Call +44 800 9755 164

Public tenders for architect, architecture in Warsaw Poland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural design services

Towarzystwo Budownictwa Społecznego Warszawa Północ Sp. z o.o. | Published January 13, 2017  -  Deadline February 16, 2017

The contract is for the development of project documentation for the planned investments involving the construction of multifamily residential building with an underground garage located at ul. Radzymińska in Warsaw.

Object of the contract also includes supervision of copyright by the Contractor, which will be implemented as needed, until the end of the investment, updating collective statement of costs, after conducted tender for the construction works. The contractor will be required to the current cooperation at the stage of the tender procedure for construction works in immediate explanation and answer inquiries contractors regarding technical solutions contained in the design and estimate documentation, as well as to provide possible assistance in the evaluation of tenders. A detailed description of the Contract and conditions of execution can be found in Chapter 4 and 5 of the Terms of Reference.

Phase I Feasibility Study and concept of spatial software for the project: "Construction of residential and service of underground garage at ul. Radzymińska and parking ground and technical infrastructure in Warsaw "presenting the possibility of building the property

Phase II includes construction projects together with obtaining a building permit

Phase III includes the execution of projects implementing

Stage IV - includes supervision.

Architectural design services

Stołeczny Zarząd Infrastruktury | Published January 14, 2017  -  Deadline February 24, 2017

The contract is for the execution of the investment program and project-estimate documentation together with a description of the contract and obtaining the necessary arrangements and administrative decisions, as well as the author's supervision for the task: Construction of building for the needs of Archive MON Street. Radio 2 in Warsaw.

The contract is for the execution of the investment program and project-estimate documentation together with a description of the contract and obtaining the necessary arrangements and administrative decisions, as well as the author's supervision for the task: Construction of building for the needs of Archive MON Street. Radio 2 in Warsaw.

Characteristics of the facility:

The planned investment is located in the military on the land is a closed area, marked as plot No. 1/10 precinct

6-08-10 in Warsaw, settled in the land register KW No. WA1M / 00520925 fifths, owned by the State Treasury in the permanent management of the Capital of the Board of Infrastructure in Warsaw, area military complex (including objects) is not entered in the register of monuments and it is not conservation.

The job done in three stages:

Stage I - Implementation of the investment program

Phase II - Implementation of project-estimate documentation

Stage III - the author's supervision - from the start to the completion of the works

A detailed description of the contract is contained in the Terms of Reference.

Architectural design services

Stołeczny Zarząd Infrastruktury | Published January 19, 2017  -  Deadline February 24, 2017

The contract is for the execution of the investment program and project-estimate documentation together with a description of the contract and obtaining the necessary arrangements and administrative decisions, as well as the author's supervision for the task: Construction of building for the needs of Archive MON Street. Radio 2 in Warsaw.

Architectural, engineering and surveying services

Generalna Dyrekcja Dróg Krajowych i Autostrad Prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Poznaniu | Published December 21, 2016  -  Deadline February 1, 2017

The contract is for marking witness "PD" borders lane sections of national roads No. 12, 12g, 24 and 32 administered by GDDKiA Branch in Poznan in separate parts:

Part I - including DK 12 from km 154 + 076 to km 163 + 571 and from km 170 + 569 to km 200 + 731 - Leszno Region;

Part II - including DK 12 from km 200 + 731 to km 213 + 479 and from km 220 + 069 to km 238 + 918 and DK 12g from km 0 + 000 to km 5 + 067 - Region Wednesday Wielkopolski.

Part III - including DK 24 from km 0 + 000 to km 30 + 271 and DK 32 from km 89 + 945 to km 155 + 608 - New Tomyśl Region.

The subject of this contract are the requirements for the implementation and acceptance of works associated with the stabilization of witnesses "PD" borders lane road with the resumption, in special cases, the determination of border points lane.

The present terms of reference are the requirements for the implementation and acceptance of works associated with the stabilization of witnesses "PD" borders lane road with the resumption, in special cases, the determination of border points lane.

