Call +44 800 9755 164

Public tenders for radio, tv, telecommunications in Sosnowiec Poland

Find all Broadcasting tenders in the world.
Finding business opportunities has never been easier.

Results for broadcasting. Make a new search!

Supervision of building work

Gmina Sosnowiec | Published March 10, 2017  -  Deadline March 24, 2017
cpvs
71247000, 71630000

1.Przedmiotem order was divided into 4 parts:

I.Usługa involving the exercise of the author's supervision of the construction;

II.Usługa involving the performance of their duties inspector investor in the installation specialty in the network, installation and electrical equipment and power;

III.Usługa involving the performance of their duties inspector investor in the installation specialty in the network, installation and telecommunications equipment;

of the construction for the investment task pn.:"Przebudowa footbridge over the railway tracks in the area of ​​ul. Oil - Theatre in Sosnowiec - Stage II ".

IV.Usługa involving the performance of their duties investor's supervision inspector in the specialties of road engineering of the construction for the investment task pn.:"Budowa bus lane Facilities in the street. 3 Maja in Sosnowiec between small hubs. "

2.Szczegółowy description of the contract - Annex No. 3 hereto.

Supervision of building work

Gmina Sosnowiec | Published March 23, 2017  -  Deadline March 31, 2017
cpvs
71247000, 71630000

1.Przedmiotem order was divided into four parts:

I.Usługa involving the exercise of the author's supervision of the construction;

II.Usługa involving the performance of their duties inspector investor in the installation specialty in the network, installation and electrical equipment and power;

III.Usługa involving the performance of their duties inspector investor in the installation specialty in the network, installation and telecommunications equipment;

of the construction for the investment task pn.:"Przebudowa footbridge over the railway tracks in the area of ​​ul. Oil - Theatre in Sosnowiec - Stage II ".

IV.Usługa involving the performance of their duties investor's supervision inspector in the specialties of road engineering of the construction for the investment task pn.:"Budowa bus lane Facilities in the street. 3 Maja in Sosnowiec between small hubs. "

2.Szczegółowy description of the contract - Annex No. 3 hereto.

Gully emptying services

Gmina Miasto Sosnowiec – reprezentowana przez Prezydenta Miasta Pana Arkadiusza Chęcińskiego | Published March 3, 2015
Winner
Mieczysław Grzanka Zakład Ogólnobudowlany
cpvs
90642000, 90641000

The contract is for the provision of the service including maintenance of storm water drainage system in the city of Sosnowiec. Execution of the service will consist of the performance based on the needs of the following steps: Cleaning the street inlets (including lymphatic), - clearing the inlet grille of any impurities - using brushes and chisels, and after cleaning and removing the grids manually clean the sump to the bottom using the shovels and shovel to extract sediment loading and waste disposal for waste disposal sites or mechanical clearing using a car specialist and waste disposal for waste disposal sites. Cleaning the street inlets and the clearing of drains - gully grates clean of any contamination - using brushes and chisels, and after cleaning and removing the grids manually clean settling to the bottom using shovels and shovel for removing sediments and the drain lines by dragging the brush or plunger , buckets channel, czyszczaków disc, spiral duct, loading and waste disposal for waste disposal sites or mechanical clearing using a car specialist and waste disposal for waste disposal sites. Cleaning the lymph wells (septic) - manual cleaning of wells using shovels and shovel to extract sediment loading and waste disposal for waste disposal sites or mechanical clearing using a specialized car to the bottom of the well, and waste disposal for waste disposal sites. Cleaning of manholes for storm water drainage passageways - manual cleaning of wells using shovels and shovel to extract sediment loading and waste disposal for waste disposal sites or mechanical clearing using a specialized car to the bottom of the well, and waste disposal for waste disposal sites. Contractor depending on the technical state of the channel, and the type of contamination should use the appropriate method of cleaning - mechanical or hydrodynamic. After completion of the separator should be filled with clean water. Cleaning the settlers - the removal of floating debris accumulated (trash, leaves, branches), then drain and clean the sludge settling with car specialist waste disposal to waste disposal sites. Cleaning grit - removal of dirt with shovels, loading and waste disposal for waste disposal sites. Sewage tank cleaning rainwater 23,0x6,0m size; active depth 1,3 m - removing floating debris collected (leaves, branches), and if the tank is emptied - other submerged solid impurities (tires, boards, stones, debris), emptying of sludge using specialized car, rinsing under pressure walls and the bottom of the tank, loading and waste disposal for waste disposal sites. Cleaning the line drain grates covered with ACO DRAIN - disassembly and assembly of the grid, manual cleaning gutters, loading and waste disposal for waste disposal sites or mechanical pumps to clean using a strong stream of water passing in order to ensure the free flow of rain water. Cleaning of storm water outlets - to remove impurities from the surface around the mouth, loading and waste disposal for waste disposal sites. Dlaczynności mowing unit valuation flat terrain and slopes averaged. Plugging the intakes of illegal connections to the storm water drainage mass concrete with natural aggregate. Overview of the technical condition of the storm water monitoring method using a TV camera, and a record kept of the inspections carried out (the video recorded on electronic media - (USB memory - USB stick) with a detailed description of the technical condition of the monitored network segment and drainage wells, indicating the material and size of the monitored network segment . Taking the pipe section ingrown roots of trees with a chain or a rotary cutter driven wyrębiarek the assumed streams of water in place of the traditional nozzle płuczących- hydrodynamic or mechanical using a car specialist. The valuation unit for mowing operations flat terrain and slopes averaged. Cleaning (blowdown) open ditches (drainage ditches outside lane) - this activity includes mining namułu the watercourse and the shaping of slopes to a thickness of 40 cm with exports to the waste disposal sites. The security solution asphalt concrete components of water treatment plants and outlets deszczowych- twice. Painting paints chlorokauczkowymi / corrosion metal railings sewage rainwater tanks, metal grates at outlets of storm water

