities," "A" Miskolc tram railway development conference outcome

MVK Miskolc Városi Közlekedési Zrt. | Published September 9, 2015
Winner
W+E Konzorcium (Tagok: Wise Advisory Group Kft. és Eventum+ Kft.)
cpvs
79952000, 79961100, 79300000, 64228000

Subject: Service offer "A" Miskolc tram railway development "nagyprojekttel was related to public relations, event planning and media buying business transaction" A television appearance (paid publication) 200 B. Radio appearance (paid publication) 125 pcs C. Press Conference 2 D. PR-2 movies filming E. Final Event 1 F. Other events (conference) 1 2 G Poll detailed description of the tasks included in the description of technical documentation.

"In the framework of a contract for the development of Miskolc Zoo Wolf Lynx runway complex" result information

Miskolc Megyei Jogú Város Önkormányzata | Published February 16, 2015
Winner
Gerixon Tervező és Kivitelező Kft.
cpvs
45210000

Quantity: Wolf Lynx runway complex construction, which require complex installation feature. Storey building with a floor area of ​​40m2 an educational room, sanitary facilities, barrier-free toilet, educational elements in the project facilities. The animals sleeping rooms, nursing rooms, isolation rooms, outdoor enclosures are constructed. Contracting draws attention to the business margin fee does not include, in addition to the provisions of this agreement with respect to the parties not to apply the legal concept of margin. The exact quantities and technical specifications included in the accompanying documentation and the attached final building permit.

Enterprise contract management Zemplén County: County Disaster Emergency Management Mezőcsát Orsera works for. I, no. amendment

Borsod-Abaúj-Zemplén Megyei Katasztróvédelmi Igazgatóság | Published July 6, 2015
Winner
Popex Építőipari és Szolgáltató Korlátolt Felelősségű Társaság
cpvs
45000000

Subject: Business management contract Zemplén County: County Disaster Emergency Management Mezőcsát Orsera works for. Quantity: BASIC DATA AND PARAMETERS 11. lot number: (. HESZ reduced by Telekom) 37 1215 m2 land plot existing condition exists. built up area of ​​35.2 m2 m2 + 115.2 = 150.4 m2 existence. built-up 12.4% of the planned installation of new state total 73.6 m2. built-in floor space + 73.6 = 115.2 188,8m2 total. built-up area of ​​410 m2 covert 15.5% of green space ratio of 66.3% ± 0.00 m outer sidewalk level planned building sub-floor level +0.20 m +6.41 m elevation ridge height 5.10 m height + function, the local building codes such as local-level municipal administrative building, not prohibited. The plot is gas, water and electricity has visually, performed by local service providers. The conversion of the existing building and the extension of civil protection patrol is established in the tender notice, the contract documents, technical specifications and the budget summed unpriced for you. The names alone are presented in order to identify clearly the nature of the subject.

"Enterprise contract management Zemplén County: County Disaster Emergency Management Mezőcsát Orsera works of" Law award notice

Borsod-Abaúj-Zemplén Megyei Katasztróvédelmi Igazgatóság | Published May 4, 2015
Winner
POPEX Építőipari Szolgáltató Betéti Társaság
cpvs
45000000

Subject: Business management contract Zemplén County: County Disaster Emergency Management Mezőcsát Orsera works for. Quantity: BASIC DATA AND PARAMETERS 11. lot number: (. HESZ reduced by Telekom) 37 1215 m2 land plot existing condition exists. built up area of ​​35.2 m2 m2 + 115.2 = 150.4 m2 existence. built-up 12.4% of the planned installation of new state total 73.6 m2. built-in floor space + 73.6 = 115.2 188,8m2 total. built-up area of ​​410 m2 covert 15.5% of green space ratio of 66.3% ± 0.00 m outer sidewalk level planned building sub-floor level +0.20 m +6.41 m elevation ridge height 5.10 m height + function, the local building codes such as local-level municipal administrative building, not prohibited. The plot is gas, water and electricity has visually, performed by local service providers. The conversion of the existing building and the extension of civil protection patrol is established in the tender notice, the contract documents, technical specifications and the budget summed unpriced for you. The names alone are presented in order to identify clearly the nature of the subject.

