Polskie Górnictwo Naftowe i Gazownictwo SA | Published November 29, 2016  -  Deadline December 15, 2016

The aim of the competition is to obtain the best in terms of architectural, functional - utility, aesthetic and operational concept of urban and architectural office complex in Warsaw, taking into account the context and the best proposals for space development through a comprehensive and consistent approach design. The author of the competition and the winning destination will be invited to negotiate under single-source procurement, which will be the subject of detailed study of the selected competition work, consisting in the execution of the project documentation. Developing the concept of urban architecture will form the basis for the development of complete design documentation and materials needed to prepare and carry out the procedure for the award of a public contract for the project involving the construction of an office complex in Warsaw. The estimated size of the complex is about 29 000 m2 of office space.

Architectural design services

Zamawiającymi wspólnie przeprowadzającymi Konkurs są Metro Warszawskie Sp. z o.o., z siedzibą w Warszawie, ul. Wilczy Dół 5 oraz Miasto Stołeczne Warszawa, pl. Bankowy 3/5, 00-950 Warszawa, w imieniu i na rzecz którego działa Zarząd Transport Miejskiego, z siedzibą w: 00-848 Warszawa, ul. Żelazna 61. Zamawiającym wyznaczonym i upoważnionym do przeprowadzenia Konkursu w imieniu i na rzecz w/w Zamawiających jest Metro Warszawskie Sp. z o.o. | Published November 2, 2016  -  Deadline December 21, 2016
Competition No. EH / 226 / Konk / 01/2016 in the implementation of the Concept of Architecture and Construction of the third phase of the western section of the second metro line with stops Station Technology (STP) Mory in Warsaw.

Warsaw: Conducting computer training for employees of organizational statistics. CIS-WAG.271.6.2016

Centrum Informatyki Statystycznej | Published July 25, 2016  -  Deadline December 9, 2016
Filed under schedule and place of training are specified in the framework of training programs set out in Chapter II of the Terms of Reference and in the Form price - timelines training attached as Annex 6 to the Offer Form. The contract includes the following parts: Part I: Software MS Office, use and administration of MS SQL Server developer tools. Part II: statistical analysis software - SPSS Part III: Software for data analysis - SAS. Part IV: training tools Enterprise Architect Training, which will be conducted in groups of 15 or 20 cars have been identified (marked) in the Form price - timelines training attached as Annex 6 to the Offer Form. Planty 39/45. The Employer has a base housing portion, including training rooms with presentation equipment (projectors, screens, whiteboards) and the computer network necessary for the implementation of the training, which is the infrastructure for the duration of the contract, provide the Contractor. The Employer also has computer equipment, which at the time of performance of the contract, the Contractor may provide. If according to the assessment of the Contractor, the parameters provided by the Employer of equipment will be insufficient, or if obstacles License (the software can only be installed on dedicated hardware Contractor), training will be carried out on the equipment, which the place of performance of the contract, together with the installed and configured the software will provide the Contractor .

Architectural, construction, engineering and inspection services

Polskie Koleje Państwowe S.A. | Published November 9, 2016  -  Deadline December 16, 2016
The scope of documentation pre-design, design and about design and services covered by the contract shall include the following:

Architectural services for buildings

12 Terenowy Oddział Lotniskowy w Warszawie | Published October 28, 2016  -  Deadline December 5, 2016
The contract is for the execution of geological ground with the development of geological documentation and development Investment Programme and the development of design-budget documentation within the task Modernization of the airport composition of MPS at the airport Deblin, including in terms of:

Architectural, engineering and planning services

PKP Polskie Linie Kolejowe S.A. | Published November 19, 2016  -  Deadline January 3, 2017

Execution of the following elements:

- Doc. design and get her all the required opinions, agreements, approvals, conditions, decisions and permits,

- Preparation of tender documents necessary for the selection of the contractor works with the investor's cost estimate and bill of quantities,

- The exercise of the author's supervision during all construction works within the scope of the order on the basis of documentation prepared by the Contractor.

Development of design documentation and author's supervision 14 pcs. Of engineering objects on the trail Idzikowice - Opoczno South. within the project "Modernization of the railway line No. 4 - Central Bus Station Phase II".