Gully cleaning services

Gmina Miasta Sosnowiec – reprezentowana przez Prezydenta Miasta | Published November 29, 2014  -  Deadline January 8, 2015
cpvs
90640000, 90642000

The contract is for the provision of the service including maintenance of storm water drainage system in the city of Sosnowiec. Execution of the service will consist of the performance based on the needs of the following steps: Cleaning the street inlets (including lymphatic), - clearing the inlet grille of any impurities - using brushes and chisels, and after cleaning and removing the grids manually clean the sump to the bottom using the shovels and shovel to extract sediment loading and waste disposal for waste disposal sites or mechanical clearing using a car specialist and waste disposal for waste disposal sites. Cleaning the street inlets and the clearing of drains - gully grates clean of any contamination - using brushes and chisels, and after cleaning and removing the grids manually clean settling to the bottom using shovels and shovel for removing sediments and the drain lines by dragging the brush or plunger , buckets channel, czyszczaków disc, spiral duct, loading and waste disposal for waste disposal sites or mechanical clearing using a car specialist and waste disposal for waste disposal sites. Cleaning the lymph wells (septic) - manual cleaning of wells using shovels and shovel to extract sediment loading and waste disposal for waste disposal sites or mechanical clearing using a specialized car to the bottom of the well, and waste disposal for waste disposal sites. Cleaning of manholes for storm water drainage passageways - manual cleaning of wells using shovels and shovel to extract sediment loading and waste disposal for waste disposal sites or mechanical clearing using a specialized car to the bottom of the well, and waste disposal for waste disposal sites. Contractor depending on the technical state of the channel, and the type of contamination should use the appropriate method of cleaning - mechanical or hydrodynamic. After completion of the separator should be filled with clean water. Cleaning the settlers - the removal of floating debris accumulated (trash, leaves, branches), then drain and clean the sludge settling with car specialist waste disposal to waste disposal sites. Cleaning grit - removal of dirt with shovels, loading and waste disposal for waste disposal sites. Sewage tank cleaning rainwater 23,0x6,0m size; active depth 1,3m - removing floating debris collected (leaves, branches), and if the tank is emptied - other submerged solid impurities (tires, boards, stones, debris), emptying of sludge using specialized car, rinsing the walls and under pressure bottom of the tank, loading and waste disposal for waste disposal sites. Cleaning the line drain grates covered with ACO DRAIN - disassembly and assembly of the grid, manual cleaning gutters, loading and waste disposal for waste disposal sites or mechanical pumps to clean using a strong stream of water passing in order to ensure the free flow of rain water. Cleaning of storm water outlets - to remove impurities from the surface around the mouth, loading and waste disposal for waste disposal sites. Valuation unit for mowing operations flat terrain and slopes averaged. Plugging the intakes of illegal connections to the storm water drainage mass concrete with natural aggregate. Overview of the technical condition of the storm water monitoring method using a TV camera, and a record kept of the inspections carried out (the video recorded on electronic media - (USB memory - USB stick) with a detailed description of the technical condition of the monitored network segment and drainage wells, indicating the material and size of the monitored network segment . Taking the pipe section ingrown roots of trees with a chain or a rotary cutter driven wyrębiarek the assumed streams of water in place of the traditional rinsing nozzles - hydrodynamic or mechanical using a car specialist. The valuation unit for mowing operations flat terrain and slopes averaged. Cleaning (blowdown) open ditches (drainage ditches outside lane) - this activity includes mining namułu the watercourse and the shaping of slopes to a thickness of 40 cm with exports to the waste disposal sites. The security solution asphalt concrete elements sewage and storm water outlets - twice. Painting paints chlorokauczkowymi / corrosion metal railings sewage rainwater tanks, metal grating with rain water outlets