"Development of this web-portal account of Miskolc Holding Zrt., The ÉMOP 4.3.2-13-2013-0001. number of projects within the framework of "No.1 contract modification

Miskolc Holding Önkormányzati Vagyonkezelő Zrt. | Published April 17, 2015
Winner
Új Algoritmus Kft.
cpvs
72212600, 72211000, 48444100, 79999000

Service offer. "Development of e-invoicing web portal of the Miskolc Holding Zrt ÉMOP-4.3.2-13-2013-0001. number of projects within the framework of "No. 1 sub-tasks. Winning bidder with the challenge of e-invoicing web portal of Miskolc Holding Zrt it provides the servers installed. The E-invoice solution Expectations: - The access and data security to achieve a high level. - Provide a compact, integrated system of end-to-end solution for the preparation of the bill to producing authentic account. - The e-invoicing application, perform the authentication of electronic invoices. - You can easily be adapted to Finance and Accounting module of the ERP system Miskolc Holding Ltd. and billing modules.. - Responsive, browser-independent, web-based application of modern technologies is made, which makes available a wide range of customers for e-invoicing. - Browser-independent responsive web applications it runs at least 800x480 pixels resolution mobile devices (mobile phone and / or tablet). - Comply with legal requirements for electronic invoicing. Customer is entitled to use the product in the business and operational, to utilize. Warranty terms: 1-year software support grant. No. 2 sub-tasks: the one-year software support legislation to provide continuous tracking service which includes detailed technical description of the duties attached to the support documentation in time.

"Social rehabilitation for the city of Miskolc Avas south area of ​​action ÉMOP-3.1.1-12-2013-0011, Settlement House environment, development Leisure Park" - No. 3. contract modification

Miskolc Megyei Jogú Város Önkormányzata | Published February 18, 2015
Winner
PAPEX Kft.
cpvs
45200000, 45112700, 45236200, 45236250

Subject: Business Contract - "urban renewal social purpose Miskolc Avas south area of ​​action ÉMOP-3.1.1-12-2013-0011, House Settlement environment, development Leisure Park" quantity: 1 task group "Settlement House environment in accordance with the principles of the Green City" Professional Activity Description: Walking Tours will be demolished as part of the renewal of life-threatening barriers, while others will be renovated. Green Plum u Surfaces 1-7. c. Plum No. 15 and u. open wide facade building surface vegetation using 128-128 nm steel structure running boost. The goal is to create a greener area affected environment, thus ensuring the planting of trees behind the Community Center. Second task group: "Development of Recreation Park area between the University and the City of rancid" professional activity description: Fitness Ball Park gripping the edge of the track to the west bedroom is also located. Recreation Park neighborhood environment for improving the safety of increasing the number of kandelláberek (5 positions), which function to save energy and reduce CO2 emissions in the spirit of solar and LED bulbs provide. The leisure park currently implemented open field planting trees is to provide a summery shade on sunny days. Dog

Technical control services

Diósgyőri Stadionrekonstrukciós Kft. | Published November 4, 2015  -  Deadline December 14, 2015
cpvs
71356100, 71247000, 71631000, 71356300, 71248000

