Katowice: ROPS.PSO.3321.13.2016 - Implementation and emission cycle of TV reports devoted to adoptions under their Regional Social Policy Centre Region Silesia project coordination and development of adoption services

Regionalny Ośrodek Polityki Społecznej Województwa Śląskiego | Published July 26, 2016  -  Deadline January 31, 2017
The contract is for the implementation and triple emission series of three TV reports devoted to adoptions of children, with particular emphasis on adoption of older children. Its objective is to familiarize the audience the problems of children deprived of parental care and living in residential institutions and the capacity to find potential adoptive families ready to adopt older children. The cycle will be completed within the project under the name of co-ordination and development of adoption services co-financed by the European Union under the European Social Fund detailed order found in the Terms of Reference.

Electricity

Górnośląskie Towarzystwo Lotnicze S.A. | Published January 3, 2017  -  Deadline February 10, 2017

The contract is for the sale of electricity to the facilities of the Upper Silesian Aviation Group located in Pyrzowice, ul. Freedom 90.

Specification of the objects for which the Employer requires electricity:

- Transformer station ST 8A - hangar 1 and 2, KOL (complex of workshop, warehouse and social services operating airports), the center radar center radio runway, fuel storage, closer to the radio navigational facilities facilities catering, aprons planes, plate de-icing of aircraft, construction of power facilities, hangars, maintenance of aircraft, base CARGO;

- Transformer station ST 6A - passenger terminals A and B, and C (przylotowy) terminals CARGO, multi-purpose building, control tower, boiler, sewage treatment plants, sewage pumping stations, hydrophore, parking, driveway, technological routes and aircraft aprons.

Estimated energy consumption concerned, ie. From 01.03.2017 r. To 31.12.2017 r.

- ST ST 6A and 8A:

WI - 2 432 665 kWh

In the second - 1 532 698 kWh

In the third - 9 261 825 kWh

Total: 13 227 188 kWh

Tariff Group: B23.

The above mentioned values ​​are estimates and the Employer does not declare that it will recover this amount in full. The above amounts are estimates only and therefore can not be the basis for any property claims, including compensation.

Contractual capacity:

- RSO MEASUREMENT PI - 2 000 kW,

- RSO MEASUREMENT PII - 2 000 kW.

Construction work for swimming pool

Miasto Katowice | Published January 19, 2017  -  Deadline January 24, 2017

Construction of buildings 3 pools with land development, roads, car parks, networks, connections and ratio of elements / objects underground infrastructure.

The range for each position and in particular:

1) demolition of existing elements colliding with an investment;

2) the construction of buildings pools is specified in the Terms of Reference;

3) performance. connection pools to transport telecommunication network to the nearest point indicated below, together with obtaining all permits and approvals as well as the development of the required documentation if necessary:

a) Part I- (Szopienice- Burowiec) connection to ZSH Street. Haller 60;

b) Part II (Brynów) lease drains toward al. The Upper Silesia, the transition to the municipal sewage system and the position of the fiber to the building of UM;

c) Part III (Ligota Zadole) - connection point located in the Park Zadole the amphitheater.

4) Each of the designed object is a building storey, basement, detached.

  • 1