Call +44 800 9755 164

Public tenders for business in Baja Hungary

Find all Business tenders in the world.
Finding business opportunities has never been easier.

Results for business. Make a new search!

Great for capital works associated Township drinking water quality improvement project (TOP-1.3.0 / 09-11-2013-0069), eliminating the deterioration of water quality parameters, and enhancing the security of water supply

Nagytőke Község Önkormányzat | Published June 22, 2015
Winner
Ékisz Építőipari Kft.
cpvs
45231300, 45252126, 45317100, 71320000

A flat-rate price of a contract related to high capital Township drinking water quality improvement project (TOP-1.3.0 / 09-11-2013-0069), water quality parameters deterioration elimination, and water supply round-wired Sides municipal water supply network: 774 m D90mm PE80 plumbing nodes, isolators and other fittings, and 2 fire hydrants will be placed. Big business power booster block Replacement: The entire booster block Replacing be realized 2 Hydro Multi-E 2 CRE3-04 type (or equivalent) pump and the related pressure-sensing system will be established so that the event is necessary to exclude in the water tower washing can be built new In addition to ongoing pressure maintenance pumps would be able to control the frequency corresponding to the municipal water demands. Hypózó Station Replacement: This communications unit will also be expanded. Szentes booster pump "cold" reserves ensure safe operation, 1 to its incorporation into the same type of pump (Grundfos - Hydro Solo-E CRE 5-10-type booster pump or equivalent) to obtain the cold as a backup, just in case the built-in pump servicing, repair becomes necessary, as in the entire water supply of the town threatening situation may arise if the outage persist in the construction of pipelines Making the licensee plans, permitting and detailed design must prevent. The process margin is not available.

"Making the framework DAOP-2.1.3-12-2012-0010 identification number of projects printing and marketing services"

Bajai Turisztikai Nonprofit Kft. | Published November 5, 2015
Winner
Bács- Szakma Non-profit Közhasznú Zrt.
cpvs
79340000, 79821000

Under the DAOP-2.1.3-12-2012-0010 identification number of projects to carry out printing and marketing services in the framework of a contract as follows: Winning bidder must perform the following tasks: 1. Journalists hospitality: 2 days / 1 night 2 Corporate design Creation - Create 1 3. Promotional city's premiere short film narration - Manufacturing 1 4. Tourism Website - 1 5 promotional advertising items (several species) feathers 1000 Disks 310 pcs, paper bag 1000 6. 15-second commercial spot production and broadcast 5 times the production and placing seventh Billboard: 45 pcs 8 Tourist map editing, publishing 10000 10000 9 Baja walk from the office of a business card 10: 3000 Create Molino 11: 4 x 12 posters printing or Used: 200 showing 13 pieces of leisure activities in and around City publications 2000 pcs 14 Quiz flyout editing 10000 15th Baja 2000 book presenting 16 pieces of large urban Flyers general description of the event: 3000 17 18 Internet campaign 14 days to launch the project Press Release and press clippings are preparing one piece 20. Photo documentation preparation and placement collecting one occasion type 19 "C" table 1 21 Project Closing event press conference tied one occasion 22. Press Release uploading the project closing of the press releases collecting one occasion 23. MAP MAP of Preparation of project-related content and placement 24. 1 session type "D" table 1 Winning Bidder of the Civil Code. 6: 171. §, Civil Code. 6: 173. According to § 24 month warranty is required. For more detailed job description included in the tender documentation.

"In the framework DAOP-2.1.3-12-2012-0010 identification number of projects to carry out printing and marketing services" - Amendment 1

Bajai Turisztikai Nonprofit Kft. | Published December 4, 2015
Winner
Bács- Szakma Non-profit Közhasznú Zrt.
cpvs
79340000, 79821000

Under the DAOP-2.1.3-12-2012-0010 identification number of projects to carry out printing and marketing services in the framework of a contract as follows: Winning bidder must perform the following tasks: 1. Journalists hospitality: 2 days / 1 night 2 Corporate design Creation - Create 1 3. Promotional city's premiere short film narration - Manufacturing 1 4. Tourism Website - 1 5 promotional advertising items (several species) feathers 1000 Disks 310 pcs, paper bag 1000 6. 15-second commercial spot production and broadcast 5 times the production and placing seventh Billboard: 45 pcs 8 Tourist map editing, publishing 10000 10000 9 Baja walk from the office of a business card 10: 3000 Create Molino 11: 4 x 12 posters printing or Used: 200 showing 13 pieces of leisure activities in and around City publications 2000 pcs 14 Quiz flyout editing 10000 15th Baja 2000 book presenting 16 pieces of large urban Flyers general description of the event: 3000 17 18 Internet campaign 14 days to launch the project Press Release and press clippings are preparing one piece 20. Photo documentation preparation and placement collecting one occasion type 19 "C" table 1 21 Project Closing event press conference tied one occasion 22. Press Release uploading the project closing of the press releases collecting one occasion 23. MAP MAP of Preparation of project-related content and placement 24. 1 session type "D" table 1 Winning Bidder of the Civil Code. 6: 171. §, Civil Code. 6: 173. According to § 24 month warranty is required.