Architectural services for buildings

12 Terenowy Oddział Lotniskowy w Warszawie | Published November 22, 2016  -  Deadline January 3, 2017

The contract is to develop a complete design-budget documentation and author's supervision at the stage of execution of works under the project "Construction of archival office" in the military in 8602 Legionowo in the field including:

1) the development of the project:

a) construction of a new building in a location similar to that proposed in the concept of land-use military complex;

b) construction of maneuvering square with the access road and the elements of the land;

c) the construction of power connections, telecommunications, sanitation and which by connection to an existing network as well as performed in the complex installation of heat recovery;

d) the construction of alarm systems with connections;

2) to respond to questions concerning the present technical documentation at the stage of the tender procedure for the selection of the works;

3) supervision of copyright.

The contract is to develop a complete design-budget documentation and author's supervision at the stage of execution of works under the project "Construction of archival office" in the military in 8602 Legionowo in the field including:

1) the development of the project:

a) construction of a new building in a location similar to that proposed in the concept of land-use military complex;

b) construction of maneuvering square with the access road and the elements of the land;

c) the construction of power connections, telecommunications, sanitation and which by connection to an existing network cooraz performed in a complex system with heat recovery;

d) the construction of alarm systems with connections;

2) to respond to questions concerning the present technical documentation at the stage of the tender procedure for the selection of the works;

3) supervision in the field of copyright resulting from the material provisions of the Agreement.

Architectural, construction, engineering and inspection services

Polskie Koleje Państwowe S.A. | Published November 24, 2016  -  Deadline January 3, 2017

The contract is the development of design documentation, pre-design and okołoprojektowej for the project. "Construction of the railway station Bielsk Podlaski"

A detailed description of the contract is provided in Annex No. 2 hereto.

1 item 6 of the Public Procurement Law, within 3 years from the award of the main contract, the hitherto contractor of services.

The condition of the award / contract is the occurrence of the needs of the Purchaser, in particular as defined above, to negotiate the price with the contractor.

The contract is for the development of pre-design documentation, design and okołoprojektowej for the project titled "Construction of the railway station Bielsk Podlaski."

A detailed description of the contract is provided in Annex No. 2 hereto.

Responsibilities of the Contractor has been defined in detail in the model contract attached as Annex 3 hereto.

The scope of documentation pre-design, design and okołoprojektowej and services covered by the contract shall include the following:

a) Implementation of maps for design purposes including necessary in order to implement all the investment project, ie. the area covered by the scope of the investments specified by the Purchaser on the graphical attachment and within 100m of a specific annex on the border, and include parts of neighboring parcels to the extent necessary for the implementation of networks and connections in accordance with any terms of blocks.

b) Develop and services for green design

c) an inventory of the object station building Bielsk Podlaski for the execution of demolition project in all industries (including construction and installation of sanitation, HVAC, electrical, telecommunication, fire. etc.) and connections, network sections and outdoor installations on plots which are in the development, together with photographs and technical assessment of the range of connections;

d) Develop and services faunal and chipterologicznych

U. of 2012. Poz.463); together with the conditions of foundation building,

690, as amended. d.) The document is to include, among others, analysis of the recorded signal, together with conclusions and recommendations on the basis of which you can make a selection of anti-vibration mat (if necessary).

The contractor has a duty to obtain all the necessary opinions, administrative decisions and arrangements made for the projects.

Architectural, engineering and planning services

Operator Gazociągów Przesyłowych Gaz-System S.A. | Published November 25, 2016  -  Deadline January 4, 2017

The subject of procurement is to develop the design documentation in terms of a comprehensive overhaul of the pipeline DN500 Odolanów - Adams and deepen the foundation pipeline DN500 Poznan-Rogoźno, together with the exercise of the author's supervision. Object of the procurement was divided into two parts, referred to in Section II.1.6).

The contract is to develop the design documentation in terms of a comprehensive overhaul of the pipeline DN 500 Odolanów - Adams, together with the exercise of the author's supervision.

The contract is to develop the design documentation in terms of deepening the foundation of the pipeline DN 500 between Poznań-Rogoźno in the area Trojanowo together with the exercise of the author's supervision.

Warsaw: Development of interdisciplinary concepts of architectural and urban center local to Grunwald Square in the heart of Zoliborz with carrying out public consultations.

Miasto Stołeczne Warszawa Dzielnica Żoliborz | Published July 15, 2016  -  Deadline December 16, 2016
Development of interdisciplinary concepts of architectural and urban center local to Grunwald Square in the heart of Zoliborz with carrying out public consultations. (Estimated value of the basic contract: 107 048.78 zł. Net) is expected to provide supplementary contracts on the basis of art. 67 paragraph. 1, item 6 of the Act to 50% of the value of the basic contract.

