Kuressaare Hay AJ F6 and F8 AJ Long Street reconstruction of the joint work with the TV IS1205, IS1070
Elektrilevi OÜ - Kadri Leopard | Published December 17, 2014
Build the following two work project - Eesti Energia Network Building IS1205 and IS1070 AS Eesti Energia AS Construction Network. Building Permits: IS1205: 7697 - 08.18.2014 / EHR 220,709,836; IS1070: 7133 - 02.21.2014 / EHR 220,692,200 volumes of work tables Notes: IS1205 - are taken into account include the dismantling õhukaabli dem. IS1070 - are taken into account include the dismantling õhukaabli dem. Fuses and exchange of Long Street AJ Buildings connection cables installed 4x25mm2 631m cable. NOTE: USE-mounted TV CABLE BASED ÜHISKAEVISES ground cable trenches PLANTING AND RESTORING not part of the scope of works and do not reflect volume table. According to the Special Agreement cable TV installed by the contractor in this regard will be founded, and to be reconstituted into the trench. The dismantling of the bare wire goes to 1323m and 45 pole overhead. Additional Terms result Electrical Distribution Ltd. and the town of Kuressaare city cooperation agreement and the ELV TV network construction paralleeltöövõtul - Paralleeltöövõtu must be performed only by ELV maakaabelliinide proper installation (including the protection of pipes, warning tapes JMV), the trench bases and restores the city builder TV. - Paralleeltöövõtu exercise does not prevent to some extent, the city of TV work early exercise. - Not later than 21 days after the builder of the town of Kuressaare TV contract is concluded (at the end of August or beginning of September) shall be forwarded to a detailed timetable for when it is possible to carry out Paralleeltöövõtt. - Paralleeltöövõtt completed not later than the end of 2014. - Paralleeltöövõtu part of the city has an obligation to guide the builder TV schedules that take into account and to carry out the work in the trenches Paralleeltöövõtu other persons. - Paralleeltöövõtu there is an obligation to immediately inform of any circumstances which may affect the work carried out by others. - Not later than 7 days before the city builder TV Paralleeltöövõtu ore began must be submitted to the Engineer for the city coordinating Paralleeltöövõttu TV builder agreed timetable of works and the underlying (s) the building (s). - Paralleeltöövõtu maakaabelliinid must be installed in a manner that allows the cables to be installed next to other cables, thereby making the work does not harm others previously performed work or trench constructed embankment and the like. - Paralleeltöövõtu there is an obligation to participate in the working meetings of the Coordinating Paralleeltöövõttu engineers have been notified at least two working days before the meeting. * Paralleeltöövõtt - Lighting of work by the contractor is being established within the framework of the TV Cable trenches and installation of cables and other related works. Measures for the safe operation of electrical equipment and their protection zone to determine tööjuhatuse meeting before the commencement of the work.