Amendment 4 - publicity and marketing services for everyone under SGPOP-2.1.1 / J-12-2012-0108 identification number of "free beach Sugovica development 'project

Baja Marketing Kft. | Published December 3, 2014
Winner
Marketingháló Kft.
cpvs
79340000

Context of publicity and marketing services company in the supply of SGPOP-2.1.1 / J-12-2012-0108 identification number of "free beach Sugovica development" project contract. Contractor shall perform the following tasks: activities to be implemented within the framework of Publicity: Nr. Tasks Unit (piece) 1. Web Site - Create a website linked to the existing framework of the project sub-site projects, creating and updating and continuous operation of one second press release sent out to the project and to initiate the collection of press clippings 3. Create one "B" is the venue of the investment board and outsourcing Preparation 1 4 Photo Documentation (each project site, events, events related to the project) 1 5 press release sent out filling the project closing of the sajtómegjelnések Collection 1 6 MAP MAP project-related content, one seventh the site of the project "D" implemented as part of the preparation and placement of table 1 business marketing activities: Activity Measure Unit Unit 1 spot broadcast on radio advertising time 10 second prize with Facebook x 1 3 4 3000 pcs Flyers PR interview broadcast on the radio time 2 5. Study tour (2 days) for the main tourism industry 50 6. Information flyout English, German piece direct mail campaign 3000 7 103 760 8 pieces of promotional advertising items (several varieties) tax items in 3000 included the detailed terms of the tender documentation.

Framework of publicity and marketing services company in the supply of SGPOP-2.1.1 / J-12-2012-0108 identification number "Sugovica free beach development" project contract. - Amendment 3

Baja Marketing Kft. | Published November 17, 2014
Winner
Marketingháló Kft.
cpvs
79340000

Framework of publicity and marketing services company in the supply of SGPOP-2.1.1 / J-12-2012-0108 identification number "Sugovica free beach development" project contract. Contractor shall perform the following tasks: activities to be implemented within the framework of Publicity: Nr. Duties Unit (piece) 1. Web Site - Create a website related to the project within the framework of existing sub-pages project, and the preparation and updating of continuous operation 1 Press Release 2 deployment of the project and initiate the collection of press releases 3. Create one "B" of the investment board scene and placement preparation 1 4 Photo Documentation (Each project site, events, events related to the project) 1 5 Press release sent out filling the project closing of the sajtómegjelnések Collection 1 6 MAP MAP project-related content, one 7th place of the project "D" implemented as part of the preparation and placement of table 1 Business marketing activities: Activity Measure Unit Unit 1 TV spot broadcast on the radio 10 times Facebook sweepstakes 2 x 1 3 4 3000 pcs Flyers PR interview broadcast on the radio two times 5. Study tour (2 days) for the main tourism industry 50 6. Information flyout English, German pc 3000 7 103 760 8 pieces of direct mail promotional campaign promotional items (several varieties) tax items in 3000 included the detailed terms of reference of the tender documentation.

"Baja City local economic development services and develop economic development strategy"

Baja Város Önkormányzat | Published November 20, 2015
Winner
Grants Europe Consulting Korlátolt Felelősségű Társaság
cpvs
79000000