Sosnowiec: supply brand new backhoe loaders to carry out the statutory work

 | Published July 11, 2016  -  Deadline July 20, 2016
cpvs
34144710

Dostawa koparki-ładowarki: fabrycznie nowej i nie starszej niż z 2015r. rok prod. 2015 lub 2016 sprawnej, gotowej do eksploatacji ,wolnej od wad prawnych, dopuszczonej do pracy w krajach Unii Europejskiej na podstawie świadectwa homologacji krajowej lub wspólnoty europejskiej, z zastrzeżeniem, aby skrzynia biegów, mosty i silnik były wyprodukowane przez jednego-tego samego producenta. 3. PODSTAWOWE PARAMETRY TECHNICZNE : PARAMETRY TECHNICZNE 1.silnik wysokoprężny,turbodoładowany,czterocylindrowy,szesnastozaworowy,o mocy min 90 kM,o pojemności min 4l, spełniający normy emisji spalin obowiązujące w RP zgodnie z datą produkcji koparko-ładowarki: TIER4 lub STAGE IIIb 2. układ napędowy na obie osie 4 x 4,z możliwością wyboru napędu-hamowania na jedną lub obie osie 3. most przedni wahliwy, średnica zawracania bez hamowania nie więcej niż 9,0 m 4. układ kierowniczy wspomagany hydraulicznie, 5. skrzynia biegów 4 biegowa, synchroniczna ze zmiennikiem momentu max prędkość jazdy około 35 km na h 6. układ hamulcowy na jedną lub dwie osie, z możliwością hamowania prawym lub lewym kołem tylnego mostu - automatyczny układ kompensacji hamowania 7. układ hydrauliczny pompa hydrauliczna wielotłoczkowa, o wydajności nie mniejszej niż 165l na min możliwość dostosowania wydajności układu hydraulicznego do bieżących potrzeb 8. układ elektryczny 12V z alternatorem 95A, przewody w pancerzach zabezpieczających przed wilgocią i drganiami przenoszonymi przez maszynę, akumulator o pojemności min 115Ah , elektryczny przełącznik zmiany kierunku jazdy 9. Inne układy układ kompensujący drgania układu ładowarkowego w czasie jazdy - pływająca łyżka układ powrót do kopania łyżki ładowarkowej PARAMETRY ROBOCZE 1. Część koparkowa łyżka koparkowa o szerokości min 600 mm 2. Ramię koparkowe O zmiennej długości z wysuwem teleskopowym głębokość kopania min 5,50m, udźwig na ramieniu : wsuniętym - min 1400 kg, wysuniętym min 700 kg 3. Część ładowarkowa Łyżka wielofunkcyjna z możliwością spychania, rozściełania, wyrównywania, ładowania, chwytania, kopania tzw. 6 w 1 z zębami i widłami do palet rozstaw max około 2,00m, otwierana - pojemność min 1,0 m3, z możliwością płynnej regulacji zacisku szczęki wysokość załadunku około 3,2 m; 4. Ramiona ładowarkowe w układzie równoległym, z systemem samopoziomowania łyżki 5. Stabilizatory Tylne, niezależne wysuwane hydraulicznie, z regulacja luzów INNE PARAMETRY 1 Kabina operatora O poziomie hałasu spełniającym normy w tym zakresie, ogrzewana, wyposażona w wentylator, oświetlana, cyfrowy zegar i licznik motogodzin sygnał dźwiękowy przód-tył oraz sygnał cofania przednia szyba z wycieraczkami i spryskiwaczem bezwładnościowy pas bezpieczeństwa Drzwi po obu stronach, 2 lusterka wsteczne uchylne okna boczne, szyba tylna otwierana z wycieraczką,Fotel operatora regulowany, z podgrzewaniem, amortyzowany Zamki hydrauliczne Apteczka, trójkąt ostrzegawczy, tablica wyróżniająca, gaśnica, radio + głośniki Immobiliser, skrzynka narzędziowa + smarownica, klucz do kół, ciśnieniomierz) Błotniki przednie 2 Oznakowanie świetlne Światła drogowe Halogenowe światła robocze: 4 z przodu i 4 z tyłu lampa migowa - sygnał świetlny kogut 3 zbiornik paliwa min 160 litrów 4 wyposażenie gaśnica, trójkąt ostrzegawczy..

Sosnowiec: supply brand new backhoe loaders to carry out statutory work.

Miejski Zakład Usług Komunalnych | Published July 29, 2016  -  Deadline July 21, 2016
Winner
Interhandler Sp. z o.o., Wapienna 6, 87-100 Toruń, kraj/woj. kujawsko-pomorskie.
cpvs
34144710