Warsaw: Development of design documentation and tender in the framework of the investment task. Adaptation of the main building at ul. Old at the Centre for Support of Families Family Warsaw with land development and the author's supervision.

Miasto Stołeczne Warszawa - Stołeczny Zarząd Rozbudowy Miasta | Published July 15, 2016  -  Deadline December 15, 2017
Old at the Centre for Support of Families Family Warsaw with land development and the author's supervision. a) Characteristics of the facility. It is made in the traditional technology of masonry walls, a flat roof is not ventilated. Change of use will expand operations CWR Family Warsaw on new actions on behalf of children and their families. It is located in the urban New Town entered in the register of monuments under the number A-1196. b) The characteristic technical parameters of the existing building: 1) Built-up area of ​​the building - 181.93 m 2; 2) The floor area of ​​the building - 516 m2. c) Description of the material scope of works: 1) stabilization of foundations, assessment and repair of structural elements, protection of the escarpment; 2) Execution of thermo - the exterior walls, roof, replacement of windows and doors; 3) Reconstruction of the building (pom. Administrative - office, pom. Studio, rooms for social workers, utility room in the basement), etc .; 4) Interior design, compilation of a first equipment; 5) Reconstruction and installation of sanitary (which, water. - Can., Mechanical ventilation, air conditioning, fire protection.); 6) Reconstruction and electrical installations; 7) Execution of telecommunication installations (CCTV, LAN, SSWiN, intercom systems, fire.); Old, making new external stairs and sidewalks, green. The scope of the contract includes in particular: 1) the execution of all necessary starting materials for the design, including: a) updated maps for design purposes, b) execution of an inventory of the existing facility, together with an assessment of the technical condition with particular emphasis on the design and an indication of the elements necessary to replace or reconstruction in terms of: - architectural and construction elements design - 3 copies. - plumbing - 3 copies. - electrical and telecommunication installations - 3 copies. - land management with inventory greenery - 3 copies. c) to document the geotechnical and research geological terrain entire investment - 3 copies. d) development expertise the design - 3 copies. 2) Implementation of the project of building a multi-branch with all the necessary arrangements in 6 copies., comprising: a) land development plan includes, among others, design of green economy and green existing sidewalks, exterior stairs, b) architectural and building thermo-modernization and reconstruction of containing the energy performance of the building together with the certificate of energy performance for the building and geological documentation, c) installation projects - sanitary, electrical, telecommunication, d) information on BIOZ, e) developing expertise fire. agreed with the appropriate Commander PSP. 3) Execution of projects implementing works - in 6 copies. A) architecture with a scenario of fire, b) Architecture - Interior together with the statement and equipment c) architecture interior design with a book room, d) design, including design protection embankment and building before settling.

Warsaw: Repair of street Czorsztyńskie in Warsaw in the formula design and build (Case No. 58 / ZP / 16)

Miasto Stołeczne Warszawa | Published July 27, 2016  -  Deadline December 15, 2016
1) The contract is performance based developed by the contractor project documentation of construction works consisting in the repair ul. Czorsztyn along with the implementation of works zieleniarskich. 2) Object of the contract includes: a) the execution, on the basis of the functional program constituting Annex no. 1 to the agreement, the project documentation with the required arrangements necessary for the application works in the Department of Architecture and Construction for the District Wola, do not require a building permit; b) the execution of works and works zieleniarskich according to prepared by the Contractor project documentation, approved by the Employer; c) author's supervision over the implementation of works made by design projects. 4) According to § 3 para. 2 model contract, the Contractor is obliged to have insurance liability for payment of the sum insured for not less than 600,000.00 zł throughout the duration of the contract, which will include its contractual liability and tort. 5) A detailed description of the subject and the scope and requirements for the implementation and acceptance of the order shall specify: a) the model contract - constituting the enclosure 4 to SIWZ, b) The functional utility - constituting Appendix 1 to the standard contract. 6) Before drawing up the offer, the Contractor should take a look at the a / documents, the place of future construction works and the provisions of Part X of the Terms of Reference. 7) Required term of the contract. Order should be implemented within the period from the day of signing the contract until 15.12.2016 r., With the proviso that: - the design concept should be performed and submitted within 14 days from the date of signing the contract; - The design documentation should be performed and submitted within 1 month of the approval of the design concept.