Public tenders for radio, tv, telecommunications in Braunschweig Germany

Find all Broadcasting tenders in the world.
Finding business opportunities has never been easier.

Results for broadcasting. Make a new search!

Instruments for measuring electrical quantities

Technische Universität Braunschweig, Abteilung 22 Wirtschaftsangelegenheiten, Beschaffung, Einkauf | Published August 26, 2016
Winner
CalPlus GmbH NL Scopeshop
cpvs

Lieferung eines Messplatz für ultra-breitbandiges Software-Defined Radio.

Postal and telecommunications services

Stadt Braunschweig | Published November 19, 2015
Winner
Kommunale Wirtschafts- und Leistungsgesellschaft KWL
cpvs
64000000

The City of Braunschweig awarded for a total of 467 locations within the city of Braunschweig telecommunications services in the fixed network incl. Wired broadband deployment.

Postal and telecommunications services

Stadt Braunschweig | Published August 8, 2015  -  Deadline September 28, 2015
cpvs
64000000

The City of Braunschweig awarded for a total of 467 locations within the city of Braunschweig, the telecommunications services in the fixed network incl. Wired broadband deployment.

Radio-isotopes

Physikalisch-Technische Bundesanstalt | Published May 12, 2016
cpvs
09344000

radioisotopes

Installation of telecommunications equipment

Städtisches Klinikum Braunschweig gGmbH | Published January 27, 2016
Winner
Siemens AG Siemens Deutschland Building Technologies
cpvs
45314000

At the site Salzdahlumer road following measures will be implemented:

Construction of a ward block for general-care, care of the Children's Hospital and the pediatric surgery, for intensive care and intermediate care construction of Children's Hospital;

Laying of Anesthesiology;

Creating an abdominal center (Med. Clinic I with endoscopy and general surgery);

Creating a heart center (. HTG Clinic and the Medical Clinic II);

Laying the Eye Clinic and Ear, Nose and Throat Clinic as a basis for the head center;

Laying the accident and plastic surgery;

Reconstruction of dialysis and the Medical Clinic V.

Creation of a new main entrance (address form);

Extension of the emergency room;

Expansion of engagement center and creating a night monitoring;

Renovation and expansion of the Central Surgical Department;

Expansion of laboratories, canteen extension;

approximately 52 000 m² of gross floor area.

Installation of telecommunications equipment

Städtisches Klinikum Braunschweig gGmbH | Published September 5, 2015  -  Deadline October 13, 2015
cpvs
45314000

The second section includes implementation measures at the site Salzdahlumer and Celler Straße. In planning a division of the second portion is carried out in the realization of portions 2A and 2B. The main focus carried out renovation and new construction at the site Salzdahlumer road. In section 2B of the renovation and expansion at the site Celler Straße and the conversions in the inventory at the site Salzdahlumer road done. 2. Realization section construction phase 2A. At the site Salzdahlumer road following measures are implemented: - Construction of a ward block for General Care, Care of the Children's Hospital and the pediatric surgery, for intensive care and intermediate care; - Construction of the Children's Hospital; - Laying of Anesthesiology; - Creation of an abdominal center (Med. Clinic I with endoscopy and general surgery); - Creation of a cardiology center (. HTG Clinic and the Medical Clinic II); - Laying the Eye Clinic and Ear, Nose and Throat Clinic as a basis for the head center; - Laying the accident and plastic surgery; . - Reconstruction of dialysis and the Medical Clinic V; - Creation of a new main entrance (address form); - Extension of the emergency room; - The intervention center and creating a night monitoring; - Renovation and expansion of the Central Surgical Department; - Expansion of the laboratory; - Extension of the canteen. At the site Celler road will be expanded to a childbirth delivery room. For this purpose, the necessary construction cost groups 200-500 DIN are to forgive 276th Overall, the construction comprises approximately 52 000 m² of gross floor area. See also point II.2.1).

Electrical fitting work

Staatl. Baumanagement Braunschweig | Published October 4, 2016
Winner
TU BS – Elektro- und Fernmeldeinstallationsarbeiten
cpvs
45311200

Electrical and telecommunications installation work.

Electrical fitting work

Staatliches Baumanagement Braunschweig | Published May 25, 2016  -  Deadline June 21, 2016
cpvs
45311200, 45314000

Electrical and telecommunications installation work.

Building installation work

Nibelungen Wohnbau GmbH Braunschweig | Published January 17, 2017  -  Deadline February 13, 2017
cpvs
45300000, 45331000, 45330000, 45310000, 45314000, 45313100

Technical equipment of the building with the trades heating, ventilation, sanitation, power, telecommunications, conveyors.