Dostawa koparki-ładowarki: fabrycznie nowej i nie starszej niż z 2015r. rok prod. 2015 lub 2016 sprawnej, gotowej do eksploatacji ,wolnej od wad prawnych, dopuszczonej do pracy w krajach Unii Europejskiej na podstawie świadectwa homologacji krajowej lub wspólnoty europejskiej, z zastrzeżeniem, aby skrzynia biegów, mosty i silnik były wyprodukowane przez jednego-tego samego producenta. 3. PODSTAWOWE PARAMETRY TECHNICZNE : PARAMETRY TECHNICZNE 1.silnik wysokoprężny,turbodoładowany,czterocylindrowy,szesnastozaworowy,o mocy min 90 kM,o pojemności min 4l, spełniający normy emisji spalin obowiązujące w RP zgodnie z datą produkcji koparko-ładowarki: TIER4 lub STAGE IIIb 2. układ napędowy na obie osie 4 x 4,z możliwością wyboru napędu-hamowania na jedną lub obie osie 3. most przedni wahliwy, średnica zawracania bez hamowania nie więcej niż 9,0 m 4. układ kierowniczy wspomagany hydraulicznie, 5. skrzynia biegów 4 biegowa, synchroniczna ze zmiennikiem momentu max prędkość jazdy około 35 km na h 6. układ hamulcowy na jedną lub dwie osie, z możliwością hamowania prawym lub lewym kołem tylnego mostu - automatyczny układ kompensacji hamowania 7. układ hydrauliczny pompa hydrauliczna wielotłoczkowa, o wydajności nie mniejszej niż 165l na min możliwość dostosowania wydajności układu hydraulicznego do bieżących potrzeb 8. układ elektryczny 12V z alternatorem 95A, przewody w pancerzach zabezpieczających przed wilgocią i drganiami przenoszonymi przez maszynę, akumulator o pojemności min 115Ah , elektryczny przełącznik zmiany kierunku jazdy 9. Inne układy układ kompensujący drgania układu ładowarkowego w czasie jazdy - pływająca łyżka układ powrót do kopania łyżki ładowarkowej PARAMETRY ROBOCZE 1. Część koparkowa łyżka koparkowa o szerokości min 600 mm 2. Ramię koparkowe O zmiennej długości z wysuwem teleskopowym głębokość kopania min 5,50m, udźwig na ramieniu : wsuniętym - min 1400 kg, wysuniętym min 700 kg 3. Część ładowarkowa Łyżka wielofunkcyjna z możliwością spychania, rozściełania, wyrównywania, ładowania, chwytania, kopania tzw. 6 w 1 z zębami i widłami do palet rozstaw max około 2,00m, otwierana - pojemność min 1,0 m3, z możliwością płynnej regulacji zacisku szczęki wysokość załadunku około 3,2 m; 4. Ramiona ładowarkowe w układzie równoległym, z systemem samopoziomowania łyżki 5. Stabilizatory Tylne, niezależne wysuwane hydraulicznie, z regulacja luzów INNE PARAMETRY 1 Kabina operatora O poziomie hałasu spełniającym normy w tym zakresie, ogrzewana, wyposażona w wentylator, oświetlana, cyfrowy zegar i licznik motogodzin sygnał dźwiękowy przód-tył oraz sygnał cofania przednia szyba z wycieraczkami i spryskiwaczem bezwładnościowy pas bezpieczeństwa Drzwi po obu stronach, 2 lusterka wsteczne uchylne okna boczne, szyba tylna otwierana z wycieraczką,Fotel operatora regulowany, z podgrzewaniem, amortyzowany Zamki hydrauliczne Apteczka, trójkąt ostrzegawczy, tablica wyróżniająca, gaśnica, radio + głośniki Immobiliser, skrzynka narzędziowa + smarownica, klucz do kół, ciśnieniomierz) Błotniki przednie 2 Oznakowanie świetlne Światła drogowe Halogenowe światła robocze: 4 z przodu i 4 z tyłu lampa migowa - sygnał świetlny kogut 3 zbiornik paliwa min 160 litrów 4 wyposażenie gaśnica, trójkąt ostrzegawczy...

Supervision of building work

Gmina Sosnowiec | Published February 9, 2017  -  Deadline March 21, 2017
cpvs
71247000, 71630000

1.Przedmiotem order was divided into four parts:

I.Usługa involving the exercise of the author's supervision of the construction;

II.Usługa involving the performance of their duties inspector investor in the installation specialty in the network, installation and electrical equipment and power;

III.Usługa involving the performance of their duties inspector investor in the installation specialty in the network, installation and telecommunications equipment;

Oil - Theatre in Sosnowiec - Stage II ".

3 Maja in Sosnowiec between small hubs. "

2.Szczegółowy description of the contract - Annex No. 3 hereto.

The scope of works, which will be exercised supervision of the project documentation was placed on the BIP Municipal Office in Sosnowiec at: http://www.bip.um.sosnowiec.pl/Article/get/id,519003.html

Object of the contract includes the surveillance author: author's supervision of the construction to ensure the achievement of high quality of the works and their timely implementation, in particular:

a) a statement in the course of construction works compliance of the implementation of the project, indicating irregularities, giving opinions on the applications the construction manager for possible changes, evaluation of the results of research carried out on site,

b) request the suspension of construction work in a situation of potential danger, or the execution of works contrary to the design or construction permit,

c) agree on the possibility of introducing alternative solutions to those provided for in the draft submitted by the investor's supervision inspector.

It is expected to complete 14 stays at the construction site inspector's supervision and 2 stays in the field of completing documents to PINB and WINB. A total of 16 visits.

Handshake possibility of introducing alternative solutions to those provided for in the project, reported by the head of the construction will be contracted separately by the Contractor.

The actual start date of the contract - in accordance with the model contract (Annex No. 11 hereto).

Oil - Theatre in Sosnowiec - Stage II ".

It provides for a total of 12 full stay of the construction inspector investor.

General obligations of the Investor's Supervision in Annex No. 3 hereto.

The actual start date of the contract - in accordance with the model contract (Annex No. 12 hereto).

