Public tenders for workspace-design in Hungary

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Sewage Treatment Plant existing building demolition, landscaping - informational award

Fővárosi Csatornázási Művek Zrt. | Published January 18, 2016
Winner
FLÁVY Kereskedelmi és Szolgáltató Kft.
cpvs
45111000

Disconnecting 2,000 m3, mash the gas tank in the South-Pest Wastewater Treatment Plant, the biogázvezeték system and demolish, obtaining the necessary regulatory approvals, manufacturing and regulatory licensing of demolition plans: existing building demolition, landscaping of the South-Pest Wastewater Treatment Budapest Sewage Works Ltd. colony.. After the breakdown freed paved area design workspace, the area thus formed concrete design, pallet, temporary storage of waste suitable for lightweight construction with an internal light, preparation and licensing authorities, obtaining the necessary regulatory approvals for construction projects. Biogázvezeték system of separation, demolition, paved the design workspace design of the lightweight construction of the gas tank floating lid in relation to the full range of official administration - notifying authorities, making announcements, etc. to obtain the necessary permits. - Bidder task. The demolition of existing buildings, landscaping and a detailed description of the operating conditions of the applicable documentation.

Water Tower renovation contract modification information

Dombóvár Város Önkormányzata | Published September 15, 2014
Winner
Topa és Társa Építési Kft.
cpvs
45262690

Works: Carry out Dombóvári Water Tower dangerous state of repair of termination. Summary of work: -. Vb tower body, connecting beams, pillars, the lower surface of the tower head tower head World Cup. Panels demolition works: plaster removal of 267 m2; surface preparation by sandblasting of 839 m2; identified concrete reinforcement surface preparation by sandblasting of 92 m2; -. Vb tower body, connecting pillars and beams, pillars, the lower surface of the tower head tower head World Cup. panels, wall panels active repair works of the purified surface protection of concrete reinforcement of 92 m2; surface preparation and leveling mortar bedding of 609 m2; repair of surface defects of 165 m2; átglettelése surface of 307 m2; Embed fiberglass mesh 507 m2; sandblasting of balancing the total surface area of ​​artificial stone wall panels 269 m2; terrazzo concrete wall panels uncovered iron surface in preparation for sandblasting and surface protection of 15 m2; artificial stone wall panels are more settled surface unevenness of 25 m2; entire surface of the concrete foundation and the color paint two coats of 1,083 m2; - Structural works 1925 m2; - Others: procession, workspace design, demarcation, electricity and water supply site design, posting warning signs, scrap, container loading, container removal, landscaping, cleaning, cleanup. Further detail in the documentation.

SIOP-2.2.6-12 / 1B-identification number from 2013 to 0016, "Fejér County St. George's University Teaching Hospital infrastructure in order to develop an integrated health care system in Fejér county" to carry out construction work related project called Enying

Fejér Megyei Szent György Egyetemi Oktató Kórház | Published December 14, 2015
Winner
ÉPKAR Zrt.
cpvs
45215140

Within the framework of a contract for the SIOP-2.2.6-12 / ID No. 1B-2013-0016, "Fejér County St. George's University Teaching Hospital infrastructure in order to develop an integrated health care system in Fejér county" establishment carrying out related civil works project known as micro-regional outpatient Enying Enying 8130, Freedom Square during 2294/4 No. 7, .: Id. Fejér County St. George's University Teaching Hospital in the framework of the SIOP-2.2.6-12 / 1B identification number of applications from 2013 to 0016, a new outpatient clinic building. 1,226 m2 of floor space, total utility for connection and 1 x 50 m3 tüzivíztároló tank below ground level installation, the paved surfaces ambulance stop the construction, bicycle storage installation, green space construction, barrier-free access suitable elevator and stairs construction, installation of railings, water and thermal insulation, built-in plot size: 654.72 m2. Total gross floor area: 1281.28 m2.Összes net floor area: 1,100.76 m2. The construction works on the main working parts (detailed design documentation and proposals in the budget) includes supporting documents for reference. The relevant construction plan documentation in detail the tasks to be performed and architectural requirements and the technology in an order prescribed difference (with the exception of the technical equivalent megajánlás) recorded in the plans and technical specifications are not allowed in the bidding, unless the system of supplementary information procedure, the contractor of the derogation It predicted intention and specifically approved by the contracting authority. Bidders from the previous ones in the event of a return, if in respect of materials and procedures set out in the plan documents you want to do technically equivalent megajánlást. Bidder may depart from that if in respect of materials and procedures set out in the plan documents you want to do technically equivalent megajánlást. Bidder may depart from that if in respect of materials and procedures set out in the plan documents you want to do technically equivalent megajánlást. The electronic logbook on stand Contracting Authority will make the day of conclusion of the contract, before the transfer of the workspace is no parade, no on-site construction tasks can not be performed (but can be made in the construction preparatory surveys, állapotrögzítések - the electronic logbook standby delay and three days after the transfer of the workspace after the parade and workspace design work (temporary facilities construction) can be performed. Supply and installation of medical technology devices are not the contractor is responsible. The contractor is also responsible during the implementation to carry out on-site technical management functions responsible and proper, careful construction management personnel and technical Ensuring too. Digital construction plan documentation and 1-1 for example. authorization plan documentation in paper or digital to the successful tenderer, with further plans specimens reproduce the contractor is responsible. Not later than the fifth business day following delivery of the work area the contractor is required to start the project to be demolished / the realization of design elements to be built. The execution brought the successful tenderer's bid - only with respect to a calendar updated - in professional technical schedule annexed to the tender and the contract must be subject to appropriate scheduling and organizational solutions. The warranty period (during the period of the contractor undertaking) the offeror is required to guarantee obligations as winner of the demand and availability as necessary to ensure and guarantee admittance on to appear warranty tasks arising in the context of warranty met.

