Public tenders for business in Deggendorf Germany

Find all Business tenders in the world.
Finding business opportunities has never been easier.

Results for business. Make a new search!
BusinessGermanydeggendorf

Liability insurance services

Donauisar Klinikum Deggendorf-Dingolfing-Landau gKU | Published October 7, 2014  -  Deadline November 17, 2014
cpvs
66516000

Operating and environmental liability insurance and environmental impairment insurance for the Danube River Isar Hospital Deggendorf Dingolfing-Landshut gku incl. Joined subsidiaries (3-year contract with renewal clause, insurance for business liability insurance 20 million EUR for bodily injury and property damage to 1 000 000 EUR for financial loss, 1.5-fold maximized in policy year).

Construction project management services

Landkreis Deggendorf | Published December 9, 2015
Winner
BPM Bau- und Projektmanagement Hartl GmbH
cpvs
71541000, 71240000

The current school center Deggendorf consists of 4 schools that are built in clusters construction together. Robert-Koch-Gymnasium (Natural Sciences Technological and Economic and Social Science High School). Business School (State School of Economics). Vocational School I (Commercial Technical Vocational School). Vocational School II (Commercial Vocational School). The construction work took place in 2007 at the last moment in the form of the high school cafeteria with lunch. Because of the constraint points to the structural conditions of the stock such as fire protection, thermal protection and energy efficiency, soundproofing, technical equipment, media technology, accessibility, static, etc. the 4 schools to be rebuilt. Successive partial terminations and new buildings of the individual schools an economical, modern and above all future-oriented sustainable design should be with regard to the Building Maintenance on the taken away. The commercial vocational school and the business school should be combined into one complex. Persist on the plot to the gym and the cafeteria with lunch of the high school. Will be awarded with this order the project Expensive services. 9 "project management services in the construction and real estate" of AHO-commission "Project management / project management," Stand 3.2009. There is a gradual commissioning: 9, 9, 9, A legal entitlement to commission further steps does not exist. The successive partial terminations and new construction work carried out during operation. Must be given special consideration and examination periods holidays. 4.2014.

Architectural, engineering and planning services

Landkreis Deggendorf | Published November 18, 2015
Winner
ARGE HIW & Dömges
cpvs
71240000, 71200000

The current school center Deggendorf consists of 4 schools that are built together in cluster construction. Robert-Koch-Gymnasium (Natural Sciences Technological and Economic and Social Science High School); Business School (State School of Economics); Vocational School I (Commercial Technical Vocational School); Vocational School II (Commercial Vocational School); The construction work took place in 2007 at the last moment in the form of the high school cafeteria with lunch. Because of the constraint points to the structural conditions of the stock such as fire protection, thermal protection and energy efficiency, soundproofing, technical equipment, media technology, accessibility, static, etc. The four schools are to be rebuilt. Successive partial terminations and new buildings of the individual schools an economical, modern and above all future-oriented sustainable planning should be brought to the Building Maintenance also in terms of the way. The commercial vocational school and the business school should be combined into one complex. Perhaps the workshops - to obtain, this will be decided following approval of the funding body - at least partially. Will be awarded with this order, the architectural services and the achievements of the space forming expansion including the fire protection engineering. There is a gradual commissioning: Level 1: Basic Data and Preliminary Planning; Stage 2: Preliminary design and approval planning; Level 3: implementation planning, preparation and participation in the award; Stage 4: Site supervision, site supervision and documentation; The successive partial terminations and new construction work carried out during operation.