Oil - Theatre in Sosnowiec - Stage II ".

It provides for a total of 12 full stay of the construction inspector investor.

General obligations of the Investor's Supervision in Annex No. 3 hereto.

The actual start date of the contract - in accordance with the model contract (Annex No. 12 hereto).

3 Maja in Sosnowiec between small hubs. "

General obligations of the Investor's Supervision in Annex No. 3 hereto.

The actual start date of the contract - in accordance with the model contract (Annex No. 13 hereto).

Sosnowiec: Delivery of brand new remonter road, mounted on a truck, works statutory MZUK Sosnowiec

Miejski Zakład Usług Komunalnych | Published July 21, 2016  -  Deadline July 29, 2016
cpvs
34921000

Delivery of brand new remonter road, mounted on a truck, works statutory MZUK Sosnowiec. Remonter is intended to eliminate the defects and large surface cracks using chippings and bitumen emulsion which respectively dispensed and mixed with each other in the working head are integrated under pressure in the damaged spot. Delivery of the machine free from legal defects and factory, unused, fulfills the conditions for admission to traffic in accordance with applicable regulations and the corresponding requirements of products approved for marketing in the country. The Contractor shall ensure that the parameters of the machine, its technical features and design as well as appliances conform to all applicable standards and safety requirements, as well as the complete machine or its individual components are not encumbered with any rights of third parties. The contractor time of the transfer of the contract Purchaser will have the legal right to dispose of the machine and all its components. CHASSIS: year 2015/2016, brand new, unregistered, two-axle, with a maximum total weight of 18 tons of diesel engine powered diesel oil, equipped with engine brake, power min 240 hp Exhaust: vertical, piped up behind the cab Transmission : controlled manually, the buzzer enabled reverse, single-disc dry clutch, full differential lock rear axle, speed limiter to 90 km / h. Brakes: Dual circuit, equipped with ABS, equipped with ASR, equipped with ESP or equivalent, disc brakes on front and rear axle suspension system: spacing of not less than 4000 mm, capacity front suspension: min 7500 kg, load capacity rear suspension: min 11 500 kg pneumatic rear suspension, front suspension on parabolic leaf springs, stabilizer front axle, rear axle stabilizer. Steering: Power-assisted hydraulic steering wheel with adjustable height and tilt, steering wheel lock and immobilizer side walls removed. Cab type: day, short, air-conditioned, white or RAL2011 or similar; mirrors heated and electronically controlled, rear right curb. wide-angle mirrors, on-board computer in the Polish language, mute noise to 80 dB, the steering wheel on the left hand column adjustable, radio installation and antenna, driver's seat adjustable air suspension and headrest, seat covers: washable, carpeting the floor with plastic + set of rubber mats, digital tachograph legalization of valid and consistent EC extinguisher Polish production, warning triangle, first aid kit, a beam of light (strobe) on the roof: double-sided beam with an inscription SERVICE ROAD + 2 yellow flashing lights, front bumper steel. Tyres: spare tire, wheel chock, elevator adapted to the vehicle. Remonter: Capacity tank bitumit adapted to the tank capacity on the aggregate device operated by a single operator to drive the hydraulic system of the vehicle or drive their own Assembly remonter on a platform filled with logs secured with wood preservatives tank aggregate capacity of 6 m³, two-chamber equipped with a feed screw for the aggregate tank made of stainless steel insulated tank bitumen mixing pump with a capacity of 60 liters / min of the flow rate measuring system bitumen air compressor to clean the damaged surface of 3.5 m with air ducts and aggregate system control all operating functions using a joystick-mounted next to the driver's seat; mountable, central control panel used to set the main operating parameters of the burner control system with a thermostat to heat the emulsion Superstructure brand new year 2016 years arrow lights mounted on the back of remonter (left, right), warning lights

Works for complete or part construction and civil engineering work

Gmina Sosnowiec – miasto posiadające prawa powiatu | Published December 3, 2015
Winner
Przedsiębiorstwo Wielobranżowe BANIMEX Sp. z o.o.
cpvs
45200000

1. The contract is for reconstruction of the existing footbridge over the railway line in the area of. Oil in Sosnowiec. Phase I cited above. tasks include rebuilding the stairs No. 2 and No. 4 (disused pursuant to the provisions detailed report on the review of the bridge facility from 10.03.2015) together with the access to the facility from the street. Oil and necessary for this purpose robots: range transport, telecommunication network spacer, spacer street lighting, storm water drainage.

Works for complete or part construction and civil engineering work

Gmina Sosnowiec – miasto posiadające prawa powiatu | Published October 6, 2015  -  Deadline November 16, 2015
cpvs
45200000, 45231400, 45232210, 45100000, 45110000

1. The contract is for reconstruction of the existing footbridge over the railway line in the area of. Oil in Sosnowiec. Phase I cited above. tasks include rebuilding the stairs No. 2 and No. 4 (disused pursuant to the provisions detailed report on the review of the bridge facility from 10.03.2015) together with the access to the facility from the street. Oil and necessary for this purpose robots: range transport, telecommunication network spacer, spacer street lighting, storm water drainage.

