Public tenders for urban-design in Poland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Cloves: ZP.271.09.2016 - Competition for architectural - urban design concept Team of Schools No. 4 in Ząbki

Miasto Ząbki | Published August 12, 2016
cpvs
71221000

Landscape architectural services

Polskie Koleje Państwowe S.A. | Published August 26, 2016
cpvs

Competition for the concept of architectural and urban design for the investment project "Railway Museum" located at ul. Needed in Warsaw.

Landscape architectural services

Polskie Koleje Państwowe S.A. | Published December 26, 2015  -  Deadline January 25, 2016
cpvs
71420000, 71221000

Competition for the concept of architectural and urban design for the investment project "Museum Station" located at ul. Needed in Warsaw.

Architectural services for outdoor areas

Agencja Rozwoju Gdyni Sp. z o.o. | Published October 3, 2017  -  Deadline October 23, 2017
cpvs
71222000, 71220000

A competition for the development of an architectural and urban design concept "Construction of a central park with an underground car park for 270 cars in Gdynia.

Expansion of fiber network surveillance system in the form of design and build.

 | Published January 17, 2014  -  Deadline February 4, 2014
cpvs
71320000, 45230000

The contract is the expansion of the fiber network in the form of monitoring of urban design and build. Scope of the contract includes the integration of 6 cameras monitoring system of urban fiber network owned by the Purchaser. A detailed description of the contract is attached hereto No. 7. The Employer describes the object of the contract by the functional program. The Purchaser for all names, trademarks, patents, or origin indicated in the detailed description of the order attached as Annex 7 to the Terms of Reference, add the words or equivalent. The procedure is conducted in a proper procedure for the contract with an estimated value below the amount of 5,186,000 euros for works ..

Execution of works involving reconstruction (modernization) Dental Centre SPZOZ MSW in Lodz, located at ul. Anstadt 4 in Lodz ..

 | Published October 16, 2013  -  Deadline October 31, 2013
cpvs
45210000, 45300000

The contract is for the execution of works involving: reconstruction (modernization) Dental Center Independent Public Healthcare Ministry of the Interior in Lodz, located at ul. Anstadt 4 in. by detailed design carried out by the Laboratory of Architecture and Urban Design in Łódź, ul. Piotrkowska 182 def. 14a architect Witold Mechowskie. The scope of work includes: a) construction work - according to the project b) the internal systems of ventilation and air-conditioning according to the project c) the installation of plumbing inner-according to the project d) internal wiring in accordance with the project-s) telecommunication systems as designed f ) internal thermal installations in accordance with the project.

Stalowa Wola: Design of construction -wykonawczego two buildings, multifamily residential street. Orzeszkowej in Stalowa Wola

Miejski Zakład Budynków Sp. z o.o. | Published July 28, 2016  -  Deadline July 25, 2016
Winner
ARCHI PROJEKT Biuro Projektowe S.C. M. Głód, D. Kozak, ul. Kazimierza Wielkiego 11, 32-700 Bochnia, kraj/woj. małopolskie.
cpvs
71000000, 71248000, 71222000, 71222000, 71242000, 71320000, 71322000

Purchaser orders and the Contractor undertakes to perform pełnobranżową project documentation, construction and executive two residential buildings at ul. Orzeszkowej in Stalowa Wola together with the necessary infrastructure, land development, preparation STWiOR, investment cost estimates and przedmiarów, as well as obtaining all necessary approvals, permits and decisions (in particular, the building permit) for a property located in Stalowa Wola at ul. Orzeszkowej, plot no. No. Acts 26/94, OBR 3 on the basis of possessed by the Employer urban design and architecture of two buildings, multifamily residential street. Orzeszkowej in Stalowa Wola (No. 7 annexed hereto). The Contractor undertakes to supervise copyright in developed documentation and commits ourselves to attend to the call of the Employer in the place where the work carried out on the basis of this documentation. Travel costs borne by the Contractor.

