Architectural design services

Gmina Miasto Szczecin – Biuro ds. Zamówień Publicznych Urzędu Miasta Szczecin | Published February 11, 2017
Winner
Dreamworlds Sp. z o.o. Sp. k.
cpvs
71220000

Water Park "Water Factory New Gontynka" in Szczecin - to develop multi-branch design-budget documentation necessary to obtain any required by law agreements and decisions, and author's supervision over the implementation of the investment.

Architectural services for buildings

Rejonowy Zarząd Infrastruktury w Szczecinie | Published March 7, 2017  -  Deadline April 24, 2017
cpvs
71221000, 71248000

1. The contract is a service based on the execution of the project documentation, together with a cost estimate and supervision of future copyright works carried out according to the project documentation prepared for the task of adapting the rooms in the house. 7, 28, 38, 53, 54 for the ACS in Szczecin.

1. The contract is a service based on the execution of the project documentation, together with a cost estimate and supervision of future copyright works carried out according to the project documentation prepared for the task of adapting the rooms in the house. 7, 28, 38, 53, 54 for the ACS in Szczecin.

2. Implementation of a contract involves access to classified information at the "reserved".

Accordingly, the contractor applying for the award of a contract pursuant to Art. 54 paragraph. 1 of the Act of 05.08.2010 r. On the protection of classified information (ie OJ 2016., Pos. 1167) are required to protect classified information.

3. Description of the contract has been defined in detail in Annex 3 to the Terms of Reference - A detailed description and scope of the contract.

Architectural design services

Wojewódzka Stacja Pogotowia Ratunkowego w Szczecinie | Published January 25, 2017  -  Deadline March 6, 2017
cpvs
71220000, 71221000, 71248000, 71244000, 71223000

The contract execution pełnobranżowej design-budget documentation for the investment project "Construction of the Regional Ambulance Service Street Twardowski in Szczecin"

Type of contract: service.

Location of investment: Plot No. 5/3 and 4/1 of the 2,090 precincts Szczecin.

Names and codes of the Common Procurement Vocabulary (CPV classification):

71220000-6 Architectural design services

71221000-3 Architectural services for buildings

71223000-7 Architectural services for building extensions

71244000-0 Calculation of costs, monitoring of costs

71248000-8 Supervision of project and documentation

A detailed description of the order is attached as Annex 6 to the ToR.

Architectural design services

Gmina Miasto Szczecin – Biuro ds. Zamówień Publicznych Urzędu Miasta Szczecin | Published December 16, 2016
Winner
Dreamworlds Sp. z o.o. Sp. k.
cpvs
71220000

Water Park "Water Factory New Gontynka" in Szczecin - to develop multi-branch design-budget documentation necessary to obtain any required by law agreements and decisions, and author's supervision over the implementation of the investment.

Advisory architectural services

Muzeum Narodowe w Szczecinie | Published December 31, 2016
Winner
Piotrem Płaskowickim prowadzącym działalność gospodarczą pod nazwą: Piotr Płaskowicki & Partnerzy Architekci
cpvs
71210000

The subject of the contract is the designer of project documentation necessary

for investments for the investment task. "Science Center" Street. Wendy 6 in Szczecin, obtaining all necessary approvals and permits and supervision over the implementation of proprietary investments. Project documentation should be based on the design concept which I prize in the open competition for the conceptual design of the object "Maritime Museum - Science Center"

Street in Szczecin. Wendy 6 and resolved on 21.04.2011 year, taking into account the recommendations of post-competition, notes the Purchaser and records of the Local Development Plan for the present investment. The scope of the agreement also includes the development of answers to questions of potential contractors on the subject of agreement at the stage of public procurement carried out in order to select a contractor for the works carried out on the basis of design documentation.

Architectural and related services

Zarząd Morskich Portów Szczecin i Świnoujście Spółka Akcyjna | Published December 8, 2016  -  Deadline December 29, 2016
cpvs
71200000, 71245000

Object of the contract includes the execution of project cost estimate and feasibility study for the project .: Adaptation of infrastructure Ferry Terminal in Swinoujscie to support intermodal transport.