Architectural, engineering and planning services

PKP Polskie Linie Kolejowe S.A. | Published December 21, 2016  -  Deadline January 31, 2017

The development of pre-design documentation for the project entitled. "Work on the railway line No. 208 section Grudziadz-Tuchola-border of the province" and "Revitalization of the railway line No. 208 and section 33 Grudziadz - Brodnica"

Scope of the pre-design documentation:

Phase I - The definition of project objectives, market potential and possible investment options,

Phase II - Selection variant of the investment,

Phase III-Preparation of documentation for the next stages of the investment.

The detailed scope of activities of the Contractor is presented in the Description of the Contract (OPZ).

Scope of the implementation:

1.Zakres kind of documentation of pre

Phase I - The definition of project objectives, market potential and possible investment options

Stage I - Methodology of the contract.

Stage II - forecasts of socio-economic and market analysis of transport services.

Stage III - Analysis of the existing rail infrastructure and rolling stock.

Stage IV - Marketing Analysis and motor variants and investment

Summary of Phase I.

Phase II - Selection variant of the investment

Stage V - Technical Analysis of all variants of the investment project, together with the estimated costs.

Stage VI - environmental analysis.

Phase VII - Analysis of costs and benefits and Summary of Phase II.

Implementation of these steps is optional and depends on the results of the Feasibility Study and the Employer's decision.

Phase III - Preparation of documentation the next stages of the investment

Phase VIII - Environmental Documentation.

Phase VIII a - A decision on the environmental conditions,

Phase VIII b - Provisions of the (lack of) the need for environmental impact assessment

Phase VIII c - The decision on the environmental conditions without the need for an environmental impact assessment

Phase IX - Preparation of documentation for the subsequent stages of pro ...

Architectural, construction, engineering and inspection services

Zakład Ubezpieczeń Społecznych III Oddział w Warszawie | Published January 3, 2017  -  Deadline February 7, 2017

The contract is to act as Substitute Investor for the implementation of the investment project "Modernization of the building" Leipzig "Warszawa, ul. Czerniakowska 16.

Architectural, engineering and surveying services

Generalna Dyrekcja Dróg Krajowych i Autostrad Prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Poznaniu | Published December 28, 2016  -  Deadline February 7, 2017

The contract is for marking witness "PD" borders lane sections of national roads No. 12, 12g, 24 and 32 administered by GDDKiA Branch in Poznan in separate parts:

Part I - including DK 12 from km 154 + 076 to km 163 + 571 and from km 170 + 569 to km 200 + 731 - Leszno Region;

Part II - including DK 12 from km 200 + 731 to km 213 + 479 and from km 220 + 069 to km 238 + 918 and DK 12g from km 0 + 000 to km 5 + 067 - Region Wednesday Wielkopolski.

Part III - including DK 24 from km 0 + 000 to km 30 + 271 and DK 32 from km 89 + 945 to km 155 + 608 - New Tomyśl Region.

Architectural, construction, engineering and inspection services

Narodowy Bank Polski | Published January 7, 2017

Execution of design-budget documentation for construction of the power department Regional Branch in Warsaw.

Architectural, construction, engineering and inspection services

Zakład Gospodarowania Nieruchomościami w Dzielnicy Praga – Południe m.st. Warszawy | Published January 6, 2017
The project renovation of the building with replacement of electrical wiring in buildings: Deaf 3A, Minsk 24, 26, 28,32 / 36.

Architectural, construction, engineering and inspection services

Zakład Gospodarowania Nieruchomościami w Dzielnicy Praga – Południe m.st. Warszawy | Published January 5, 2017
A concept, and multi-branch design-budget documentation of obtaining a permit for the reconstruction of the buildings administered by zgn in Praga-South m. St. Warszawa: buildings Street. 24 fish, 28 fish, 19 Wawerska.

Architectural, construction, engineering and inspection services

Zakład Gospodarowania Nieruchomościami w Dzielnicy Praga – Południe m.st. Warszawy | Published January 6, 2017
A concept, and multi-branch design-budget documentation of obtaining a permit for the reconstruction of the buildings administered by zgn in Praga-South m. St. Warszawa for the building at ul. Lublin 30/32.

