Call +44 800 9755 164

Public tenders for radio, tv, telecommunications in Gdynia...

Find all Broadcasting tenders in the world.
Finding business opportunities has never been easier.

Results for broadcasting. Make a new search!

Promotional services

Gdyńskie Centrum Sportu | Published November 2, 2016

The promotion of Gdynia and Gdynia Sports Centre budgetary unit and its activities during the edition of the international cycle event hydro-jet "FlyCup" in the period 16-17 July 2016 in Gdynia. The promotion of Gdynia involving, among others: the granting of the City of Gdynia title Strategic Partner Events and placing the name "Gdynia" in the official name of Events "Gdynia FlyCup"; posting of Gdynia logo on T-shirts for the players, which will be presented during the Event; posting the spot advertiser event at Radio Eska with an indication of Gdynia as the host of events like. The promotion of the Gdynia Sports Centre budgetary unit and its activities involving, among others: the promotion of cycle racing PKO Grand Prix Gdynia and MTB C. Hartwig Gdynia Marathon organized by GCS on the Welcome page contractor during the contract period; allowing the Employer recording events for their own use, etc.

Road transport services

Pomorski Park Naukowo – Technologiczny Gdynia | Published November 19, 2016  -  Deadline December 28, 2016

1.Przedmiotem contract is the service of transportation, assembly and dismantling of exhibition stands along with providing technical support during the three international trade fairs.

The Contractor may submit an offer for all or some of their part of the contract:

Part 1 covers the services of transport, assembly and dismantling of the exhibition stand along with providing Serv. techn. during the exhibition Bett Show in London in the period from 25 to 01/28/2017.

Part 2 covers the services of transportation, assembly and dismantling of the exhibition stand along with providing Serv. techn. during the exhibition Mobile World Congress in Barcelona in the period from 27.2. to 03.02.2017.

Part 3 covers the services of transport, assembly and dismantling of the exhibition stand along with providing Serv. techn. during the exhibition CeBIT in Hanover from 20 to 03/24/2017.

Detailed description of the contract and the obligations of the Contractor is contained in the Terms of Reference and est. In particular in the Annex. 7 and 8.

The Contractor is obliged to:

The transfer of equipment Contractor will be held on weekdays, ie. From Monday to Friday from 8:00 until 16:00.

b.Zapewnić appropriate to the transported equipment packaging and carry the following equipment:

0,5 m

0.15 m

0.15 m

1.0 m

-10 TVs 42 "or alternatively electronic devices with dimensions not exceeding 10 TV 42"

-panele Floor: 50 pieces with dimensions of 1.0 mx 1.0 m, mdf laid the panels and baseboards at the floor and skirting boards

-kable internet and extenders - 10 pieces

-2 Suitcases with stands and display advertising in the housing dimensions housing dimensions: 1854 cm x 2250 cm x 428 cm

-2 Cabinet with dimensions of 0.9 mx 0.3 mx 0.8 m

-4 Tops wood with dimensions of 1.2 mx 0.3 mx 1.4 m

-8 Hokerów seats with dimensions 0.5 x 0.5 x 1 m

-8 Stools stumps with dimensions of 0.5 mx 0.5 mx 1.0 m

-Ściana Consisting of a mobile element, juxtaposed with one another in width (of the wall 3 with a width of 99 cm, a width of 4 wall 191 cm 2 the walls of a width of 150 cm) and a height of 300 cm

-Oświetlenie Halogen, consisting of a maximum of 10 points diodes.

c.Zmontować of przewiezionego equipment exhibition stand measuring 50 m2 open on four sides and connect required utilities (electricity, lighting, internet) and all the utensils, and set, as agreed with the representatives of the Employer, furniture and other equipment.

18.00.

18:00 on 24 January 2017r.

f.Oddawane the Employer booth must be ready for use, ie. clean, with connections to the electricity network and the Internet, and lighting (cables laid under the floor).

Since the time taken for maintenance tasks is the criterion for evaluation of bids, the Contractor is obliged to ensure the commencement of work by people dedicated to maintenance at the time indicated in the offer, but no longer than 2 hours of notification.

15:00.

22:00 and on 29.01.2017.

Reception will be able to take place during working hours of ordering ie. From Monday to Friday from 8:00 until 16:00.

k.Szczegółowy description in the tender documents.

The Contractor is obliged to:

The transfer of equipment Contractor will be held on weekdays, ie. From Monday to Friday from 8:00 until 16:00.

b.Zapewnić appropriate to the transported equipment packaging and carry the following equipment:

0,5 m

0.15 m

0.15 m

1.0 m

-10 TVs 42 "or alternatively electronic devices with dimensions not exceeding 10 TV 42"

-panele Floor: 50 pieces with dimensions of 1.0 mx 1.0 m, mdf laid the panels and baseboards at the floor and skirting boards

-kable internet and extenders - 10 pieces

-2 Suitcases racks advertising

Screen-housing dimensions housing dimensions: 1854 cm x 2250 cm x 428 cm

-2 Cabinet with dimensions of 0.9 mx 0.3 mx 0.8 m

-4 Tops wood with dimensions of 1.2 mx 0.3 mx 1.4 m

-8 Hokerów seats with dimensions 0.5 x 0.5 x 1 m

-8 Stools stumps with dimensions of 0.5 mx 0.5 mx 1.0 m

-Ściana Consisting of a mobile element, juxtaposed with one another in width (of the wall 3 with a width of 99 cm, a width of 4 wall 191 cm 2 the walls of a width of 150 cm) and a height of 300 cm.