Print service applications for city cards and applications for enabling the charging of student season tickets.

 | Published August 2, 2013  -  Deadline August 12, 2013
cpvs
79823000

1.Przedmiotem contract is the execution and delivery of prints: a.Wniosków for an urban-design Card No. 1 attached as Schedule 1 to the contract-format-A5-number-25 000 pcs-color 1-0,-weight 90g -m2-perforations in the dotted line position; b.Wniosków to allow charging student card season tickets - Formula No. 2 attached as Schedule 1 to the contract. -Multi-A5-number-15 000 pcs-color 1-0,-Weight 90g-m2-perforations in the dotted line position; 2.Wykonawca received from the Employer PDF files and CorelDraw. Powered files contractor should check for proper preparation for printing and, if necessary, correct it. Before printing materials, including the application of any amendments, the Contractor shall submit to the Purchaser all of the files as a proof for approval. Approved proof will be the basis for the conformity assessment print project. 3.Wykonawca undertakes to perform każdorazowych orders within 5 working days from the date of delivery by the Purchaser of projects in PDF files and CorelDraw11 prepared in the CMYK color space. In the event that the Purchaser in the incoming batch of printed materials, quality defects and non-compliance with the quantitative amounts declared, the Contractor shall, within three days from the delivery of non-compliance, provide at his own expense a new free from defects in materials or to complete an incomplete delivery ..

Execution of construction works on the revitalization of the building former bathhouse Theodosia Majewska Street. Bednarska 2/4 in Warsaw.

 | Published March 26, 2014  -  Deadline April 10, 2014
cpvs
45100000, 45111200, 45111213, 45111220, 45112700, 45200000, 45230000, 45231000, 45231400, 45300000, 45310000, 45311000, 45317000, 45314310, 45330000, 45320000, 45331000, 45331210, 45332200, 45332300, 45400000

1.Przedmiotem contract is the execution of construction works for the revitalization of the old baths building Majewska Theodosia Street. Bednarska two quarters in Warsaw. 2.Budynek is entered in the register of monuments under A-8. 3.Przedmiot order is carried out under the initiative Jessica implemented under the Regional Operational Programme 2007-2013 Mazowiecki. Urban Design financed by European Union from the European Regional Development Fund and the state budget under the Regional Operational Programme 2007-2013 Mazowiecki. 3.Zakres work includes: 1) External works: a) preparatory works, b) earthworks and surfacing, c) external insulation of the foundation walls - horizontal - vertical, d) external earthworks and transport of debris, e) flashings on roof and roof covering, f) installation of lightning, g) partitions, h) woodwork and ironwork window, and) woodwork, j)-entrance stairs northern elevation, k) wells Illuminates basement room, l) repair and structural reinforcement of cracked walls , m) plaster works, n) renovation details stucco o) painting, p) maintenance of stone elements, q) conservation repair of metal, r) architectural elements - stucco, s) repair the portico balcony, 2) internal works: a) reconstruction rooms of the building and restoration of historic architectural design, b) the replacement of electrical installations, c) the replacement of sanitary, d) the replacement of the low-e) building retrofit installations of mechanical ventilation and air-conditioning. 4.Szczegółowy description of the contract is the documentation - Appendix No. 1 to the specification of essential terms of the contract, hereinafter referred to as the Specification or Terms of Reference - available on the website of the client. 5 The Contractor is obliged to notify the Employer of any discrepancies in the accompanying documentation (Appendix No. 1 to the ToR). Making changes without the consent of the Employer, shall be deemed to change the contract and will result in rejection of the offer. 6 In the event that the Purchaser has made the terms of reference in the documentation which the Annex to the Terms of Reference for the indication of trade marks or origin, contractors are required to offer materials / equipment specified in the documentation or the equivalent parameters of this type, but not worse than indicated. 7 It is recommended to make a site visit to the place where the object of the contract in order to obtain the necessary information for the correct and complete preparation of the offer. Term vision should determine the local telephone with Mr. Slawomir Staszakiem phone 22 55 22 946 (from Monday to Friday. 12.00. - 14.00). CPV: 45100000-8, 45111200-0, 45111213-4, 45111220-6, 45112700-2, 45200000-9, 45230000-9, 45231000-5, 45231400-9, 45300000-0, 45310000-3, 45311000-0, 45317000-2, 45314310-7, 45330000-9, 45320000-6, 45331000-6, 45331210-1, 45332200-5, 45332300-6, 45400000-1, 45410000-4, 45442100-8, 45442200-9, 45450000 - 6, 45453000-7, 45453100-8 ..