Economic development of vision, economic development target areas defined as regional / regional positioning (built along the local economy competitive advantages, investor perspective parameters), record the main principles and directions of development. Types of external resources required to achieve the objectives of the mapping and description of the main relevant support programs. Entrepreneur of the vision and development of the target system are summarized in the form of at least 20-page document the above criteria. Determination of potential cooperation opportunities, development of proposals: evaluation of the development potential of existing clusters, clusters of new buds or other institutionalized cooperation opportunities in exploration, survey and development oriented grouping along guiding principles. In particular of: - the existing cluster development potential of the evaluation of the domestic and regional market prospects and competitive position, taking into account - a new cluster buds exploration, identification, - target system and resources available for the 2014-2020 period, adjusted prioritization defined economic vision - a key Determination projects: one sided strategic level descriptions contain key information. Entrepreneur of the analysis are summarized in the form of 20-page strategic document 1, at least 3 key project outline. 2.3. Development of Local Self-Government business incentive program to create jobs, setting up a system of cooperation (co-ordination unit within the organization or institution): Development cooperation structures, generating, by determining the necessary resources; Determination of educational and training links. Contractor is also responsible for drafting the proposal for the establishment to be identified in the above tasks, approved by the local government institutional cooperation related vision system for resource-intensive development of potential external funding opportunities mapping of potential funding for maintenance. A proposal for a system of economic cooperation Contractor summarized in the form of at least 20-page document. Review of Baja City Tourism Development Concept, updated. 12-14) 2010 prepared in August Baja City Tourism Development Concept consultation draft, which has not been adopted, finalized. Contractor is also responsible for tourism development concept above review and update of the improvements achieved in the meantime, changes in tourism trends and patterns taking into account the 2014-2020 EU financial cycle resource potential. The associated with the 2014-2020 EU programming period, the operational programs (especially TOP, GINOP) matched economic development projects to generate: corporate / municipal project concepts evaluation, structuring, interface their existing definition in order to maximize the regional effects determination following additional projects in the strategy. Contractor is also responsible for the formulation of related vision adopted by the local government development plans have been identified as eligible projects in the above tasks and identifying connection designated by the city's economic action areas / implemented those economic development projects. Supporting the implementation of the projects generated resources mapping, matching the identified projects with the operational programs, cross-border and direct EU financial framework of the system.

"Baja City local economic development services and develop economic development strategy"

Baja Város Önkormányzat | Published August 26, 2015
Winner
Grants Europe Consulting Korlátolt Felelősségű Társaság
cpvs
79000000

LOCAL ECONOMIC DEVELOPMENT design services and economic development strategies Economic vision of economic development target areas defined as regional / regional positioning (built along the local economy competitive advantages, investor perspective parameters), record the main principles and directions of development. Types of external resources required to achieve the objectives of the mapping and description of the main relevant support programs. Entrepreneur of the vision and development of the target system are summarized in the form of at least 20-page document the above criteria. Determination of potential cooperation opportunities, development of proposals: evaluation of the development potential of existing clusters, clusters of new buds or other institutionalized cooperation opportunities in exploration, survey and development oriented grouping along guiding principles. In particular of: - the existing cluster development potential of the evaluation of the domestic and regional market prospects and competitive position, taking into account - a new cluster buds exploration, identification, - target system and resources available for the 2014-2020 period, adjusted prioritization defined economic vision - a key Determination projects: one sided strategic level descriptions contain key information. Entrepreneur of the analysis are summarized in the form of 20-page strategic document 1, at least 3 key project outline. 1.3. Development of Local Self-Government business incentive program to create jobs, setting up a system of cooperation (co-ordination unit within the organization or institution): Development cooperation structures, generating, by determining the necessary resources; Determination of educational and training links. Contractor is also responsible for drafting the proposal for the establishment to be identified in the above tasks, approved by the local government institutional cooperation related vision system for resource-intensive development of potential external funding opportunities mapping of potential funding for maintenance. A proposal for a system of economic cooperation Contractor summarized in the form of at least 20-page document. Review of Baja City Tourism Development Concept, updated. 12-14) 2010 prepared in August Baja City Tourism Development Concept consultation draft, which has not been adopted, finalized. Contractor is also responsible for tourism development concept above review and update of the improvements achieved in the meantime, changes in tourism trends and patterns taking into account the 2014-2020 EU financial cycle resource potential. 1.5 related to the 2014-2020 EU programming period, the operational programs (especially TOP, GINOP) matched economic development projects Generation: In order to maximize the regional effects determining corporate / municipal project concepts evaluation, structuring, interface their existing definition of these additional projects in the strategy . Contractor is also responsible for the formulation of related vision adopted by the local government development plans have been identified as eligible projects in the above tasks and identifying connection designated by the city's economic action areas / implemented those economic development projects. Supporting the implementation of the projects generated resources mapping, matching the identified projects with the operational programs, cross-border and direct EU financial framework of the system. The results of the evaluation and structuring existing entrepreneur ideas are summarized in the form of at least 30-page document, which is at least eight pieces of proposed development projects on a description of outline-level (2-3 each page sheets) included.
  • 1