Roadworks

Miasto Rybnik | Published July 14, 2015
Winner
Eurovia Polska S.A.
cpvs
45233140, 45230000, 45233120, 45233220, 45316000, 45231400, 45231000, 45231300

The contract is for reconstruction of the street 1 May - section of the Silesian street to street Krupiński. The material scope of the order: 1. Lot Road; 2. part of the sewerage system; 3. protection of the existing gas networks and water supply systems; 4. part of telecommunications; 5. part of the power; 6. reconstruction of geodetic control points; 7. inventory of the technical condition of real estate - 15 pcs.

Roadworks

Miasto Rybnik | Published April 29, 2015  -  Deadline May 18, 2015
cpvs
45233140, 45230000, 45233120, 45233220, 45316000, 45231400, 45231000, 45231300

The contract is for reconstruction of the street 1 May - section of the Silesian street to street Krupiński. The material scope of the order: 1. Lot Road, 2nd part of the sewage, 3. protection of the existing gas networks and water supply systems, telecommunications Part 4, 5. part of the electric power, 6. reconstruction of geodetic control points, 7. inventory of the technical condition of real estate - 15 pcs .

Roadworks

Miasto Rybnik | Published October 2, 2015
Winner
SKANSKA S.A.
cpvs
45233140, 45111000, 45233290, 45233221, 45232000

The material scope of the order: includes reconstruction of the street. Rudzka Phase VI - Class G 1.3 km stretch between the intersection of ul. Pniowską to the intersection of ul. Steel in Rybnik. Part of the road includes the demolition of the existing surface and substructure of the road with sidewalks, execution ground stabilization with cement foundation of broken aggregate, the foundation of mineral-bituminous binder layer of asphalt concrete, surfaces with a mixture of SMA development curbs and edges of concrete, execution of sidewalks, downhill and the bike path, performed by marking horizontal and vertical. In addition, the project includes the construction of storm water drainage, street lighting, security, and reconstruction of the existing infrastructure and underground networks in the field of telecommunication and energy.

Roadworks

Miasto Rybnik | Published July 8, 2015  -  Deadline July 27, 2015
cpvs
45233140, 45111000, 45233290, 45233221, 45232000

The material scope of the order: includes the reconstruction of the street. Rudzka Phase VI - Class G on 1.3 km stretch between the intersection of ul. Pniowską to the intersection of ul. Steel in Rybnik. Part of the road includes demolition of the existing surface and substructure of the road with sidewalks, execution of ground stabilization with cement, crushed aggregate base course, the foundation of mineral-bituminous binder layer of asphalt concrete, pavement with SMA mix, building curbs and concrete edges, and execution of sidewalks, descents and bike path, and execution of horizontal and vertical markings. In addition, the project includes the construction of storm water drainage, street lighting, security and reconstruction of the existing infrastructure above and underground networks in the field of telecommunication and energy.

Various surface works

Miasto Rybnik | Published March 24, 2016
Winner
Auto-Trans Asfalty Sp. z o.o.
cpvs
45233200, 45111000, 45233290, 45233221

The contract is for reconstruction of the street Rudzka section from Stalowa Street to the city limits of Rybnik.

Scope of the object of the contract:

- Carriageways of the surface out of SMA - 23 607 m² (quiet surface of the gum)

- Sidewalks, driveways, pieszorowerowy string of ankle 8 cm - 2,416 m²,

- Pavements with concrete tiles type STOP - 87 m²,

- Bus bays of granite 15x17 - 343 m²,

- Concrete curbs 20x30 - 848 mb,

- Curbs stone 20x30 - 436 mb,

- The periphery of concrete 8x30 - 1385 mb.

- Signs of type A, B, C, D - 36 pcs.

- Markings Thick - 747 m²,

- Execution of culverts 500 and 1000 to 1033 pcs.

- Execution of passages for animals of size. ext. 1.2 x 1.2 m - 7 pcs.

- Reconstruction of telecommunication network.

Inventory of the technical condition of the property located at:

- Ul. Rudzka No. 469, 465, 463, 461, 459, 455, 451, 456,

- Ul. Polan 1, 3, 5,

- Zwonowicka 1.