Development of the draft zoning and land use, determine the location of a public investment and projects changes in zoning and land use together with analyzes of urban

 | Published February 25, 2014  -  Deadline March 6, 2014
cpvs
71410000

1 The contract scope includes: Development of the draft zoning and land use, determine the location of a public investment and projects changes in zoning and land use together with analyzes of urban 2.Zamawiający reserves that w / the number of services / supplies are estimated quantities , serving to calculate the price, compare offers and choose the best offer. 3 These amounts are estimates. Contractor will not be entitled to any claims for orders less services. The Employer reserves the right to reduce the amount of individual services up to 35% in case of no influence to the Purchaser the estimated number of applications. 4 Conditions for the preparation of decisions: 1 Implementation of up to 105 pieces of sets of documents for real estate in the municipality of midwives Pruchnik including: 1.1. drafting of zoning - to 87 pcs 1.2. development projects, decisions setting the location of a public investment - up to 15 1.3. develop draft amendments to the above decisions to 3 units 1.4. Purchaser reserves that w / a number of services, provide assessment, serving to calculate the price, compare offers and choose the best offer. 1.5. stated amounts are the maximum. Contractor will not be entitled to any claims for orders less services. The Employer reserves the right to reduce the amount of individual services up to 35% in case of no influence to the Purchaser the estimated number of applications. 2 On a single draft decision consists of: 2.1. analysis of the functions and features of the land development copies 3, 2.2. content of the decision and the reasons for and results of the analysis of the functions and features of the land development copies 3, 2.3. map - Annex graphic to the decision of the metric decisions and the necessary markings and legend and graphic attachment to the analysis of metric and necessary signs and copies legend 3 3 The Contractor is required to collect their own information necessary for the proper performance of the draft decision, including, among other things: making the vision in the area of ​​investment for compliance with the provisions on the protection of nature, environmental protection and regulations on the protection of agricultural and forest land. 4 Draft decisions will be developed in accordance with the Regulation of the Minister of Infrastructure dated 26 August 2003. on how to determine requirements for new buildings and land in the absence of the local development plan (Journal of Laws No. 164, item. 1588). 5 Time to forward the draft decision of the receipt of the dossier. 5.1. - 14 days for a decision to fix the building and land, 5.2. - 7 days for a decision fixing the location of a public investment, 5.3. - 7 days to change a decision fixing the location of a public investment 5.4. -7 Days to change the decision to fix the building and land development 6 The Contractor shall provide the Purchaser a draft decision containing some text and graphics, along with the results of the analysis of urban design in print and in electronic form - CD ..

Revitalization Tyszkiewicz-Potocki Palace on campus at the Krakow suburb 32 in Warsaw to develop educational and cultural functions of the object.

 | Published March 26, 2014  -  Deadline April 10, 2014
cpvs
45453000, 45262690, 45421132, 45410000, 45261210, 45420000, 45310000, 45320000