Required by the Purchaser term of the contract:

- Preparation of project documentation and obtaining the construction permit - 11 months after signing the contract;

- Supervision will be exercised from the date of signature of this Agreement until the completion of all work / works included in the project documentation and obtaining the unconditional and legally valid use permit. According to the preliminary schedule of work: the expected date of commencement of the project - the end of August 2017 deadline for completion of works and special and to obtain an unconditional and legally valid use permit - the end of December 2019 year.

Architectural design services

Gmina Miasto Szczecin – Wydział Urbanistyki i Administracji Budowlanej Urzędu Miasta Szczecin | Published November 30, 2016
cpvs
71220000

The object of the contest was the performance and presentation by participants intended to implement, the concept of the architectural construction of the Water Park pn. Factory Water - New Gontynka in Szczecin along with land development and transfer of copyrights selected by the Jury of work - on the terms specified in the Regulations of the competition.

Architectural design services

Samodzielny Publiczny Szpital Kliniczny nr 2 PUM w Szczecinie | Published August 31, 2016
Winner
WK Architekci Sp. z o. o. Sp. K.
cpvs

1. The contract is for construction of a complete design-budget documentation of extension and reconstruction of the hospital, located Clinic of Gynecology and Gynecologic Oncology Adult and Girls, Clinic of Obstetrics and Gynecology and Neonatal Pathology Clinic of operating blocks (building A) with obtaining a building permit and author's supervision.

2. Description of the contract and the required parameters of the section II.

Szczecin: RENOVATION OF THE BUILDING OF THE FACULTY OF CONSTRUCTION AND ARCHITECTURE West Pomeranian University of Technology in Szczecin THE ZAD I - RENOVATION CORRIDOR IN ROOM 344 ​​ROOMS AND NO 332A, 332B, 332C, 332D, 332E, 312, 314 BUILDING AT AL.PIASTÓW then place the dowels 50 ZAD II - RENOVATION ROOM NO 124 BUILDING then place the dowels STREET. Żołnierska 50

Zachodniopomorski Uniwersytet Technologiczny w Szczecinie | Published August 18, 2016  -  Deadline July 26, 2016
Winner
MANILO Sp. z o.o. Sp. k., ul. Smolańska 4/205, 70-026 Szczecin, kraj/woj. zachodniopomorskie.
cpvs
45000000, 45450000, 45262522, 45410000, 45431200, 45421100, 45450000, 45442100, 45431100, 45310000, 45331000, 45400000, 45450000, 45421140, 45421153

The scope of the contract includes the construction work (bricklaying, plastering, painting, flooring works, installation of doors and transoms, suspended ceilings, reconstruction of the interior walls); sanitary industry (reconstruction of plumbing and what, reconstruction of mechanical ventilation), electrical industry (installing electrical switchgear, electrical repairs with equipment lighting, testing and electrical measurements, installation of sound and screens); industry teletechnicznej- associated with the reconstruction of interior walls seat, the platform and the cathedral.

Architectural services for buildings

Szczecińskie Towarzystwo Budownictwa Społecznego Spółka z o.o. | Published August 18, 2016
cpvs

The competition is to develop the concept of urban - architectural revitalization of the downtown area covering the first quarter marked number 36 limited the Polish Army Avenue and the streets of the Heroes of the Warsaw Ghetto, Bl. Cr. Jadwiga, Malkowski and Ks. Boguslaw X in Szczecin.

Architectural and related services

Zarząd Morskich Portów Szczecin i Świnoujście Spółka Akcyjna | Published November 16, 2016  -  Deadline December 29, 2016
cpvs
71200000, 71245000

Object of the contract includes the execution of project cost estimate and feasibility study for the project .: Adaptation of infrastructure Ferry Terminal in Swinoujscie to support intermodal transport.