Fejér County St. George's University Teaching Hospital carrying out related infrastructure development project called for an integrated health care system in Fejér county "construction works Enying

Fejér Megyei Szent György Egyetemi Oktató Kórház | Published December 11, 2015
Winner
ÉPKAR Zrt.
cpvs
45215140

"In the framework of a contract for the SIOP-2.2.6-12 / ID No. 1B-2013-0016," Fejér County St. George's University Teaching Hospital to develop infrastructure of carrying out related project called for an integrated health care system in Fejér county "construction works Enying Subregional clinic Enying 8130 , No. 7 Liberty Square, Id .: During 2294/4. Fejér County St. George's University Teaching Hospital in the framework of the SIOP-2.2.6-12 / ID No. 2013-0016-1B application of new outpatient clinic building. 1,226 m2 of floor space, total utility for connection and 1 x 50 m3 tüzivíztároló tank below ground level installation, the paved surfaces ambulance stop the construction, bicycle storage installation, green space construction, barrier-free access suitable elevator and stairs construction, installation of railings, water and thermal insulation, built-in plot size: 654.72 m2. Total gross floor area: 1281.28 m2.Összes net floor area: 1,100.76 m2. The construction works on the main working parts (detailed design documentation and proposals in the budget) includes supporting documents for reference. The relevant construction plan documentation in detail the tasks to be performed and architectural requirements and the technology in an order prescribed difference (with the exception of the technical equivalent megajánlás) recorded in the plans and technical specifications are not allowed in the bidding, unless the system of supplementary information procedure, the contractor of the derogation It predicted intention and specifically approved by the contracting authority. Bidders from the previous ones in the event of a return, if in respect of materials and procedures set out in the plan documents you want to do technically equivalent megajánlást. Bidder may depart from that if in respect of materials and procedures set out in the plan documents you want to do technically equivalent megajánlást. Bidder may depart from that if in respect of materials and procedures set out in the plan documents you want to do technically equivalent megajánlást. The electronic logbook on stand Contracting Authority will make the day of conclusion of the contract, before the transfer of the workspace is no parade, no on-site construction tasks can not be performed (but can be made in the construction preparatory surveys, állapotrögzítések - the electronic logbook standby delay and three days after the transfer of the workspace after the parade and workspace design work (temporary facilities construction) can be performed. Supply and installation of medical technology devices are not the contractor is responsible. The contractor is also responsible during the implementation to carry out on-site technical management functions responsible and proper, careful construction management personnel and technical Ensuring too. Digital construction plan documentation and 1-1 for example. authorization plan documentation in paper or digital to the successful tenderer, with further plans specimens reproduce the contractor is responsible. Not later than the fifth business day following delivery of the work area the contractor is required to start the project to be demolished / the realization of design elements to be built. The execution brought the successful tenderer's bid - only with respect to a calendar updated - in professional technical schedule annexed to the tender and the contract must be subject to appropriate scheduling and organizational solutions. The warranty period (during the period of the contractor undertaking) the offeror is required to guarantee obligations as winner of the demand and availability as necessary to ensure and guarantee admittance on to appear warranty tasks arising in the context of warranty met.
  • 1