1 The contract is for the revitalization of the Palace Tyszkiewiczów-Potocki on the university campus at. Krakow suburb 32 in Warsaw in order to develop educational and cultural functions of the object, hereinafter referred to as the robots. 2 The building referred to in paragraph. 1, is entered in the register of monuments under No. A-245 Decision of the Provincial Conservator of 1.07.1965r. 3 Object of the contract is being carried out under the initiative Jessica implemented under the Regional Operational Programme 2007-2013 Mazowiecki. Urban Design financed by European Union from the European Regional Development Fund and the state budget under the Regional Operational Programme 2007-2013 Mazowiecki. 4 Ordering a possibility of partial bids. 5 Therefore, every-specified in the Terms of Reference section (2 parts) should be treated as a separate object of the contract (separate contract), all records contained in the Terms of Reference for the offer to be understood as a partial offer. 6 The Purchaser has divided the contract into two parts: Part 1 - applies to interior works, which include renovation and restoration work Billiard Hall, the Guest Hall, the lobby and stairwell, hereinafter also part 1 and Part 2 - applies external works, which include replacement of roofing, carpentry, renovation of the facade, color, drying foundation walls, repair bramnego pass with gate and lighting, maintenance of the gate with metal elements, maintenance elements of stone and door joinery, repair ties with paving, installation of lightning protection and anti-icing - hereinafter also part 2 7 The scope of works in Part 1 includes the renovation and maintenance of the Billiard Hall, the Guest Hall and staircase, along with the installation of fire., Replacement of radiators with mains installation at the Billiard Hall, the Guest and Lobby. 8 The scope of works in Part 2 includes: 1) Drying of foundation walls, the insulation performance of the horizontal and vertical foundation walls crystal injection methods and traditional; 2) Replacement of roofing, roof truss repairs, replacement of flashings 3) Repair restoration of the facade and the colors 4) The exchange of the replacement window frames; 5) Maintenance pass gate with lighting, 6) Maintenance of metal gates and other metal; 7) Axle ties with flagstones; 8) Restoration work elements of stone and wood; 9) Installation of lightning and install anti-icing. 9 Robots Part 1 will be carried out on the basis of the final decision: a) permit for construction works no 568/Ś/2013 of 16.09.2013 laying b) of Decision No 85 R/13 dated 11/07/2013, Capital Conservator, 10 . Robots in Part 2 will be carried out on the basis of final decisions: a) permit for construction works no 739/Ś/2013 of 05.12.2013 r, b) Decision No 2385 dated 14.11.2013 N/13, Capital Conservator. 11 A detailed description of the contract for lot 1 - is the documentation - Appendix 1 to the specification of essential terms of the contract, hereinafter referred to as the Specification or Terms of Reference, available on the website of the client. 12 A detailed description of the contract for Part 2 - is documentation - Appendix 2 hereto, - available on the website of the client. 13 The Contractor is obliged to notify the Employer of any discrepancies in the accompanying documentation (Appendix No. 1 and 2 to the ToR). Making changes without the consent of the Employer, shall be deemed to change the contract and will result in rejection of the offer. 14 In the event that the Purchaser has made the terms of reference in the documentation, which is the Annex to the Terms of Reference (Appendix 1 and 2 to the ToR) for the indication of trade marks or origin, contractors are required to offer materials / equipment specified in the documentation or the equivalent parameters of this type, but not worse than indicated. 15 It is recommended to make a site visit to the place where the object of the contract in order to obtain the necessary information for the correct and complete preparation of the offer. Term vision should be established a local phone from Monday to Friday 10.00-14.00 with n. persons: Mr. Wojciech Miksa tel 606-288-043 or Ms Danuta Balcerzak phone (22) 55-22-512 ..

Development of project - estimate for the modernization of the facade of the building of the Wielkopolska Provincial Office in Poznan at Freedom Square 17.

 | Published March 18, 2014  -  Deadline March 26, 2014
cpvs
71220000

1 The contract is for the development of the design - the estimate for the modernization of the building facade Wielkopolska Regional Office in Poznan at Liberty Square 17 2 Scope of the study should include: a) inventory for design purposes, b) the architectural design of the building - executive takes into account: - Polishing stones from the front of the building and removing the metal elements - warming the building, the location of the plaster, the exchange window sills and trims from the yard, the colors of the facade, - vertical and horizontal insulation of the building, - the replacement of gutters and downpipes, - the replacement door and windows on the ground floor in the room porter, - external monitoring and meeting customer A and B, with a preview of the gatehouse building - the liquidation of architectural barriers in the form of 6 degrees stairs (from the entrance to the building to the mezzanine, where the elevator is installed) by installing a stair platform, c) investment estimate, d) specification of the performance and acceptance of, e) the bill of quantities, f) arrangements of urban design documentation conservator in Poznan and obtaining a permit on behalf of the investor conservation. 3 Object of the contract also includes the supervision of copyright, providing explanations and answers to any query Contractors and possible check bids submitted in the proceedings tender (proceedings) for the construction work. 4 Documentation shall be made in such a way that it was possible to stage the construction works. 5 The Contractor is obliged to raise its own and at their own expense all necessary data for the design output. 6 The responsibilities of the designer will include obtaining all necessary arrangements possible project documentation. 7 Documentation should be made able to complete from the point of view of the objective which it is intended, ie: 1) a description of the subject of the works contract for the tender on the basis of the Law on Public Procurement Law 2) as a basis for the full range of works. 8 The design documentation should be prepared diligently and in accordance with the principles of modern technical knowledge, applicable regulations and Polish Standards. 9 Design work can take place after approval by the Purchaser developed concept. 10 The contractor is required prior to the preparation of project documentation to carry out the vision of the local telephone after appointment of Mr. Zbigniew Bochenski 698-889-444. 11 The Contractor shall provide the Purchaser documentation referred to in paragraph 3 of 5 paper copies and 2 copies in electronic format modifiable and non-modifiable dwg in pdf format. 12 The scope of the supervision of copyright: 1) controlling the compliance of the works with the project documentation, the applicable laws and standards, 2) clarification of doubts concerning the design and construction of the Executive contained therein and possible solutions complement detail design documentation, 3) agreeing with the Employer, the works the introduction of alternative solutions to those provided for in the project documentation with respect to the materials and construction, and technical and technological solutions, 4) supervising that the scope of the changes did not cause a significant change in the approved project construction, 5) participation in committees and technical meetings organized by the Employer participation in the handovers of work disappearing and final acceptance of the works. 13 Contractor under the contract awarded will be required to SSO renovation investment cost estimates at the request of the Employer ..