Works for complete or part construction and civil engineering work

Gmina Sosnowiec – miasto posiadające prawa powiatu | Published June 16, 2015  -  Deadline July 27, 2015
cpvs
45200000, 45231400, 45232210, 45100000, 45110000

1. The contract is for reconstruction of the existing footbridge over the railway tracks in the area of. Oil in Sosnowiec. Phase I cited above. task includes reconstruction of the stairs No. 2 and No. 4 (disused pursuant to the provisions detailed report on the review of the bridge structure 03.10.2015 r.) with the arrival to the facility from the street. Oil and necessary for this purpose robots: range transport, telecommunication network spacer, spacer street lighting, storm water drainage.

Sosnowiec: Construction Renovation - Building project: Construction of the Centre for Psychotherapy and Addiction Treatment in Sosnowiec - Stage I - renovate the rooms of the first floor of the pavilion Street. 1 hospital for the purpose of temporary location center

Sosnowiecki Szpital Miejski Spółka z o.o. | Published August 25, 2016  -  Deadline August 24, 2016
Winner
SKAR-IO sp., ul. Chabrowa 21, 44-200 Rybnik, kraj/woj. śląskie.
cpvs
45000000

1. The contract works are construction and renovation The contract is for construction of the Centre for Psychotherapy and Addiction Treatment in Sosnowiec - Stage I - renovate the rooms of the first floor of the pavilion Street. 1 hospital for the purpose of temporary location of the Centre, which comprise 1.1 Construction 1.2 installations water and sewage, 1.3 Electrical installations and telecommunication. 2. The detailed scope of work covered by the contract shall establish: Technical Specifications Execution and Acceptance of Works and bills of quantities, annexed hereto. 3. Technical requirements and all the details of the execution of the works define the technical specifications of the Workmanship and the Receipt of Work ..

Construction work for school buildings

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Pana Arkadiusza Chęcińskiego | Published March 14, 2017  -  Deadline April 10, 2017
cpvs
45214200

The contract is for construction work involving the superstructure and reconstruction of a classroom building CKZiU Street. Grota Roweckiego 66 in Sosnowiec with reconstruction and expansion of internal installations: electricity, telecommunication, water, sanitary sewer, storm sewer, CO, gas, mechanical ventilation and air conditioning, lightning and the supply and installation of equipment rooms.

A detailed description of the order is attached as Appendix 3 hereto, together with the draft regulations attached as Appendix 3a to the Terms of Reference, the technical specifications of performance and acceptance of works constituting Appendix 3b to the ToR, and Przedmiarami works - constituting Appendix 3c to the Terms of Reference.

The Contracting Authority requires the employment of the Contractor or subcontractor under a contract of employment at least 10 construction workers (excluding persons performing managerial) positions including general construction works, such as: (plastering, bricklaying, formwork, concrete reinforcement, installation page.

Construction work for school buildings

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Pana Arkadiusza Chęcińskiego | Published March 18, 2017  -  Deadline April 14, 2017
cpvs
45214200

The contract is for construction work involving the superstructure and reconstruction of a classroom building CKZiU Street. Grota Roweckiego 66 in Sosnowiec with reconstruction and expansion of internal installations: electricity, telecommunication, water, sanitary sewer, storm sewer, CO, gas, mechanical ventilation and air conditioning, lightning and the supply and installation of equipment rooms.

A detailed description of the order is attached as Appendix 3 hereto, together with the draft regulations attached as Appendix 3a to the Terms of Reference, the technical specifications of performance and acceptance of works constituting Appendix 3b to the ToR, and Przedmiarami works - constituting Appendix 3c to the Terms of Reference.

The Contracting Authority requires the employment of the Contractor or subcontractor under a contract of employment at least 10 construction workers (excluding persons performing managerial) positions including general construction works, such as: (plastering, bricklaying, formwork, concrete reinforcement, installation page.

Sosnowiec: Construction Renovation - Building project: Construction of the Centre for Psychotherapy and Addiction Treatment in Sosnowiec - Stage I - renovate the rooms of the first floor of the pavilion Street. 1 hospital for the purpose of temporary location center

Sosnowiecki Szpital Miejski Spółka z o.o. | Published July 21, 2016  -  Deadline August 5, 2016
cpvs
45000000, 45430000, 45421000, 45410000, 45442100, 45332000, 45310000, 45311200

1. The contract works are construction and renovation The contract is for construction of the Centre for Psychotherapy and Addiction Treatment in Sosnowiec - Stage I - renovate the rooms of the first floor of the pavilion Street. 1 hospital for the purpose of temporary location of the Centre, which comprise 1.1 Construction 1.2 installations water and sewage, 1.3 Electrical installations and telecommunication. 2. The detailed scope of work covered by the contract shall establish: Technical Specifications Execution and Acceptance of Works and bills of quantities, annexed hereto. 3. Technical requirements and all the details of the execution of the works define the technical specifications of the Workmanship and the Receipt of Work. 4. The Contracting Authority at the request of the Contractors will arrange to collect Performers order to carry out the vision of the local (not later than 5 days prior to the date of the opening). Term vision will be posted on the website of the Employer in the information relating to the proceedings.

