Call +44 800 9755 164

Public tenders for radio, tv, telecommunications in Romania

Find all Broadcasting tenders in the world.
Finding business opportunities has never been easier.

Results for broadcasting. Make a new search!

Telecommunications services

Societatea Nationala de Transport Gaze Naturale Transgaz SA Medias | Published January 14, 2017  -  Deadline January 31, 2017
Telecommunications services

Telecommunications services

Societatea Nationala de Transport Gaze Naturale Transgaz SA Medias | Published December 24, 2016  -  Deadline January 31, 2017

The total estimated value of the framework agreement, the two years is € 3,131,112.

Communications services for group I - the main communication path - the estimated value of the framework agreement is a minimum of 113 376 EUR, ie a maximum of € 1,469,292.

Communications services for lot II - reduntanta communication path - the estimated value of the framework agreement is a minimum of 61 776 EUR, ie a maximum of 851 160 EUR.

Group III for wireless communication with guaranteed bandwidth and best effort - the estimated value of the framework agreement is less than 26 700, ie a maximum of 810 660 EUR.

Radio equipment

Autoritatea Nationala pentru Administrare si Reglementare in Comunicatii | Published December 9, 2016  -  Deadline January 23, 2017

Contract to supply four (4) monitoring systems spectral capabilities geolocation covering the supply of equipment and software, integration equipments and softwares in the 4 systems, tests of acceptance for all systems, as well as user training, according to minimum mandatory requirements stipulated in Section 2: Specifications.

Television equipment

Societatea Româna De Televiziune | Published December 22, 2016
TV equipment

Aerial and related services

Compania Nationala Aeroporturi Bucuresti SA | Published December 24, 2016  -  Deadline January 26, 2017

Aeronautical telecommunications services that will be received and transmitted messages have operational (air transport industry) and specific messages you type B (IATA).

Advisory and consultative engineering services

Judetul Brasov | Published December 22, 2016
Study on sites and establish the necessary means of radio navigation, design and validation of flight, instrument flight procedures for Ghimbav Brasov International Airport.

Railway construction works

Compania Nationala de Cai Ferate „CFR” – SA | Published December 7, 2016  -  Deadline February 1, 2017

Rehabilitation of the railway Brasov-Simeria component of Corridor Rhine - Danube to flow with maximum speed of 160 km / h, section Brasov - Sighisoara, subsections: 1. 3. catalytic Sighisoara and Brasov -Apata;

The main objective of the rehabilitation is the circulation of passengers trains with a top speed of 160 km / h and freight trains with a top speed of 120 km / h.

Section Brasov - Sighisoara is divided into three subsections, of which only subsections 1 and 3 are subject to this auction:

Subsection 1. Cap X Brasov - Apata Capy (km 170 + 285 000 - km 208 + 088.954);

Subsection 2. Apata CapY- Cap X Cata (km 208 + 088.954 - 157.940 km 236 +);

Subsection 3. Cap X Cata - Sighisoara Cap Y (km 236 + 157 940 - km 282 + 842).

The two subsections auctioned presently is sectioning 11 points, all centralized electrodynamics (CED) 4 stations cf 7 halts movement 8 and halts trading halts. There are 2 main railway junctions on the route and a double tunnel of 660 m length.

Project rehabilitated subsections Brasov Apata and Cata - Sighisoara focused on the following categories of works: earthworks railroads, consolidations, superstructure, bridges and viaducts, culverts, tunnels, overpasses, roads, environmental protection, line installation protection, energoalimentare telecommunications, fiber optics, information system for travelers, signaling communications, video surveillance, architecture, structure, electrical, plumbing, Thermoventilators, bank protection, signaling, railway traffic.

The project includes technical specifications, technical memoranda, drawings, bills of quantities and will be published in SEAP so that all potential bidders have access to information needed to design supply.

During the execution of works is 48 months plus 60 months notice period of defections.

  • 1