Call +44 800 9755 164

Public tenders for radio, tv, telecommunications in Paris...

Find all Broadcasting tenders in the world.
Finding business opportunities has never been easier.

Results for broadcasting. Make a new search!

Construction-related services

Radio France | Published February 10, 2017  -  Deadline March 14, 2017
cpvs
71500000, 71520000

This service contract is for a scheduling assignment, steering and coordination of studies and work under renovation Studios Vehicles conducted by Radio France. The contract will take effect from the date of its notification and will end after the completion guarantee period. The expected duration of the renovation of the studio means is assessed at 66 months.

The tasks include:

- The organization and the general and detailed coordination of all stakeholders responsible for the operation with external parties are competing,

- Scheduling and planning of execution studies including synthesis studies,

- Scheduling and planning work including fixtures and radio technical equipment in the trays and cabins,

- Scheduling and planning of OPR, monitoring levees reserves and production of the DOE,

- Management and monitoring the progress of studies, work, mutual funds, levees reserves and production of the DOE,

- The forecast tracking and pointing the production of construction documents,

- The planned monitoring and tallying process of notification of additional work service orders,

Health and safety consultancy services

Radio France | Published February 10, 2017  -  Deadline March 14, 2017
cpvs
71317210

This contract relates to a safety coordination mission and health protection under renovation Studios Vehicles conducted by Radio France. The contract will take effect from the date of its notification and will end after the completion guarantee period. The expected duration of the renovation of the studio means is assessed at 66 months.

The scope of the coordinator is part of the list of technical areas listed below, as well as furniture and equipment and concerns including, but not limited to:

- Equipment:

• the viability of the equipment works;

• the foundation structures of the equipment;

• the equipment construction bodies;

• enclosed structures and condition of equipment;

• elements of the equipment or not inextricably linked to the works listed above;

- The stage equipment suspended or not:

• All temporary structures related to work;

• all existing structures adjacent to the equipment subject of the construction operation;

• existing structures remaining on the plot demolished whether expected or not;

• furniture installation and equipment of any kind.

Railway engineering services

SNCF Réseau | Published February 3, 2017
cpvs
71311230

These are defined benefit SNCF GF repository 01110 "qualification and monitoring of enterprises and engineering consultants in the field of infrastructure works" available on the website www.sncf.com, in the following areas :

- Traffic studies

- Implementation of telecommunications studies

- Fixed installations studies of electric traction.

Architectural, construction, engineering and inspection services

Radio France | Published February 10, 2017  -  Deadline March 21, 2017
cpvs
71000000, 71200000

The expected duration of the operation is estimated at 66 months. 

Under the flat part, the contractor will be entrusted with the following missions:

- In the draft Education:

Establishment descriptive notes and architectural graphics parts,

Participation in the drafting of functional and technical notes, technical graphics parts, price decomposition frames and estimates prepared by the owner of lot 6

- During the project studies / DCE:

Establishment descriptive notes and architectural graphics parts,

Participation in the writing of functional and technical notes, technical graphics parts, notebooks specific technical specifications, price decomposition frames and estimates prepared by the owner of lot 6

- During the phase of assistance to the award of works contracts:

Participation in the analysis of applications and tenders made by the owner of lot 6,

Subsequent markets will focus on control missions work and further study missions.

Subsequent contracts may firm and optional slices slices.

The mission of project management will focus on the APS mission elements, APD, PRO, DCE, ACT, DET, VISA and AOR.

The detailed description of the missions in the notice inviting applications, joined the bidding documents for applications.

  • 1