Public tenders for architect, architecture in Wejherowo Poland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Organisation of architectural design contests

Gmina Miasto Wejherowo | Published October 16, 2015
cpvs
71230000, 71000000, 71220000, 71320000, 71240000

Organizowanie architektonicznych konkursów projektowych

Organisation of architectural design contests

Gmina Miasto Wejherowo | Published June 13, 2015  -  Deadline June 19, 2015
cpvs
71230000, 71000000, 71220000, 71320000, 71240000

Organizowanie architektonicznych konkursów projektowych

Architectural, construction, engineering and inspection services

Szpital Specjalistyczny im. F. Ceynowy Sp. z o.o. | Published January 3, 2015  -  Deadline January 27, 2015
cpvs
71000000, 71220000, 71221000, 71320000, 71325000, 71327000, 79932000

Usługi architektoniczne, budowlane, inżynieryjne i kontrolne

Architectural, construction, engineering and inspection services

Gmina Miasto Wejherowo | Published December 8, 2015  -  Deadline January 4, 2016
cpvs
71000000, 71240000, 71220000, 71320000, 71248000

1. The contract is a concept and project documentation, cost estimates and STWiORB selected elements recreational infrastructure in the area of ​​City Park and the Calvary of Wejherowo with the option's supervision. 1) Documentation: a) The design documentation shall be drawn up in such a way that staging, obtaining a decision on the building permit, implementation plans and obtain permission to use separately for each of the subsequent stages, b) The basis of the design documentation will be forwarded to the Contractors at the end of Intercultural Dialogue final description of the contract. This description will be made by the Purchaser on the basis of the solutions presented by the Contractors during the Dialogue and will be an integral part of the Terms of Reference, which will be communicated to all Contractors participating in the Dialogue with the invitation to tender. The Purchaser reserves that may be before the invitation to tender change subject to the requirements of Intercultural Dialogue. Equivalence: 1) indicated in the order specification trademarks, standards, patents and origin are justified by the nature of the contract and are intended to identify only the quality and performance of the absence of other sufficiently precise terms that would allow describe the subject of the order clearly and exhaustive. Therefore, the Employer allows the use of materials and equivalent devices - ie. About technical parameters and quality not worse than those specified in the order specification - for materials and equipment for which the origin is determined by the Employer herein manufacturer's name; 2) The purchaser all names, trademarks, patents or origin indicated in the description of the order appends the words "or equivalent".

Architectural, construction, engineering and inspection services

Szpital Specjalistyczny im. F. Ceynowy Sp. z o.o. | Published May 16, 2015
Winner
Zespół Projektowo-Inwestycyjny Kontrapunkt V-projekt Aleksander Mirek
cpvs
71000000, 71220000, 71221000, 71320000, 71325000, 71327000, 79932000

In Wejherowie COMPLEX WITH HIS EQUIPMENT (hereinafter: Investment) and other necessary steps, in accordance with the provisions of the Draft Agreement (Annex 8 to the SETC). 907, as amended. d.) the terms of the Project Agreement (Annex 8 to the SETC), guidelines and agreed with the Employer, with due diligence and using the principles of modern technical knowledge. The scope includes the execution of documentation in particular the following items: Inventory essential for the proper implementation nn order, in particular wielobranżowa areas necessary for the proper preparation of documentation, including the buildings or parts of buildings for which will be necessary to carry out the construction work for the realization of investment: in particular: 3.1 .1. building transformer stations and power generators, 3.1.2. warehouse building medico-technical gases and warm-medical oxygen, 3.1.3. part of the building with the rooms warm-nitrous oxide, medical and technical compressor, vacuum pumps, along with ways of bringing the installation to a newly designed building, 3.1.4. communication switches of the existing lift shafts, 3.1.5. part of the building in bed, between the newly designed elevators and Block Operations, 3.1.6. part of the building between the bloc Operational sexual and analytical laboratory and hospital pharmacy for the needs that were designed pneumatic mail system, 3.1.7. power distribution facilities and network with routes to the proposed operating block, 3.1.8. hospital boiler room, 3.1.9. dendrological inventory, 3.1.10 other buildings and facilities necessary for the proper execution of the contract.

Construction of sports and recreation complex in anger.

 | Published October 17, 2014  -  Deadline November 3, 2014
cpvs
45212140, 45100000, 45112720, 45111291, 45223300, 45316100

1 The contract is for the construction of sports and recreation complex in anger including m.in .: 1) Parking, 2) multi-purpose field with a fence and lighting, 3) tracks, 4) green 5) elements of small architecture. 2 The object of the contract includes the following range: 1) the performance of the cured entry into the plot with parking for 4 berths with permeable gravel surface, square hardened solid waste, 2) the performance of the multi-field measuring 15x28,4 m with accessories, for poured synthetic surface on permeable foundation with drainage, 4m, 6 cm, 5) mounting a bench, a trash can and three bicycle racks, 6) performance of the lighting field, 7) reconstruction of part of the existing playground fence, 8) alignment of land and sow seed grass. 3 Description of the order specifies the design documentation and technical specifications, performance and acceptance of works annexed hereto 9. 4 The Employer to all the names, trademarks, patents, or origin indicated in the project documentation, technical specifications, writes a word or equivalent. 5 The Purchaser allows for the inclusion in the offer, and then apply the equivalent solutions involving the use of alternative materials and equipment than those specified in the design documentation and tender documents. Complex w / the documents will be assessed by the Employer. IF CONTRACTOR fails to submit the OFFER DOCUMENTS OF THIS CHAPTER 3. The costs of any inspection of the construction site borne by the Contractor. 7 The contract is implemented with the financial resources of the European Agricultural Fund for Rural Development.

Reloaded intake and treatment station in m. Mountain.

 | Published November 12, 2014  -  Deadline November 27, 2014
cpvs
45000000, 45453000, 45231000

1. The contract is for modernization and reactivation of the water treatment plant in the town of Mountain, covering the following industries: 1) architecture, including the following scope: a) new roofing and roof insulation, b) thermal insulation of walls, c) the replacement of windows and doors, d) renovation of the interior - walls, ceiling and floor, e) curing the part of the plot at the access road to the well and the performance of the pavement providing access to the building, f) remodeling entry, g) fence; 2) electricity, including the following scope: a) a supply, main switchboard, b) a supply of reserves, c) the installation of lighting and sockets, d) overvoltage protection, e) lightning protection, f) Instrumentation and automatic control systems; 3) sanitary, containing the following range: a) the selection and replacement of submersible pumps, b) exchange enclosures wells, c) the installation of aeration of raw water, d) pressure filtration system, e) backwash water drainage system, f) the installation of disinfection of water, g ) installation of compressed air for aeration of water and rinse the filter, h) outdoor installations (pipelines raw water and treated water, pipelines washings), and) the installation of clean water, j) the installation of ventilation, k) heating system. 2. Object of the contract must be in accordance with the following documents annexed hereto 8: 23/1 and 24 in the Top, 23/1 and 24 in the Top, 23/1 and 24 in the Top 4) technical specification of execution and delivery of the works - General requirements, 5) technical specification of the performance and acceptance of work - detailed specification of the electrical construction industry, 6) technical specification of the performance and acceptance of work - detailed specification of sanitary works, 7) technical specification of the performance and acceptance of work - detailed specification of the construction works,
  • 1