The UEFA diósgyőri IV. supply class football stadium provisioning related technical supervisor and organizer functions, under an agency agreement, as detailed in the tender documents. Required to be carried out in accordance with Regulation 15) on.. A construction site as a representative of the construction technical inspector duties and related penalties pregnant deadlines: Deadline: continuous Deadline: 3 working days deadline after the client instruction: date written on the general construction contract Deadline: continuous Deadline: continuous Deadline: continuously, the construction pace adjusting, Deadline: continuous Deadline: continuous Deadline: continuously, the construction pace in line, Deadline said the general contracting contract Deadline: continuously, the construction pace in line, Deadline: continuously, the construction pace in line, Deadline: continuous Deadline: if necessary, the client instruction within 3 working days Deadline: continuous Deadline: 3 working days of receipt, - entrepreneurial award and certificate of performance specified in the contract: Record a) the issuance and transfer or transmission of the main contractor, b) the construction log in receipt of the notification regarding settlement sent to the main contractor by the contractor - if the contract or legislation sets out the handover process, this closure of - date, within a maximum of five working days deadline: within 3 working days of receipt, Deadline: continuous Deadline: 10 working days from the felmerüléstől Deadline: continuously, when they occur immediately Deadline: continuously - detailed design documentation provided to the client, and created by the designer (s) or the main contractors, construction plans, review of design changes, the development of proposals for technical comments on the plan documentation (s) of principal by to approve Deadline: 5 working days from the date of the documents receipt Deadline: 5 working day deadline from the date of the documents receipt: continuous Deadline: continuous Deadline: within 3 working days of receipt, Deadline: continuous Deadline: within 3 working days of receipt Deadline: 5 working days of receipt, Deadline: continuously, the construction pace in line, Deadline week, the documentation within 3 business days after the co-operation, Deadline: continuous Deadline: According to aa general contracting contract within three business days of receipt, Deadline: every month until 5, - the technical handover and commissioning shows: Deadline: According to the general construction contract Deadline: According to the general construction contract deadline: the following workspace pass two month deadline: the date of the documents receipt 10 working day, Deadline said the general contracting contract Deadline: According to the general construction contract Deadline: 5 working days following the commencement of the technical handover procedure, and the technical handover Expires closing Deadline: According to the general construction contract Deadline: the general contracting contract According to Deadline: According to the general construction contract Deadline: one month following issuance of the occupancy permit Deadline: the monthly report at the same time, Deadline: 3 months after the completion of the technical handover, Deadline: 30 days after completion of the technical handover Deadline: 3 months after the completion of the technical delivery and acceptance - within the warranty period after at least a year in the technical handover, but if necessary, out of turn, determining the organization of admittance, verification and troubleshooting deadlines established by the operator error list of the main contractor and together with the client, the crawl recording of warranty. (Error checking and correction return receipt is performed by the operator.) Deadline: individually specified Deadline: Ongoing.

"[SIOP Exchange Support 2.2.6 / 12/1 / B identification number, the structure of Miskolc Semmelweis Hospital and University Teaching Hospital] 'supply of necessary project to achieve full technical inspection services.

Miskolci Semmelweis Kórház és Egyetemi Oktatókórház | Published March 4, 2015
Winner
H.Q.C. Mérnökiroda Kf. és CREDAS Kft. közös ajánlattevők
cpvs
71310000, 71247000, 71300000, 71318000, 71631000

The Miskolc Semmelweis Hospital and University Teaching Hospital for the "[support change SIOP 2.2.6 / 12/1 / B Seq Structure of Miskolc Semmelweis Hospital and University Teaching Hospital]" necessary for the effective implementation of the project, the technical inspection services supply, whereby the winner tenderer shall undertake the following activities: We want to conclude a contract with the contractor as a result of this process to provide a service which is the main subject of public sense - promoting change SIOP 2.2.6 / 12/1 / B Seq Structure of Miskolc Semmelweis Hospital and University Teaching Hospital - in the context of the reconstruction project (development of pulmonary and neurological center 6,532.49 m2 of construction investment), and the development of medical inpatient 619.3 m2 building investment: 15) Government Decree, and the building and construction matters. 266/2013 on professional practice related activities. (VII.11.) Government Regulation and mandatory content of other relevant legislation in all your necessary work specializations and implementation phases covering, the contractor shall cooperate in the preparation of the project's final report involvement, # the contracting specialist involved in the preparation of public documents related to the project, and as part of the procurement procedures of the jury, review # designs and propose reasonable plan amendments or opinions revision initiatives, organizing the necessary design consultations, the plans submitted by the designers under the business contract review, monitoring and observations Append # existing and acquired Check licenses, monitoring their validity, timeliness up their standards for reporting and performance tracking # entire process of building and construction activity promotes and monitors the relevant laws, administrative regulations, standards, contracts and construction documentation compliance, # implementation of the project knitted facilities under contract, delivery of goods to the full and verified the proper implementation of the quality standards enforcement, # necessary to implement the tasks experts and other staff to ensure continuous monitoring to entrepreneurs and their accounts, processes # contributions following the technical handover process the warranty period ( megajánlása in construction contractor in accordance with), from # successful implementation of the project, providing full technical audit, financial and scheduling of supervision and implementation services needed, # of documents, preparation of participation, cooperation on legal issues carrying out legal representation of the Contracting lawyer ( or law firm)