Architectural, construction, engineering and inspection services

Miasto Stołeczne Warszawa – Stołeczny Zarząd Rozbudowy Miasta | Published October 17, 2017
cpvs
71000000, 71220000, 71221000

Textile.

Textile.

King Maciusia in Warsaw as well as the entry and infrastructure of the church.

The scope of the contract includes:

1) Inventory of an existing service building (in 6 copies)

2) Demolition project of an existing service building (in 6 copies)

3) Geotechnical documentation (in 3 copies),

Korkowa (in 3 copies),

5) Construction design (in 6 copies)

6) Implementing Projects (in 6 copies),

7) Technical Specifications of Construction and Delivery of Works (STViOR) (in 6 copies)

8) Bill of quantities (in 6 copies)

9) Investor Estimates (in 4 copies)

10) Obtaining all the required approvals, arrangements, opinions, expertise and verification of design solutions and obtaining the decision on the permit for demolition and the decision on the building permit, as well as the development of any materials within the scope of the law or the requirements of authorized entities,

11) The author's supervision over the execution of the works covered by the documentation.

The design and tender documentation should be made in the form of:

1) paper in quantities as above.

2) electronic 4 copies on electronic medium CD or DVD, including:

1247) and (* .pdf), for text (* .pdf) and (* .doc),

b) bill of quantities, investor's invoices in the format (* .ath),

c) Technical Specifications for Construction and Delivery of Works (in the format (* .doc) or (* .rtf) and (* .pdf),

3) Formal and legal attachments, including: decisions, opinions, expert opinions, permits and agreements, the Contractor shall provide in the original and on electronic medium CD or DVD format (* .pdf).

The contractor will provide the Purchaser with an electronic form of the documents covered by the subject of the order, which will be compatible with the paper form of the above mentioned. The electronic form in the format (* .pdf) will contain all signatures and stamps, stamped on paper, in the course of making arrangements and arrangements.

The contractor does not need to be employed by the Contractor or the subcontractor on the basis of the contract of employment of persons carrying out activities related to the performance of the contract.

Contract performance deadline:

1) commencement - immediately from the date of signing the contract,

2) Completion of execution of design and tender documentation - within 12 months from the date of concluding the contract, including:

a) inventory of an existing service building, demolition project, geotechnical documentation, architectural and urban design - within 3 months from the date of conclusion of the contract,

b) construction design - within 8 months from the date of conclusion of the contract,

c) execution projects, STWiOR, bill of quantities, investor's estimates - within 12 months from the date of conclusion of the contract,

3) The author's supervision will be carried out in accordance with the needs resulting from the execution of construction works - by 15.12.2020.

Provision of educational services consisting in the carrying out didactic-compensatory and additional extracurricular activities and extracurricular activities for participants and participants of the project I have a profession - I work in the region - 59 parts.

