Building installation work

Commissariat à l'énergie atomique et aux énergies alternatives | Published December 23, 2015  -  Deadline January 27, 2016
cpvs
45260000

Framework agreements concern the implementation of development all trades work on all the center's facilities CEA / DAM-Ile de France, the amount per transaction may not exceed EUR 50 000 HT. 3 framework agreements are set up according to the nature of work: Lot 1: Electrical Work strong currents (CFO), low current (IFC) and low current sensitive (CFS), Lot 2: air conditioning work, ventilation, heating (HVAC), plumbing and fluids, Lot 3: finishing work work. The description of each lot is attached. Holders will support: - the establishment of specifications for each work operation, - the conduct of business, - carrying out the work, - the achievement of receiving, - shall document the work and the agree- framework. The center CEA / DAM-Ile de France, located in the municipality of Bruyères-le-Châtel, a fenced area of ​​40 hectares comprises 107 buildings with a total built area for all levels of 200,000 m2. The buildings are generally traditional type reinforced concrete construction of the 50, two buildings of the years 1996/1998, a cut stone castle and some type of modular buildings. In these buildings are spread administrative offices, laboratories and technical facilities and hangars. The contract period will be 2 years firm. It may be extended to 2 times 12 months. The maximum duration will be 4 years.

Construction supervision services

CEA Commissariat à l'énergie atomique et aux énergies alternatives — CEA/DAM Ile-de-France | Published November 14, 2015
Winner
Assystem EOS
cpvs
71520000, 71521000

This market is assistance to the ECA to carry out the scheduling, planning and coordination of technical batches activities and monitoring of these activities by geographical area of ​​the site for making a basic nuclear installation (218) of the CEA Valduc (21 Côte d'Or). Benefits (non-exhaustive) the following is required: - advice and expertise to the MOE, - preparation of the list of tasks to coordinate with the work packages of incumbents, - realization of the schedule of studies and work from the different schedules of enterprises - on site verification of compliance with the planning, identification of deviations, Resolution hard points - progresses different tasks implemented - monitoring of work by geographical area: daily coordination of business activities, respect security, management coactivités, adequacy verification means / resources, resolving conflicts and spatial processing hazards, - monitoring the work by geographical areas: coordination, monitoring constraints of performance, safety compliance, coactivités, verification the means / resources adequacy, - key management, handling of resources, achieving the contradictory findings of provision of local ..., - participation in site meetings and control the meeting point of the day.

Benefits-planning-scheduling coordination of enforcement, work and tests and studies monitoring work activities by geographic areas for the implementation of technical packages in the context of achieving a nuclear facility CEA center Valduc.

CEA Commissariat à l'énergie atomique et aux énergies alternatives – CEA/DAM Île-de-France | Published October 25, 2014  -  Deadline December 4, 2014
cpvs
71520000, 71521000

This market is assistance to CEA to perform scheduling, planning and coordination of technical and monitoring of these activities by geographic areas of the site carrying lots of a basic nuclear installation (218) of the CEA Valduc (21 Gold Coast). --- The following services (non exhaustive list) are required: - advice and expertise MOE - develop a list of tasks to coordinate with the holders of work packages enterprises - achieving the schedule of studies and from different schedules of enterprises - on-site verification of compliance planning, identifying deviations, solving hard points - measuring the progress of various tasks implemented - monitoring work by geographical areas: daily coordination of business activities , safety compliance, management of co-activities, verification means / resources adequacy, resolution of spatial conflicts and treatment hazards, - monitoring work by geographical areas: coordination, monitoring implementation constraints, safety compliance, co-activities checking the means / resources adequacy, - key management, handling facilities, production contradictory findings of providing local ... - participation in site meetings and steering the meeting point of the day.

Guard services

CEA (Commissariat à l'énergie atomique et aux énergies alternatives) | Published January 17, 2017
cpvs
79713000, 79714000, 79711000

BAR - MY3 - Access Control Building.

Phase 1: the only pedestrian access will be a holder of access control at the entry into the guard post and output. The vehicles will leave the shipyard in the Northeast portal will not be controlled by the holder.

Phase 2: the incumbent will be responsible to control all inputs and outputs that are pedestrians or vehicles. The main tasks will be requested:

Ensure the access control of the site area (registers).

Ensuring daily archiving of all access requests (business listings).

Manage the keys held by the guard.

Identify and record on the register or abnormal events sought by the guidelines provide links or telephone security contacts with the units of the naval base.

Holding the position of notebook paper and set the records (and access keys).

Keep informed designated officials from CEA and SID.

BAR - MY3 - access control sites.

Phase 1: the only pedestrian access will be a holder of access control at the entry into the guard post and output. The vehicles will leave the shipyard in the Northeast portal will not be controlled by the holder.

Phase 2: the incumbent will be responsible to control all inputs and outputs that are pedestrians or vehicles. The main tasks will be requested:

The number of input / output is around 200 people with peaks of more than 300 people.

The site configuration requires a minimum number of 2 supervisors agents during defined schedules from 6:00 at 20:00.