"Supplying the final settlement tasks"

"DIFO" Diósgyőri Foglalkoztatásszervező és Szolgáltató Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published February 6, 2015
Winner
VIR Consult Gazdasági Szolgáltató Kft.
cpvs
98391000

Elimination of "supplying the final settlement tasks" in the Voluntary Tender Act V of 2006 VIII. Chapter II, the Offeror shall in the performance of this contract: assets remaining after the satisfaction of creditors divided among the members of the Tender and the Tender cease operation in cash or in kind; - To provide the Contracting Authority's assets in the run conservation, the preservation of the property is sold; - If the year of the initiation of the final settlement is not completed, the business is required to prepare an annual statutory accounts as defined in the accounting and tax returns with an indication of the Accounting Act, that the Contracting Authority is being wound up; - An annual conference to make the main body and the commercial court, in which it has to show the position of the Contracting under voluntary liquidation, the reasons why the completion of the process has not yet been, and state the expected time for completion of the process can be informed; The disputed creditor claims of creditors of the liquidator notifies such a rating over the same period of the claim. - The data sheet of by former officer of the Tender closing the activity report of the Accounting Act liquidation opening balance sheet prepared, after the deadline for creditors to use the report expired in - starting from the creditors' claims from the list - - not later than seventy-five days, as necessary - corrected liquidation opening balance sheet (adjusted liquidation opening balance sheet), which is also present to the main body of the Contracting Authority. - The main decision-making body in the performance of its obligations Tender Offeror shall call for a consultation to fully satisfy and give detailed information on the action with it.

To obtain the required number of EEOP 1.1.1 / C / 13-2013-0001 project implementation tools - the purchase identification system based on UHF RFID technology - Reference No. 1. contract amendment

Miskolc Megyei Jogú Város Önkormányzata | Published December 18, 2015
Winner
Navigator Informatika Zrt.
cpvs
42961000, 42961100, 42961300, 42965000, 48614000, 72000000

Delivery within the framework of the purchase contract required the number of EEOP 1.1.1 / C / 13-2013-0001 project called "Miskolc and its Region Waste Management System development tool purchases," the realization of assets - Obtaining identification system based on UHF RFID technology with 250,000 people, 55,000 households) RFID system for the present process to build this system, the introduction and development. The development must be implemented by the Offeror of the following tasks: - you must create the necessary operation of the service base database containers to be consolidated on the basis of contracting data services, container, plants and motor vehicles with regard to - a suitable collection vehicles and existing gyűjtőjárművekre appropriate RFID EPCglobal Class1 Gen2 standard or equivalent to fit on a chip reading and data acquisition system must be installed - the collection, keep containers must be provided with EPCglobal Class1 Gen2 passive standard, or equivalent RFID identifier - járatoptimalizálást should be based on the flight plan passed. - Data and voice communication between the development of these systems adapted to co-operating with an integrated business management system that is suitable for the corporate governance system of units of the task includes the necessary hardware and software supply, needed for startup tasks, Trials, coaching and sharp commissioning : regarding the operation of the system - not detailed in this documentation - Clarification of the Customer demands and requirements, including the requirements specifications, data compilation. 91% of the system you need to register Expected mounting ratio: the last day of the trial run for the contract period found in exposed evacuation and the Offeror by container than 95% must be equipped with the label of the necessary computers and other devices (see supplied hardware eszözök.) delivery and commissioning. Completion of the necessary software development tasks. Járatoptimalizáláshoz preparing to develop the necessary information and flight plan data model ERP system components integrated operation in the 1-6 points through data and voice communication drawn up, respectively. ready software components, process operating software, installing. 9. Transfer of Operating and user documentation. Teaching the basics of the system to function and operate the necessary training in the use. Trial operation arrangement agreed with the Customer in a way that involves the testing of theoretical flight plan model. The test run may be required based on the experience of fine-tuning tasks to carry out corrections in customer negotiation and finalization of models optimized flight plan. The whole system is set into operation. Deliverables hardware: necessary for the efficient (quick-response) to operate the server computer system performance monitor, keyboard, UPS necessary for the safe operation of the operating system, web server, database server, virus protection and a firewall. 2 laptop, mouse, and necessary for the safe operation of the operating system, virus protection, firewall and office software package.