Various surface works

Miasto Rybnik | Published November 7, 2015  -  Deadline December 15, 2015
cpvs
45233200, 45111000, 45233290, 45233221

The contract involves the reconstruction of the street Rudzka on the section from Stalowa Street to the city limits Rybnik. The material scope of the order: - carriageways surfaced with SMA mixtures - 23,607 m2 (quiet surface of the gum) - sidewalks, driveways, pieszorowerowy string of ankle 8 cm - 2416 m2 - pavements with concrete tiles: STOP - 87 m2 - bay Bus with granite 15x17 - 343 m2 - curbs, concrete 20x30 - 848 mb - curbs stone 20x30 - 436 mb - the periphery Concrete 8x30 - 1385 m - the road signs type A, B, C, D - 36 pcs. - markings Thick - 747 m2 - making culverts fi 500 and fi 1000-1033 pcs. - execution of passages for animals of size. ext. 1.2 X1,2 m - 7 pcs. - Telecommunication network inventory rebuilding the technical condition of properties located at: - ul. Rudzka No. 469, 465, 463, 461, 459, 455, 451, 456, - ​​ul. Polans 1, 3, 5, - Zwonowicka 1.

Surface work for roads

Miasto Rybnik | Published March 31, 2017  -  Deadline May 9, 2017
cpvs
45233220, 45233142, 45233290, 45233221

The contract is for reconstruction of the street Rudzka section at km 5 + 303 - 6 + 850 (Stage IV).

The material scope of the order:

- of carriageways surface out of SMA (surface containing rubber silent) - 13200 m²

- walkway bike path pulp min-bit. - 647 m²

- walkways, exits bets ankle 8 cm - 578 m²

- pavements with concrete tiles type STOP - 44 m²

- bus bays of granite 15x17 - 228 m²

- concrete curbs 20x30 - 3502 mb

- curb stone 20x30 - 260 m

- concrete rim 8x30 - 1790 mb

- road signs type A, B, C, D - 43 pcs.

- Thick markings - 1208 m²

- drainage system 110 - 400 mm (from well to well D211 D232) - 1776 m

- street lighting (lamp of SO4 / 241 lamp SO4 / 127) - 68 units. Column

- reconstruction of telecommunication networks and broadband

Rudzka No. 251, 224, Laguna restaurant.

Selected general requirements concerning the subject of the contract Employer

The Contracting Authority requires the use of materials approved for marketing and widespread use in construction.

Markings should be made, as a thick film.

Sidewalks should be performed entirely from gray concrete blocks.

Entrances to the property to perform entirely of red concrete blocks.

The tape should be applied to the edge and cast iron components.

Purchaser informs that does not allow the use of other material replacement.

Regulation of iron manhole manholes and drains street inlets should be performed using a freeze proof, fast-setting, not shrinking cement-based mortar modified with plastic.

Reclaimed from the milling is owned by the Purchaser.

To the mineral-bituminous mixtures Purchaser does not allow the use of asphalt granulate from asphalt cutter.

Employer does not allow the use of recycled materials (korytowania and demolition) and recycling.

Due to the performance of the bike path and sidewalk from the mass of mineral-bituminous in the wake of pressure steel pipeline of 800 mm in Poland owned by EDF SA, all earthworks associated with soil compaction or performing construction, etc.. Should be done with special care and eliminating vibration technology.

Employer informs that during the works should enable the Enterprise Water Supply and Sewerage laying the discharge pipe in protective pipe in the place indicated on the attached site plan.

Prior to the works, and on completion of the Contractor's duty it is to draw up an inventory of the technical condition of buildings.

22.00 - 06.00.

Employer requires that during the winter season from 15 December to 15 March contractor must provide full passable road.

Works are to be carried out to ensure passage and coming to residential, commercial, production and other institutions.

The obligation to the Contractor in the course of the proceedings it will be necessary to draw up schedule of works - Financial and present it for approval to the Purchaser at the latest on the building site.

Existing railings U-11b must be dismantled and re-build in the place indicated by the Purchaser.

Here barriers and obstacles N2W3 U-11b must be made dismountable.

The warranty period is extended powers under the warranty for defects.

The detailed scope of work and the requirements of the Terms of Reference specifies, construction design, technical specification and performance of the receipt of work, bills of quantities.