 | Published October 2, 2014  -  Deadline October 13, 2014
cpvs
80310000

The contract is for the provision of educational services consisting in carrying out educational activities compensatory and additional extra-curricular activities and extracurricular activities for the participants and the participants of the project I have a job - I work in the region - 59 parts. 1 The contract is divided into: 1.1.CZĘŚĆ 1: Provision of educational services consisting in carrying out educational activities compensatory Physics at the Technical Scientific Works Envisaged number of service providers: 1 teacher; Expected number of hours the service: 15 hours (group 1). 1.2.CZĘŚĆ 2: Provision of educational services consisting in carrying out educational activities compensatory Physics at the School of Electrical Mechanics Envisaged number of service providers: 1 teacher; Expected number of hours the service: 15 hours (group 1). 1.3.CZĘŚĆ 3: Provision of educational services consisting in carrying out educational activities compensatory Physics in one of the schools. B.Prusa Envisaged number of service providers: 1 teacher; Expected number of hours the service: 15 hours (group 1). 1.4.CZĘŚĆ 4: Provision of educational services consisting in carrying out educational activities compensatory Electrical Engineering at the Technical Scientific Works Envisaged number of service providers: 1 teacher; Expected number of hours the service: 40 hours - 20 hours / group (2 groups). 1.5.CZĘŚĆ 5: Provision of educational services consisting in carrying out educational activities compensatory Programming in Scientific and Technical Works Envisaged number of service providers: 1 teacher; Expected number of hours the service: 60 hours - 20 hours / group (3 groups). 1.6.CZĘŚĆ 6: Provision of educational services consisting in carrying out educational activities compensatory Polish Language at the School car-Building Envisaged number of service providers: 1 teacher; Expected number of hours the service: 15 hours (group 1). 1.7.CZĘŚĆ 7: Provision of educational services consisting in carrying out educational activities compensatory Polish Language at the School of Technical and General them. Żeromskiego Envisaged number of service providers: 1 teacher; Expected number of hours the service: 15 hours (group 1). 1.8.CZĘŚĆ 8: Provision of educational services consisting in carrying out educational activities compensatory Polish language in one of the schools. Reymont Envisaged number of service providers: 1 teacher; Expected number of hours the service: 15 hours (group 1). 1.9.CZĘŚĆ 9: Provision of educational services consisting in carrying out educational activities compensatory Polish language in one of the schools. Gen. Anders Envisaged number of service providers: 1 teacher; Expected number of hours the service: 30 hours - 15 hours / group (2 groups). 1.10.CZĘŚĆ 10: Provision of educational services consisting in carrying out educational activities compensatory Polish Language in the Technical Scientific Works Envisaged number of service providers: 1 teacher; Expected number of hours the service: 30 hours - 15 hours / group (2 groups). 1.11.CZĘŚĆ 11: Provision of educational services consisting in carrying out educational activities compensatory green architecture at the School of Technical Envisaged number of service providers: 1 teacher; Expected number of hours the service: 20 hours (group 1). 1.12.CZĘŚĆ 12: Provision of educational services consisting in carrying out educational activities compensatory Architecture greenery in one of the schools. Gen. Anders Envisaged number of service providers: 1 teacher; Expected number of hours the service: 20 hours (group 1). 1.13.CZĘŚĆ 13: Provision of educational services consisting in carrying out educational activities compensatory Design landscape architecture and urban design at the School them. Gen. Anders Envisaged number of service providers: 1 teacher; Expected number of hours the service: 20 hours (group 1). 1.14.CZĘŚĆ 14: Provision of educational services consisting in carrying out educational activities compensatory HR and payroll in one of the schools. J. Kochanowski Envisaged number of service providers: 1 teacher; Expected number of hours the service: 25 hours (group 1). 1.15.CZĘŚĆ 15: Provision of educational services consisting in carrying out educational activities compensatory HR and payroll at the School of Economics Expected number of service providers: 1 teacher; Expected number of hours the service: 25 hours (group 1). 1.16.CZĘŚĆ 16: Provision of educational services consisting in carrying out educational activities compensatory at the School of Geography them. B. Prusa Envisaged number of peo

Picking the Contractor of design and construction and installation works relating to the implementation of a new building designed for the needs of the Institute of Geological Sciences, Jagiellonian University, located in the Campus 600th anniversary of the Restoration of the Jagiellonian University in Krakow. Case No: CRZP/UJ/501/2013.