Repair, maintenance and associated services related to personal computers, office equipment, telecommunications and audio-visual equipment

NOW IT GmbH | Published November 18, 2016
cpvs
50300000

It is the implementation of various services to PC, notebook and monitor such as installation, dismantling, removal, thorough cleaning and disposal.

With this call a contractor to be found,

over which the German Pension Insurance - North East West Center for Information Technology (IT NOW GmbH) during the contract period to provide different services to support the on-site service (VOS) can retrieve.

It involves implementation of various services to PC, notebook and monitor such as installation, dismantling, removal, thorough cleaning and disposal.

Repair, maintenance and associated services related to personal computers, office equipment, telecommunications and audio-visual equipment

NOW IT GmbH | Published September 6, 2016  -  Deadline October 11, 2016
cpvs

With this call a contractor to be found,

Repair, maintenance and associated services related to personal computers, office equipment, telecommunications and audio-visual equipment

NOW IT GmbH | Published October 26, 2016  -  Deadline November 29, 2016
cpvs
50300000

With this call a contractor to be found,

Optical telecommunication cables

Physikalisch-Technische Bundesanstalt (PTB) | Published October 29, 2015
cpvs
32562200

Glasfaserkabel für die Fernübertragung

Optical telecommunication cables

Physikalisch-Technische Bundesanstalt (PTB) | Published August 22, 2015  -  Deadline September 30, 2015
cpvs
32562200

Provision of fiber optic fiber links (singlemode, lambda = 1.5 microns) for research purposes of PTB for Streckev PTB Braunschweig computing center for the Leibniz University, Hannover; the Karlsruhe Institute of Technology (KIT), Karlsruhe (branch to Strasbourg and Garching), for the route KIT, Karlsruhe to Kehl and the distance KIT, Karlsruhe Rechenzentrum Garching about BelWü data center at the University of Stuttgart, Stuttgart.

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published March 22, 2017  -  Deadline April 24, 2017
cpvs
45311200, 45311100, 45312310, 45317000

39 housing units, with several commercial areas, doctor's offices and a day care center.

The building consists of A1 KG to 3rd floor, the building A2 including from KG to 7th floor. Underground parking.

The wiring and installations in the apartments, stairwells and in the basement done partly concealed and partly cable support systems or conduits.

In all apartments a complete electrical installation is installed (switches, sockets, data outlets, solid device connections, etc.)

In the housing units only ceiling outlets are installed.

There is installed a door intercom, so that each apartment has its own station.

In Building A2 a fire alarm system is installed in one floor.

- In the basement, a counter and a main distribution NSHV is mounted.

In the housing units only ceiling outlets are provided.

This multimedia router, the housing unit with telephone, TV and network is supplied.

- It will install a door intercom, so that each apartment has its own station.

- In the stairwells safety lighting is realized by means of self-contained luminaires.

- The electrical installation inside the apartments includes (sockets, switches, data outlets, solid device connections, etc.).

- In the basement, 2 meter main distributions and 2 NSHV's are mounted.

In the housing units only ceiling outlets are provided.

This multimedia router, the housing unit with telephone, TV and network is supplied.

- It will install a door intercom, so that each apartment has its own station.

- In the stairwells safety lighting is realized by means of self-contained luminaires.

- The electrical installation inside the apartments includes (sockets, switches, data outlets, solid device connections, etc.)

- In the 3rd floor, a fire alarm system is installed, which acts as an alarm system.

Building construction work

Staatliches Baumanagement Braunschweig | Published March 8, 2017
cpvs
45210000, 45200000, 45300000, 45400000, 45453100, 45216113

Complete renovation of the Grey House (accommodation building).

It is performed by subject award lots.

For details on the contents of the tray lots see each separate announcements that will follow after the Vorinformationsfrist.

The technical lots are possibly still divided.

Significant technical lots are:

- Scaffolding work;

- Structural work;

- Natural stone work;

- Waterproofing;

- Roofing works;

- Plastering work;

- Tiling;

- Metal construction;

- Paint and repainting;

- Floor covering work;

- Trockenbauarbeiten;

- Heating systems;

- Air conditioning systems;

- Sanitation works;

- Electrical and telecommunications works;

- Außenanlagen- and Public Works.