Architectural and related services

Landkreis Deggendorf | Published December 9, 2015
Winner
lab landschaftsarchitektur Brenner
cpvs
71200000, 71300000, 71400000, 71320000, 71322500, 71322000, 71420000, 71421000, 71222000

The current school center Deggendorf consists of 4 schools that are built in clusters construction together. Robert-Koch-Gymnasium (Natural Sciences Technological and Economic and Social Science High School). Business School (State School of Economics). Vocational School I (Commercial Technical Vocational School). Vocational School II (Commercial Vocational School). The construction work took place in 2007 at the last moment in the form of the high school cafeteria with lunch. Because of the constraint points to the structural conditions of the stock such as fire protection, thermal protection and energy efficiency, soundproofing, technical equipment, media technology, accessibility, static, etc. the 4 schools to be rebuilt. Successive partial terminations and new buildings of the individual schools an economical, modern and above all future-oriented sustainable design should be with regard to the Building Maintenance on the taken away. The commercial vocational school and the business school should be combined into one complex. Persist on the plot to the gym and the cafeteria with lunch of the high school and the gas station. Appendix 13) awarded. There is a gradual Assignment: performance image Freianlagen: Level 1: basic evaluation and preliminary planning. Stage 2: Preliminary design and approval planning. Participation in the award. Step 4: property supervision and documentation, as well as property management. Offered Services Road equipment: Level 1: basic evaluation and preliminary planning. Stage 2: Preliminary design and approval planning. Level 3: Detailed design, Preparation of tender. Step 4: property management and construction management. The successive partial terminations and new construction work carried out during operation. The challenge must be taken into account particularly testing times and holiday periods. Start of measure: 2014. completion of the construction / commissioning: 2021st

Load-bearing structure design services

Landkreis Deggendorf | Published November 28, 2015
Winner
Diplom-Ingenieure Kiendl & Moosbauer
cpvs
71327000

The current school center Deggendorf consists of four schools that are built together in cluster construction. Robert-Koch-Gymnasium (Natural Sciences Technological and Economic and Social Science High School), School of Economics (National School of Economics), vocational school I (Commercial Technical Vocational School), Vocational School II (Commercial Vocational School). The construction work took place in 2007 at the last moment in the form of the high school cafeteria with lunch. Because of the constraint points to the structural conditions of the stock such as fire protection, thermal protection and energy efficiency, soundproofing, technical equipment, media technology, accessibility, static, etc. the 4 schools to be rebuilt. Successive partial terminations and new buildings of the individual schools an economical, modern and above all future-oriented sustainable design should be with regard to the Building Maintenance on the taken away. The commercial vocational school and the business school should be combined into one complex. Persist on the plot to the gym and the cafeteria with lunch of the high school and the gas station. 8 + 9). There is a gradual commissioning: Level 1: Basic Data and Preliminary Planning, Level 2: Preliminary design and approval planning, Stage 3: Detailed design, Preparation of tender, 8 + 9). The successive partial terminations and new construction work carried out during operation. Must be given special consideration and examination periods holidays. Start of measure: 2014. completion of the construction / commissioning: 2021st

Engineering services

Landkreis Deggendorf | Published December 9, 2015
Winner
Rudolf Mages
cpvs
71300000

The current school center Deggendorf consists of 4 schools that are built in clusters construction together. Robert-Koch-Gymnasium (Natural Sciences Technological and Economic and Social Science High School); Business School (State School of Economics); Vocational School I (Commercial Technical Vocational School); Vocational School II (Commercial Vocational School). The construction work took place in 2007 at the last moment in the form of the high school cafeteria with lunch. Because of the constraint points to the structural conditions of the stock, such as fire protection, thermal insulation undEnergieeffizienz, soundproofing, technical equipment, media technology, accessibility, static, etc. the 4 schools to be rebuilt. Successive partial terminations and new buildings of the individual schools an economical, modern and above all future-oriented sustainable design should be with regard to the Building Maintenance on the taken away. The Commercial Vocational School and dieWirtschaftsschule should be combined into one complex. Persist on the plot to the gym and the cafeteria with lunch of the high school and the gas station. 7). There is a gradual Assignment: Lot 1: 2 - Planning; 4: is awarded to the extent necessary for specific projects); 7 - Participation in the award; 9 - property management. Lot 2: 2 - Planning; 4: is awarded to the extent necessary for specific projects); 7 - Participation in the award; 9 - property management; The successive partial terminations and new construction work carried out during operation. Must be given special consideration and examination periods holidays. Completion of the works / Commissioning: 2021;
  • 1