Uniwersytet Jagielloński | Published March 26, 2014
Winner
Konsorcjum Firm: Aldesa Construcciones Polska Spółka z ograniczoną odpowiedzialnością (Lider) i Aldesa Construcciones S.A. (Partner)ul. Postępu 18Warszawa 02-676 +48 225704450 +48 226061484
cpvs
45000000, 45111200, 45260000, 45300000, 45321000, 45331100, 45310000, 45315100, 45312100, 45314300, 45314200, 45314320, 71000000, 71200000, 71220000, 71221000, 71240000, 71242000, 71245000, 71320000, 45442100, 45330000, 45331000, 45332000, 45311100, 45311200, 45317000, 45400000, 45450000, 45420000, 45430000

1 The subject of the proceedings and the order is to select the Contractor, acting as General Contractor for the execution of all activities related to the implementation of design and construction and assembly works and supply and installation of equipment for the new building designed for the needs of the Institute of Geological Sciences, Jagiellonian University, located in the Campus 600th anniversary of the Restoration of the Jagiellonian University in Krakow. 1.1 Detailed description of the contract is Functional Utility program (hereinafter abbreviated PFU), attached as Schedule A hereto (one PDF file containing 899 pages), and an integral part of the tender documents. 1.2 The contractor before signing the contract is obliged to present and agreed with the Employer and financial schedule of implementation of works in formats Excel and Microsoft Project. 1.3 The Contractor shall submit a construction insurance and construction insurance policy against all risks of construction on the amount resulting from the gross value of the agreement within 7 days from the date of transfer of the construction site. 1.4 Object of the contract associated with the design and construction will be subject to an independent quality control designed to give international quality certification for the object according to TÜV BQS 4 or an equivalent. The procedure for certification of the facility shall independent entity acting at the expense of the Purchaser and order. 2 The scope of work includes, in particular: 2.1 to obtain copies of the basic map for design purposes and on the basis of a power of attorney given to the occurrence of the administrators of the media and obtain technical conditions in the power, then design documentation arrangements with these companies, and preparing proposals to sign the contract by the contracting authority in terms of connections to the network, and make other necessary arrangements with external entities such as, eg Departments of the City of Krakow, ZIKiT and other 2.2 to develop complete applications for a permit to demolish the objects collide, a building permit and possibly to remove the conflicting elements of land development and submitting them on behalf of the Employer on the basis of the authorization granted to the authorities, in accordance with the development of 2.3 PFU: architectural and urban design concept selected by the Employer (3 variants), in the form of presentation and visualization of spatial construction project executive, STWiOR, bill of quantities, cost estimates simplified with the juxtaposition of materials, documentation, health and safety BIOZ, where: 2.3.1 Subject studies must be submitted to the Employer for its exclusive use in an electronic version (dwg, doc and the whole PDF) and in hard copy in the amount of 3 copies of the construction project (in including two originals), 3 copies of the final design, 2 copies of other materials, 2.3.2 documentation executive in the field of fire protection - safety, customization facility for the disabled and the computer network and BMS must approve the transfer to be agreed with the relevant services of the Contracting Authority, 2.4 providing surveillance surveying, archaeological and geological during the implementation, 2.5 implementation of construction - assembly with mounting devices and accessories described in detail in the PFU, 2.6 draw up instructions for the installation of internal co-operation in this manual transformer station with the installation of internal and transfer them to the user in During training prior to final acceptance and handling instructions in case of fire, as-built 2.7 development projects in duplicate and in the form of digital media data in Word, DWG, PDF, 2.8 Energy performance certificates building, 2.9 to obtain positive decision by the competent authority after completion of construction, the particular, the State Sanitary Inspection, the State Fire Service, to the extent required by applicable law and any other documents and statements required to be obtained by the Contractor and on behalf of the Employer decision to permit use of the facility, 2.10 other work activities and make payment (in including, among others, project traffic organization and its projects, the fee for occupation of roadway and work in accordance with the decision ZIKiT and others), resulting in progress and necessary for the implementation of the agreement, the value of which must include a lump-sum, because the agreement does not provide for additional works nor complementary. 3 Characteristics of the facility: 3.1 Object public function object: Scientific and didactic lecture halls, seminar rooms, administrative (administrative areas, economic, etc.), 3.2 Estimated size of the building specified in the functional and utilitarian: 3.3 area = 3651.00 m2 3.4 Net area of ​​4,851.00 m2 = 3.5 The total area = 5

Contractor emergence of design and construction and installation works relating to the implementation of a new building designed for the needs of the Institute of Geological Sciences, Jagiellonian University, located on the campus of the 600th anniversary of the Restoration of the Jagiellonian University in Krakow. No: CRZP/UJ/501/2013.