-Oświetlenie Halogen, consisting of a maximum of 10 points diodes

c.Zmontować of przewiezionego equipment exhibition stand with an area of ​​45 m², open on two sides and connect required utilities (electricity, lighting, internet) and all the utensils, and set, as agreed with the representatives of the Employer, furniture and other equipment

18:00

18:00 on the date 26.02.2017.

f.Oddawane the Employer booth must be ready for use, ie. clean, with connections to the electricity network and the Internet, and lighting (wiring laid the

Gdynia: Delivery audioguide system for Emigration Museum in Gdynia

Muzeum Emigracji w Gdyni | Published July 22, 2016  -  Deadline December 15, 2016
The contract is for the supply, installation, commissioning system audioguide (listening devices, chargers, RF tags and infrared software for Content Management) with the creation and flashing soundtracks, prepared by the Contractor on the basis of materials supplied by the Employer and the training of 5 employees and to provide warranty service, called later in the System. The contract covers: 1) Delivery of equipment: a) audioguide - a device listening with battery and speaker - 40 pieces, b) transmitting device to operate the tours organized by the guide - compatible with devices of listening - 3 pieces, c) charger and programmer for uploading content for 10 pcs. devices listening - 1 piece, d) Headphones single binaural - 1000, e) Monaural headphones reusable - 100 pieces, f) Tags radio objects (markers RF) - 20 pieces, g) RFID tags - 100 pieces h) programmer RFID tags - 1 piece, i) Anti-theft - device to device control listening (controller inductive loop) - 1 piece, j) strap (lanyard) to wear the devices listening and broadcasting - 100 pieces, 2) Creation and upload soundtracks audio tours in the basic version and expanded in the Polish language, with translation into English and Spanish, 3) Installation of markers, 4) training of employees Employer of operating system, 5) Execution once the review system. 6) Technical support in the operation and use of the system. A detailed description of the contract is in Appendix 1 hereto. As part of the contract, the contractor is obliged to: 2.1. delivery of new equipment, without flaws, 2.2. installation, commissioning, verification and adaptation of content, 2.3. to consult with the Employer during the recording, 2.4. deliver to the Purchaser correction files from audio materials before installing the devices. 2.5. provide the contracting authority with a minimum of 24 months under the terms of the agreement Appendix 7 hereto. 2.6. Moreover, the Contractor is obliged within 6 months from receipt of the order to provide technical support in the operation and use of the system covering the current make adjustments, changes in the script, recording overs, upload to the device, Polish, English, Spanish length of recording up to 20 min., 3. audioguide system should operate automatically depending on the place, where the visitors. 4. The place of delivery, installation and training office is the Employer. The costs of making local vision borne by the Contractor.

Gdynia: Development of multi-branch project documentation, technical specifications of the workmanship and the receipt of work for the task: Reconstruction of the building No. 26, located in the Hospital of the Marine street the January Uprising 1

Szpitale Wojewódzkie w Gdyni Sp. z o.o. | Published July 22, 2016  -  Deadline December 15, 2016
1. Development of multi-branch project documentation, technical specifications of the workmanship and the receipt of work for the task: Reconstruction of the building No. 26, located in the Hospital of the Marine street the January Uprising 1, including the acquisition of appropriate formal and legal documents in the design process and procedure of the building permit, execution of implementation and the author's supervision at the stage of execution of works. The scope of the contract: Object of the contract include: 1) the execution of a complete multi-branch design documentation (construction and executive), together with all required arrangements necessary to obtain a permit for the reconstruction of the following: a) architectural and construction, b) draft regulations, c) the project design together with an assessment of the technical condition of the building under reconstruction, d) the design of medical technology, e) the design of interior design with the colors and designs executive furniture (zabudowywanych fixed and mobile), f) the design of sanitary installations and ventilation g) the design of electrical installations and telecommunication, h) information on the safety and health protection. 2) Implementation of multi-branch updating inventory building to the extent necessary for the preparation of project documentation. 18.05.2004 r. On the methods and bases for preparation of the investment cost estimate, calculating planned costs of design works and planned costs of works specified in the functional and operational program in a detailed version of the bill of quantities and taking into account the phasing. 4) Development of technical specifications for execution and acceptance of works in electronic form. 5) Obtaining a building permit. 6) The exercise of the author's supervision. 7) The scope of the project includes obtaining all arrangements for a range of investments and in particular: a) the protection of fire protection. for the whole building, b) to meet the requirements of sanitary-epidemiological the scope of the project. A detailed description of the object of the contract: All materials and construction products must have certificates allowing for use, certificates of compliance with Polish standards and hygienic certificates. 2.1 Part of the architectural The building is currently 26 branches are located in: - Level -1 - Diagnostics -Work. mammography, CT, pom. technical (level excluded from the design) - Ground floor - Department of Radiation Therapy - 36 beds - Second Floor - Department of Radiation Therapy - 36 beds - Second Floor - Hospital Chemotherapy Unit (patients fixed line) - 34 beds. Of 2100 m2. 2.2 The Employer shall determine the new location of the different branches of the design of: - Ground floor - entrance from the chapel (from the south) - a minimum of 20 posts for chemotherapy patients daily (patients coming). - Ground floor - the rest of the ground floor (from the North) must be designed for the needs of the Department of Chemotherapy fixed (hospital). 300m2 from the north), the Division of Chemotherapy fixed (hospital) should be designed also for the needs of the Chemotherapy Department fixed the total number of beds ground floor and I p. -34. - First floor - the remaining part I p.9 (from the south) should be designed for the Department of Radiotherapy - second floor - a whole must be designed for the Department of Radiotherapy, Part I, p. And the entire second floor. Must be designed for 52 beds stationary.
  • 1