Construction work for school buildings

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Pana Arkadiusza Chęcińskiego | Published February 24, 2017  -  Deadline April 7, 2017
cpvs
45214200

Grota Roweckiego 66 in Sosnowiec with reconstruction and expansion of internal installations: electricity, telecommunication, water, sanitary sewer, storm sewer, CO, gas, mechanical ventilation and air conditioning, lightning and the supply and installation of equipment rooms.

A detailed description of the order is attached as Appendix 3 hereto, together with the draft regulations attached as Appendix 3a to the Terms of Reference, the technical specifications of performance and acceptance of works constituting Appendix 3b to the ToR, and Przedmiarami works - constituting Appendix 3c to the Terms of Reference.

The Contracting Authority requires the employment of the Contractor or subcontractor under a contract of employment at least 10 construction workers (excluding persons performing managerial) positions including general construction works, such as: (plastering, bricklaying, formwork, concrete reinforcement, installation page.

Grota Roweckiego 66 in Sosnowiec with reconstruction and expansion of internal installations: electricity, telecommunication, water, sanitary sewer, storm sewer, CO, gas, mechanical ventilation and air conditioning, lightning and the supply and installation of equipment rooms.

On the first floor of the segment will be two teams of teaching rooms: the first related to the hotel industry, the second to the catering sector.

The spaces available for the hospitality industry includes a reception with facilities, hotel room 5-star hotel with an independent bedroom and kitchenette, a vestibule and bathroom (all rooms adapted for the disabled), warehouses, sanitary facilities in the bathroom planning people with disabilities.

648,71m².

All rooms communicated with each other using routes.

171.10 m², execution of internal stairs and two lift shafts with the delivery and installation of two elevators;

Given that the project has been divided into two phases of work, and the second phase of work will not be soon implemented, all the work and works on a combination of stage I and II should be, so to finish the buildings and facilities constructed in the first stage may function independently and fulfill their utilitarian functions.

Site preparation and clearance work

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Pana Arkadiusza Chęcińskiego | Published April 1, 2016  -  Deadline April 25, 2016
cpvs
45111200, 45233120, 45233222, 45233220, 45232411, 45231400, 45232310, 45112710

1.Zamówienie covers the following works: 1.1. reconstruction of the road surface of mixtures SMA 0 / 12.5 5cm thick - approx. 3 750,00 m2, 1.2. reconstruction of bus bays - 2p., 1.3. the construction of a bicycle path - approx. 450,00 m, 1.4. reconstruction of sidewalks - approx. 2 450,00 m2, 1.5. reconstruction and construction of parking spaces for cars - approx. 51 pcs., 1.6. reconstruction of street inlets - approx. 18 pcs., 1.7. moving street lighting poles - 1 pc., 1.8. restoration of lawns - approx. 975 m2, 1.9. protection of electrical cables protective tubes - approx. 300 m, 1.10. protection of telecommunication cables protective tubes - approx. 95 m. Economic Reconstruction of the street in Sosnowiec is the separation of vehicular traffic, pedestrian and cycling within the street and to obtain additional surface parking.

The term of the contract: until 10.11.2016r. (end date).

Given in Section II.3) "Duration of the contract or time limit for implementation of the" start date is indicative. Binding for the Contractor is the end date.

Site preparation and clearance work

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Arkadiusza Chęcińskiego | Published June 4, 2016
Winner
Skanska S.A.
cpvs
45111200, 45233120, 45233222, 45233220, 45232411, 45231400, 45232310, 45112710

1.Zamówienie covers the following works: 1.1. reconstruction of the road surface with

mixtures SMA 0 / 12.5 5cm thick - approx. 3 750,00 m 2 1.2. reconstruction of bus bays - 2p., 1.3.

the construction of a bicycle path - approx. 450,00 m, 1.4. reconstruction of sidewalks - approx. 2 450,00 m2, 1.5. reconstruction

and the construction of parking spaces for cars - approx. 51 pcs., 1.6. reconstruction of street inlets

- Approx. 18 pcs., 1.7. moving street lighting poles - 1 pc., 1.8. restoration of lawns - approx. 975

m2, 1.9. protection of electrical cables protective tubes - approx. 300 m, 1.10. protection of cables

telecommunication protective tubes - approx. 95 m. Economic Reconstruction of the street in Sosnowiec is to

separation of vehicular traffic, pedestrian and cycling within the street and to obtain additional surface

parking.

The term of the contract: to 11/10/2016 (end date).

Given in Section II.3) "Duration of the contract or time limit for implementation of the" start date is a

indicative. Binding for the Contractor is the end date.

II.1.6).