Warsaw: Development of design documentation and tender in the framework of the investment task. Adaptation of the main building at ul. Old at the Centre for Support of Families Family Warsaw with land development and the author's supervision.

Miasto Stołeczne Warszawa - Stołeczny Zarząd Rozbudowy Miasta | Published July 15, 2016  -  Deadline December 15, 2017
Old at the Centre for Support of Families Family Warsaw with land development and the author's supervision. a) Characteristics of the facility. It is made in the traditional technology of masonry walls, a flat roof is not ventilated. Change of use will expand operations CWR Family Warsaw on new actions on behalf of children and their families. It is located in the urban New Town entered in the register of monuments under the number A-1196. b) The characteristic technical parameters of the existing building: 1) Built-up area of ​​the building - 181.93 m 2; 2) The floor area of ​​the building - 516 m2. c) Description of the material scope of works: 1) stabilization of foundations, assessment and repair of structural elements, protection of the escarpment; 2) Execution of thermo - the exterior walls, roof, replacement of windows and doors; 3) Reconstruction of the building (pom. Administrative - office, pom. Studio, rooms for social workers, utility room in the basement), etc .; 4) Interior design, compilation of a first equipment; 5) Reconstruction and installation of sanitary (which, water. - Can., Mechanical ventilation, air conditioning, fire protection.); 6) Reconstruction and electrical installations; 7) Execution of telecommunication installations (CCTV, LAN, SSWiN, intercom systems, fire.); Old, making new external stairs and sidewalks, green. The scope of the contract includes in particular: 1) the execution of all necessary starting materials for the design, including: a) updated maps for design purposes, b) execution of an inventory of the existing facility, together with an assessment of the technical condition with particular emphasis on the design and an indication of the elements necessary to replace or reconstruction in terms of: - architectural and construction elements design - 3 copies. - plumbing - 3 copies. - electrical and telecommunication installations - 3 copies. - land management with inventory greenery - 3 copies. c) to document the geotechnical and research geological terrain entire investment - 3 copies. d) development expertise the design - 3 copies. 2) Implementation of the project of building a multi-branch with all the necessary arrangements in 6 copies., comprising: a) land development plan includes, among others, design of green economy and green existing sidewalks, exterior stairs, b) architectural and building thermo-modernization and reconstruction of containing the energy performance of the building together with the certificate of energy performance for the building and geological documentation, c) installation projects - sanitary, electrical, telecommunication, d) information on BIOZ, e) developing expertise fire. agreed with the appropriate Commander PSP. 3) Execution of projects implementing works - in 6 copies. A) architecture with a scenario of fire, b) Architecture - Interior together with the statement and equipment c) architecture interior design with a book room, d) design, including design protection embankment and building before settling.

Specialty design services

Ministerstwo Obrony Narodowej | Published December 24, 2016  -  Deadline January 30, 2017
Independence 218 to the applicable requirements of the fire. ". 

Current fire switch "with the author's supervision on a per call.

The contract also includes:

1) development of the design and cost estimate in branches other than the updated documentation (eg. Electricity, general building, construction) required for proper realization planned within renovation solutions

2) design solutions for fire partitions existing and newly designed in the so-called. system "open door" (door fittings in devices for the automatic closure)

3) the ability to analyze the requirements of the external fire roads and in case of non-compliance with the provisions of the design solutions.

4) obtaining the necessary permits, agreements, opinions, decisions, opinions, recommendations etc. to the extent necessary for the proper execution of the contract

If the developed documentation is not clear obligation specified in the construction law to apply to the competent authority of the architecture and construction administration for a permit for construction works and the obligation to notify arises

30 Law Building, the Contractor is obliged to provide the Purchaser a certificate of niewniesieniu opposition under the a / of the Act to w / the application with the competent authority of architectural and building administration,

6) providing the Purchaser answers to questions (within 48 hours) associated with the developed design and cost estimate documentation on the stage of the tender procedure by the Employer to select a contractor for the construction works and during their implementation.

Arrival at the author's supervision (designer) in place of works up to 48 hours of notification of the designer.