Uniwersytet Jagielloński | Published November 19, 2013  -  Deadline January 8, 2014
cpvs
45000000, 45111200, 45260000, 45300000, 45321000, 45331100, 45310000, 45315100, 45312100, 45314300, 45314200, 45314320, 71000000, 71200000, 71220000, 71221000, 71240000, 71242000, 71245000, 71320000, 45442100, 45330000, 45331000, 45332000, 45311100, 45311200, 45317000, 45400000, 45450000, 45420000, 45430000

1 The subject of the proceedings and the order is the emergence of the Contractor, acting as General Contractor for the execution of all activities related to the implementation of design and construction and installation works and supply and installation of equipment for the new building designed for the needs of the Institute of Geological Sciences, Jagiellonian University, located on the Main Campus 600th Anniversary of the Restoration of the Jagiellonian University in Krakow. 1.1 Detailed description of the contract contains a functional and utilitarian (hereinafter abbreviated PFU), attached as Schedule A hereto (one PDF file containing 899 pages), and an integral part of the tender documents. 1.2 The contractor before signing the contract is obliged to present and agreed with the Employer and financial schedule of the implementation of the works in formats Excel and Microsoft Project. 1.3 The Contractor shall submit a construction insurance and construction insurance policy against all risks of building on the amount resulting from the gross value of the contract within 7 days from the date of the construction site. 1.4 Object of the contract related to the project and construction will be subject to an independent quality control designed to give international quality certification for the object according to TÜV BQS 4 or an equivalent. The certification of the facility shall independent entity operating costs and order the Employer. 2 The scope of work includes, in particular: 2.1 to obtain a copy of the basic map for design purposes and on the basis of a power of attorney given instance of the administrators of the media and obtain technical conditions in the power, then the project documentation arrangements with these companies and the preparation of proposals to sign the contract by the contracting authority for the connections to the network, and to make other necessary arrangements with external entities such as, eg Departments of the City of Krakow, ZIKiT and other, 2.2 establishing a complete permit applications for demolition of colliding, a building permit and possibly to remove the conflicting elements of land use and putting them on behalf of the Purchaser pursuant to the authorization granted to the authorities, in accordance with the development of 2.3 PFU: architectural and urban design concept selected by the Employer (3 variants), in the form of presentation and visualization of spatial construction project executive STWiOR, bill of quantities, cost estimates simplified the BOM documentation of safety and health BIOZ, as follows: 2.3.1 Subject to the development of the Purchaser to pass on his exclusive use in an electronic version (dwg, doc and the whole PDF) and in hard copy in the amount of three copies of the construction project (in including two originals), three copies of the final design, two copies of other materials, performance documentation 2.3.2 of fire - safety, customization facility to meet the needs of disabled people and network, and BMS is by submitting to the approval of relevant departments agreed with the Employer, 2.4 providing surveillance surveying, archaeological and geological in progress, 2.5 implementation of construction - assembly and installation of machinery and equipment described in detail in the PFU, 2.6 prepare for the installation instructions in the user's internal transformer station co-operation with the installation of interior and transfer them to the user in During training prior to final acceptance and handling instructions in case of fire, as-built 2.7 development projects in duplicate and in the form of digital storage medium in Word, DWG, PDF, 2.8 Energy performance certificates building 2.9 a positive decision by the competent authority after completion of construction, the particular, the State Sanitary Inspection, the State Fire Service, to the extent required by applicable law and any other documents and statements required to be obtained by the Contractor and on behalf of the Employer decision to permit the use of the facility, 2.10 other work activities and make payment (in including but not limited project traffic organization and its projects, the fees for occupation of roadway and work in accordance with the decision ZIKiT and others), resulting in the implementation and necessary for the execution of the contract, the value of which must include a lump sum price, because the agreement does not provide for additional works or complementary. 3 Characteristics of the facility: 3.1 public property, object functions: research and teaching lecture halls, seminar rooms, administrative (administrative areas, economic, etc.), 3.2 Estimated size of the building in the program functional and operational: 3.3 area = 3651.00 sq ft 3.4 Net Area = 4851.00 m² 3.5 The total area =
  • 1