Construction supervision services

Gmina Sosnowiec | Published January 20, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Przedsiębiorstwo Usługowo-Handlowe „Akbud” Krystyna Fabian</OFFICIALNAME></ORGANISATION><ADDRESS>ul. Roździeńskiego 188b</ADDRESS><TOWN>Katowice</TOWN><POSTAL_CODE>40-203</POSTAL_CODE><COUNTRY VALUE="PL"/><PHONE>+48 327829272</PHONE><FAX>+48 327829272</FAX></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
71520000

The contract is for the execution of construction supervision services for the job under the name called. "Expansion of the intersection: the Polish Army, the Constitution, Tuwima, Convenience in Sosnowiec". The service will be performed by the Contractor in the road specialty supervision and installation specialty in the network and thermal and gas. The scope of the surveillance project includes: - construction of roundabout junction medium 22 with an inner diameter of the outer me 37.0 m in the street of the Polish Army, at the crossroads of the Constitution, Tuwima and Convenience, 1 000,0 mb streets of the Constitution of the Polish Army, Shipbuilders, Tuwima, convenience of access roads to the extent necessary adjustments related to the geometry and grade line routes, 168.0 mb, single-track, two-way rail spacing of 1 435 mm with the reconstruction of tram and a tram stop - transfer chapel located at the intersection of comfort and Polish Army - reconstruction of the bus bay - the construction of street lighting on the number of points of light 40 kpl, 660.0 mb, - to the extent necessary network reconstruction colliding with the investment, ie. power networks, telecommunication, heating, water and gas. A detailed description of the works is presented in Appendix 6 to the ToR. Define the detailed scope of work n. documents: - detailed design, - technical specifications performance and acceptance of works, - bills of quantities. The scope of services includes the supervision of the following: 1) representing the Employer on the site through the exercise of control over the execution of tasks in the field of road, sanitary networks and devices including heat and gas, as well as coordinate the implementation of the whole task in accordance with the design documentation, the decision on whether to allow the implementation of the road investment, building permit, the rules and principles of technical knowledge; 2) check the quality of the works and the built-in construction products, in particular the prevention of the use of defective construction products and are not authorized for use in construction; 3) checking and commissioning works to be covered up or disappearing; 4) participating in the testing and technical acceptance, technical equipment and preparation and participation in the activities of final acceptance and transfer for use; 5) confirmation of actually performed works and removal of defects, and, at the request of the Employer, controlling settlement construction; 6) coordination of the work of the inspectors of the investor; 7) participation in surveys warranty;

Works for complete or part construction and civil engineering work

Gmina Sosnowiec – miasto posiadające prawa powiatu | Published January 16, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>P.P.U.H. „Libud” S.C. Liberda Adam, Liberda Jacek</OFFICIALNAME></ORGANISATION><ADDRESS>ul. Sucha 48A</ADDRESS><TOWN>Sosnowiec</TOWN><POSTAL_CODE>41-200</POSTAL_CODE><COUNTRY VALUE="PL"/></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
45200000

The task of co-financed by the European Union through the European Regional Development Fund under the Regional Operational Programme of Silesia in 2007-2013. Scope of the contract: 1.1. works: 1.1.1. road: - surfaces with mineral-in-wa bituminous wearing course - 4 692.20 m2 - surfaces with mineral-bituminous binder in-wa - 3 995,00 m2 - curbs - 992,00 m, - geotextile - 2 296.70 m2 - geogrid - 3 512.70 m2 - the base of aggregates - 2 625.70 m2 - the base of mineral-bituminous mixes - 3496.00 m2; 1.1.2. pavement - concrete rim - 1 113.00 m, - pavement paving concrete blocks - 1 296.60 m 2; 1.1.3. parking spaces: - curbs - 140.00 m, - surfaces of concrete blocks stones - 229,50 m2 - surfaces of mineral-in-wa bituminous wearing course - 89.00 m2; 1.1.4. island in the transition area - curbs - 32.00 m, - surfaces of concrete blocks stones - 28.00 m2; 1.1.5. entries: - curbs - 22,00 m, - cobble stone pavement - 26.00 m2; 1.1.6. infrastructure: 1.1.6.1. Warning signals Boom - arch - 1.00 p., - signal lanterns street lights and illuminated signs - 5.00 pcs .; 1.1.6.2. sewer: 1 000 mm - 9.00 p., 500 mm - 17.00 p., 315 mm - 101.00 m, 225 mm - 140.00 m, 280 mm - 89.00 m; 1.6.3. street lighting - lighting poles height: 9.0 m; 10.0 m - 13.00 p., - Installation of luminaires with a set of wires - 25.00 p., - Laying cables in the pipes - 565.00 m; 1.6.4. water: 110 mm - 300.00 m, 315 mm - 314.00 m; 1.6.5. collision protection: 350 mm - 450 mm 17.00 m - 21.00 m; 1.6.6. reconstruction of cable lines: - laying of cables - 121.00 m, 140 mm - 197.00 m; 1.6.7. reconstruction of telecommunication infrastructure (according to the documentation): 42.00 m, 753.00 m + 180.00 m, 362.00 m; 1.1.7. marking: - horizontal using thermoplastics - 320.00 m2 - vertical - road signs, posts signs - 33.00 p., - pylons - 2.00 pcs .; 1.1.8. green: - removing a layer of the earth - 700.00 m2 - humusowanie - 700.00 m2 - felling - 38.00 p., - plant trees - 64.00 p.,