Command and control system

Miskolc Megyei Jogú Város Önkormányzata | Published October 7, 2015
Winner
Navigator Informatika Zrt.
cpvs
42961000, 42961100, 42961300, 42965000, 48614000, 72000000

Delivery within the framework of the purchase contract required the number of EEOP 1.1.1 / C / 13-2013-0001 project called "Miskolc and its Region Waste Management System development tool purchases," the realization of assets - Obtaining identification system based on UHF RFID technology with 250,000 people, 55,000 households) RFID system for the present process to build this system, the introduction and development. The development of the Offeror must carry out the following tasks: - you must create the necessary basic operation of the service database containers to be involved in contracting on the basis of data provided, container, plants and motor vehicles with respect; - Suitable collection vehicles and the existing EPCglobal Class1 gyűjtőjárművekre need to install RFID Gen2 standard, or equivalent to fit on a chip reading and data acquisition system; - The collection, keep containers must be provided with EPCglobal Class1 Gen2 passive standard, or equivalent RFID identifier; - Járatoptimalizálást be carried out according to the flight plans submitted; - Data and voice communication between the development of these systems adapted to co-operating with an integrated business management system that is suitable for the corporate governance system of units. The task includes the necessary hardware and software supply, needed for startup tasks, Trials, coaching and sharp installation: for the operation of the system - clarifying needs and requirements of the Customer, specifications containing the requirements, compiling a database - in this documentation unspecified . 91% of the system you need to register. Expected rate of equipment: exposed evacuation test run on the last day of the period covered by the contract by the Offeror and its container found in at least 95% must be fitted on the label. The necessary computers and other devices (see delivered. Eszözök hardware) delivery and commissioning. Completion of the necessary software development tasks. Járatoptimalizáláshoz necessary information and preparation of flight plan data model. In order to establish a single integrated enterprise management system operation elements with 1-6 points, data, and through voice-based communications. The reconstituted, respectively. ready software components, process operating software, installing. 9. Transfer of Operating and user documentation. Teaching the basics of the system to function and operate the necessary training in the use. Trial operation arrangement agreed with the Customer in a way that involves the testing of theoretical flight plan model. The test run may be required based on the experience of fine-tuning tasks to carry out corrections in customer negotiation and finalization of models optimized flight plan. The whole system is set into operation. Deliverables hardware: necessary for the efficient (quick-response) to operate the server computer system performance monitor, keyboard, UPS necessary for the safe operation of the operating system, web server, database server, virus protection and a firewall. 2 laptop, mouse, and necessary for the safe operation of the operating system, virus protection, firewall and office software package. The efficient organization of mixed municipal waste collection within the framework of the flights needed to improve route optimization, which reduced the distance traveled, as well as external benefits reduce the load on the routes concerned can be ensured. Scheduling of performance: the database adoption of the necessary equipment ordering, compiled by the contractor database statement within 5 calendar days from the date of the report is ready. b) the supply of goods in the two phases as follows: The contractor was obliged subjugated by these tools contracting following a fault and deficit-free handover immediately commence within 45 calendar days of ready-to report their installation, startup (as above Tasks for the 6th-10th points), and that time is required to perform duties in accordance with section 8. Edényzetre labels mounted outside each case selected by the customer premises. c) The details of the contractor's duty tasks according to task after 11 to 13) of the points set out above, according to the a-b) above, as agreed with the Contracting Authority to fulfill Further information about system requirements included in the technical annex to the document.
  • 1