Architectural, engineering and planning services

Georg-Eckert-Institut – Leibniz-Institut für Internationale Schulbuchforschung | Published September 1, 2015  -  Deadline October 8, 2015
cpvs
71240000

The future Georg Eckert Campus will consist of three interconnected buildings, which differ significantly in construction time, use and design of each other. The four-storey, Grade II listed villa of the mid 19th century a magnified 2-storey foyer, basement , two-storey library is a complete new construction in reinforced concrete and steel construction, the six-storey former. Schwesternwohnheim from the early 1970s will be converted to the administration building, renovated and upgraded in accordance with today's requirements. Engineers should possess the requisite sensitivity and experience and skill in dealing with high-ranking monuments, in the lossless and robust implementation of design and functionality of sophisticated, contemporary architecture as well as routine in the renovation of administrative buildings. Should be entrusted the work phases 1-4 HOAI - technical equipment - with an option for ordering Lph 5-9 gem for the following asset groups. § 53 (2) HOAI: 4th power installations 5. telecommunications and information technology systems 6. conveyors.

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published April 13, 2017  -  Deadline May 16, 2017
cpvs
45311200, 45311100, 45317000

In the construction project is the construction of two new building type B1 and type B2, each having 31

Units, of which each 8 accessible units. The buildings C3 and C4 are identical and

consist of a basement, a ground, 1st, 2nd floor and a 3rd floor

The wiring and installations in the apartments, stairwells and in the basement area

be partly concealed and partly cable support systems or plumbing tubes.

In addition to the above types of installation installation are already during the construction phase in reinforced concrete walls

intended.

In all apartments a complete electrical installation is installed (switches, sockets, data outlets,

Hard device connections, etc.)

In the general area lighting fixtures are installed, as well as the outside of the doorway.

- In the basement, a main distribution counter is mounted,

In the common areas (staircases, corridors, basement) -

Lighting equipment installed and the outside of the doorway.

There are automatic circuits by means of motion in all general areas

(Basement, hallways, lobby) are provided.

Diffusers installiert.- Each unit will only be in the units with a fiber optic cable from the service entrance room to the multimedia

Router in the living unit connected. This multimedia router, the apartment is equipped with telephone,

TV and Internet connection provided.

- There is installed an audio intercom, so that each apartment has its own audio intercom,

- The electrical installation inside the apartments includes (sockets, switches, data outlets,

Fixed device connections, etc.).

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published March 31, 2017  -  Deadline May 2, 2017
cpvs
45311200, 45311100, 45317000

The buildings C3 and C4 are identical and consist of a basement, a ground, 1st, 2nd floor, 3rd floor, 4th floor and a penthouse level.

The wiring and the installations are in the apartments, stairwells and in the basement area partially concealed and partially cable support systems or plumbing tubes.

Installation methods installation are provided already during the construction phase in reinforced concrete walls.

In all apartments a complete electrical installation is installed (switches, sockets, data outlets, fixed device connections, etc.)

In the general area lighting fixtures are installed, as well as the outside of the doorway.

- In the basement, a main distribution counter is mounted.

- In the general area (stairways, corridors, the basement) are installed lighting fixtures, as well as outside of the entrance.

There are automatic circuits by means of motion in all general areas

(Basement, hallways, garbage room, lobby, bicycle and stroller space) is provided.

Diffusers are only installed in the units.

This multimedia router, the apartment with telephone, television and Internet connection is supplied.

- It will install a video intercom system, so that each apartment has its own video intercom.

- In the stairwells safety lighting is realized by means of individual luminaires.

- The electrical installation inside the apartments includes (sockets, switches, data outlets,

Hard device connections, etc.)

- In addition, an electronic sunshade system on the windows is provided.

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published September 22, 2017  -  Deadline October 24, 2017
cpvs
45311200, 45311100, 45317000

The construction project is the construction of two buildings. Building type D with 18 housing units and type C2 with 32

Units. The building D consists of a cellar floor, a ground floor, 1st floor, 2nd floor and 3rd floor. The building C2 also has a fourth floor and a second floor.

Laying of ducts and installations in apartments, staircases and cellars

partial flush-mounting and partly via cable support systems or installation pipes.

In addition to the above installation methods, installation is already in reinforced concrete walls during the raw construction phase

intended.

In all apartments, a complete electrical installation is installed (switches, sockets, data doses,

Fixed connections, etc.)

In the generally accessible areas, lighting bodies are installed, as well as outside the house entrance.

- A counter main distribution is installed in the basement.

- In the generally accessible areas (stairs, corridors, cellar)

Lighting installed, as well as outside at the home entrance.

Automatic circuits are activated by means of motion sensors in all general areas

(Cellar, corridors, garbage room, foyer, bicycle and baby carriage).

In the residential units, only ceiling outlets are installed. Each residential unit is equipped with a fiber optic cable from the house connection area to the multimedia-

Router in the residential unit. From this multimedia router, the residential unit is equipped with telephone,

Television and Internet connection.

- An audioshop is installed so that each apartment has its own audios.

- The electrical installation within the apartments includes (sockets, switches, data doses,

Fixed connections, etc.).