Mayor of the City of Warsaw dated 24.7.2012.

The contractor must divide the subject of a n / in stages:

a) Stage I - execution of project-estimate documentation,

if

with developed not clear from the obligation specified in the Law Building of the competent authority of the architecture and construction administration for a permit for construction works and the obligation to notify arises

30 of the Building Act, the Contractor is obliged to provide the Purchaser a certificate of niewniesieniu objections arising

a / of the Act to w / the application with the competent authority of architectural and building administration;

c) Stage III - the provision of the author's supervision.

Architectural, construction, engineering and inspection services

Zakład Gospodarowania Nieruchomościami w Dzielnicy Praga – Południe m.st. Warszawy | Published January 6, 2017
A concept, and multi-branch design-budget documentation of obtaining a permit for the reconstruction of the buildings administered by zgn in Praga-South m. St. Warszawa: Part 1 for buildings on ul. Grochowska 354, Drewnicka 2A; Part 2 buildings at ul. 8 Fish, Fish 10, Minsk 30;

Software package and information systems

Polska Spółka Gazownictwa Sp. z o.o. | Published January 3, 2017  -  Deadline January 30, 2017

The contract involves the supply, implementation and maintenance service of the SCADA system in the Polish Gas Company Sp. z oo

Object of the proceedings includes the supply, design, construction and commissioning of SCADA system, which is to cover the gas network throughout the territory of the Republic of Poland, subject to locate the server in two locations. The order also includes service maintenance system for a period of 5 years. After implementing the system, the Contractor will conduct training of administrators and users.

In particular the object of the contract includes:

1. Delivery of the software in the latest stable version, including licenses for backup systems and testing.

2. Implementation and commissioning of interfaces to systems cooperating.

3. Execution of the Project Implementation and concept system based on the requirements of the Employer.

4. The construction, implementation and implementation of the Scheme in accordance with the requirements of the Employer, based on an assumed architecture System.

5. Provide as-built documentation and manual system.

6. Conducting the tests and verification of the system in locations Employer.

7. Conducting training.

8. Maintenance System for a period of 5 years from the moment of signing the final acceptance of the System.

Implementation time can not be shorter than 26 months nor more than 36 months.

Construction work

PKP Polskie Linie Kolejowe S.A. | Published December 30, 2016  -  Deadline February 10, 2017

The whole subject of the Order includes the execution of the following elements:

1) Documentation of the project, including:

a) construction project with the author's supervision,

b) obtaining a building permit and other necessary administrative decisions,

c) prepare a draft executive

d) the development of as-built documentation, including the geodesic as-built documentation.

e) completion of the evaluation process of the subsystems and the transfer of the corresponding declarations and certificates for the EC subsystems.

2) Implementation of works in the ranges:

a) surface and the track bed,

b) railway traffic control devices (SRK)

c) equipment and telecommunication systems,

d) contact system with power supply,

e) equipment and electrical power systems up to 1 kV,

f) civil engineering works

g) platforms and cubature objects,

h) the transition and crossings,

i) geology.

3) Implementation of works involving the construction of facilities for environmental protection.

The whole object of the contract includes the construction:

1) Documentation of design necessary for the proper performance of all works and get her all the required opinions, agreements, approvals, conditions, decisions and permits necessary for the implementation of the contract;

2) All the works in accordance with the scope of the order on the basis developed by the Contractor and approved by the Employer project documentation referred to in paragraph 1, and all the preparatory work necessary to comply with the scope of the Agreement and any action required by the law;

3) Assess the compliance of each structural subsystem covered by the scope of the order at any stage (design, construction and final testing of the subsystem).

The contract includes the design and construction fields: industry track, engineering structures, travel, roads and squares cargo, enclosed structures, objects, service stations and small architecture, electric power, railway traffic control, telecommunications systems and data transmission systems.

Purchaser pays particular attention to that whole subject of the Contract shall be made in accordance with the Technical Standards.

The overall objective of the contract is to improve the safety of rail traffic, travelers, transported cargo and traffic within the crossings.

