Call +44 800 9755 164

Public tenders for radio, tv, telecommunications in...

Find all Broadcasting tenders in the world.
Finding business opportunities has never been easier.

Results for broadcasting. Make a new search!

Construction-site supervision services

Landeshauptstadt Stuttgart, Tiefbauamt | Published November 23, 2016  -  Deadline December 22, 2016
742 m produced in mining techniques. 

150 m on the Ausfahrportal from 2 to 3 lanes.

For operational and safety equipment are two operating building.

The Rosenstein Tunnel provides thereby a direct connection between the Leuze Tunnel and node Pragsattel.

Site supervision for the operational and safety equipment in accordance with § 55 HOAI LP 8.

The following performance areas are to serve in the architectural supervision:

Power supply;

Medium-voltage switchgear;

transformers;

Low-voltage distribution;

UPS;

Lighting;

Adaptation lighting;

Tunnel lighting;

Active guide;

Measurement, and control technology;

Control and automation systems;

Connection to superordinate monitoring center;

Data acquisition;

Operating software;

Safety equipment;

Fire alarm system;

Emergency cabins;

Orientation- and escape lighting;

Video system;

Public address system;

Wireless Analog, Digital, BOS, Radio;

Tunnel ventilation with central suction;

axial fans;

Jet fans;

Rauchabsaugklappen;

Fire tests;

Fire water supply and fire fighting equipment;

Operating room equipment;

Ventilation;

Sanitary;

Double bottom;

Lightning protection;

Telephone and burglar alarm system;

Factory acceptance tests.

  • 1