The solutions will meet the requirements of both the "Directive 2008/57 / EC of the European Parliament and of the Council of 17.6.2008. On the interoperability of the Community rail system and the regulations and decisions of the European Commission" and the national provisions applicable standards and internal regulations of PKP PLK SA

Stages of the contract will be: preparing a multi-branch project documentation and obtaining on the basis of all required approvals and decisions, execution of works, obtaining the required certificates.

Laboratory reagents

Samodzielny Publiczny Dziecięcy Szpital Kliniczny w Warszawie | Published January 12, 2017  -  Deadline February 15, 2017
The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw divided into 14 packages. 

This code Common Procurement Vocabulary CPV:

33696500-0 Laboratory reagents

33793000-5 Laboratory glassware

38000000-5 Laboratory, optical and precision equipments (excl)

30197630-1 Paper for printing

33192500-7 Tubes

42513200-7 Refrigeration

42931100-2 Laboratory centrifuges and accessories

39711110-3 refrigerators-freezers

1, 2A and 2B, 8, 9, 10, 11 and 13 to the tender documents.

1 point 7 of the PPA (hitherto Contractors basic contract) - in accordance with point 4 of the Terms of Reference.

The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw, where:

Package No. 1 - a supply of reagents, calibration materials and consumables to the camera GEM Premier 4000.

The detailed scope of the contract includes a description of the contract (OPZ) Key terms and pricing forms - which are respectively Attachments No. 1, 2A and 13 to the tender documents.

The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw, where:

Package No. 2 - a supply of reagents for urine analyzer - Clinitek Advantus Siemens Helathcare Diagnostics Sp. z oo

The detailed scope of the contract includes a description of the contract (OPZ) Key terms and pricing forms - which are respectively Attachments No. 1, 2A and 13 to the tender documents.

The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw, where:

Package No. 3 - a supply of reagents, control materials and consumables to the analyzer PFA-100 Siemens Helathcare Diagnostics Sp. z oo

The detailed scope of the contract includes a description of the contract (OPZ) Key terms and pricing forms - which are respectively Attachments No. 1, 2A and 13 to the tender documents.

The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw, where:

Package No. 4 - a supply of reagents, control materials and consumables for determination by HPLC HbA1c analyzer D-10's BIORAD

The detailed scope of the contract includes a description of the contract (OPZ) Key terms and pricing forms - which are respectively Attachments No. 1, 2A and 13 to the tender documents.

The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw, where:

Package No. 5 - a supply of reagents, control materials and consumables to the analyzer IQ 200 Elite

The detailed scope of the contract includes a description of the contract (OPZ) Key terms and pricing forms - which are respectively Attachments No. 1, 2A and 13 to the tender documents.

The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw, where:

Package No. 6 - the delivery of reagents to the flow cytometric assay with the use of the camera Coulter FC 500

The detailed scope of the contract includes a description of the contract (OPZ) Key terms and pricing forms - which are respectively Attachments No. 1, 2A and 13 to the tender documents.

The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw, where:

Package No. 7 - a supply of reagents, control materials and consumables to the analyzer Minicap

The detailed scope of the contract includes a description of the contract (OPZ) Key terms and pricing forms - which are respectively Attachments No. 1, 2A and 13 to the tender documents.

The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw, where:

Package No. 8 - a supply of reagents, consumables camera Previ Color Gram, bioMerieux

The detailed scope of the contract includes a description of the contract (OPZ) Key terms and pricing forms - which are respectively Attachments No. 1, 2A and 13 to the tender documents.

The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw, where:

Package No. 9 - a supply of reagent kit for the detection of antibodies ANA, ANCA, ASCA, dsDNA antibodies against the cup-shaped cells by indirect immunofluorescence - IFT

The detailed scope of the contract includes a description of the contract (OPZ) Key terms and pricing forms - which are respectively Attachments No. 1, 2A and 13 to the tender documents.

The contract is for the supply of reagents with the lease of the necessary equipment for SPDSK in Warsaw, where:

The package 10 - is the supply of a reagent kit for the detection of antibodies in celiac disease

The detailed scope of the contract includes a description of the contract (OPZ) Relevant Resolve
  • 1