Required by the Purchaser term of the contract:

- Preparation of project documentation and obtaining the construction permit - 11 months after signing the contract;

According to the preliminary schedule of work: the expected date of commencement of the project - the end of August 2017 deadline for completion of works and special and to obtain an unconditional and legally valid use permit - the end of December 2019 year.

Object of the contract includes the execution of project cost estimate and feasibility study for the project .: Adaptation of infrastructure Ferry Terminal in Swinoujscie to support intermodal transport.

Furthermore, object of the contract includes the construction:

a) maps for design purposes,

b) documentation of the hydrological and geological - engineering for part of the investment located in the internal waters strait Świna

c) in the case of change of location supports the proposed flyover w / the documentation shall be made for the land part,

d) updating the inventory of green with obtaining a decision on the removal of trees and shrubs,

e) the detailed technical specifications containing conditions for the implementation and acceptance of construction works for all industries and clearing the table of elements with the nomenclature and concepts recognized in the conditions of FIDIC contract - Red Book,

and

f) supervising the copyright in the implementation of construction and assembly works,

g) the acquisition on behalf of the Employer's decision on the construction permit.

The detailed scope of the contract specified in the Table Design Studies.

Ferry positions 5 and 6 and their facilities.

Szczecin: Execution of additional works beyond the fixed remuneration consisting of the execution of the work defined in the project repair industry: sanitary (ie. Mechanical ventilation and air conditioning, water and sewage installation of a hydrant, what and medical gases), the electrical, architectural, konstrukcyjnej- within the framework of the task Construction of 2A with elevated helipad on the roof of the building and connectors functionally connecting building buildings 2A 2B, 2F and 1A

Samodzielny Publiczny Specjalistyczny Zakład Opieki Zdrowotnej "ZDROJE" | Published October 28, 2016  -  Deadline September 2, 2016
Winner
BUDIMEX S.A., ul. Stawki 40, 01-040 Warszawa, kraj/woj. mazowieckie.
cpvs
45000000

The execution of works further beyond the fixed remuneration consisting of the execution of the work defined in the project repair industry: sanitary (ie. Mechanical ventilation and air conditioning, water and sewage installation hydrant, as well as medical gases), the electrical, architectural, construction - within Construction of the building task 2A elevated helipad on the roof of the building and connectors functionally connecting building buildings 2A 2B, 2F and 1A.

Architectural services for buildings

Muzeum Narodowe w Szczecinie | Published October 28, 2016  -  Deadline October 25, 2016
cpvs
71221000

The subject of the contract is the designer of project documentation necessary for the realization of investments for the investment task. "Science Center" Street. Wendy 6 in Szczecin, obtaining all necessary approvals and permits and supervision over the implementation of copyright inwestycji.Dokumentację project should be based on the design concept which I prize in the open competition for the conceptual design of the object "Maritime Museum - Science Center" Street in Szczecin. Wendy 6 and resolved on 21.4.2011, the post-competition with the recommendations, comments Employer and records of the Local Development Plan for the present investment.

Architectural design services

Szczecińskie Towarzystwo Budownictwa Społecznego Spółka z o.o. | Published November 2, 2016
Winner
DOMINO Grupa Architektoniczna Wojciech Dunej
cpvs
71220000, 71248000

Develop a final concept of urban - architectural and pełnobranżowej of project - estimate the revitalization of the area containing the downtown quarter marked number 36 limited avenue of the Polish Army and the streets of the Heroes of the Warsaw Ghetto, Bl. Queen Jadwiga, Malkowski, Ks. Boguslaw X in Szczecin as well as oversight of robots.

Szczecin: Construction of multifunctional court Street. Cracow, robber and Lviv in Szczecin, together with the construction of the exit of the street. Robber, sidewalks and construction of the necessary technical infrastructure

Gmina Miasto Szczecin | Published July 21, 2016  -  Deadline July 15, 2016
Winner
SOLID-STET Sp. z o.o. Sp. k., ul. Arkońska (stadion), 71-245 Szczecin, kraj/woj. zachodniopomorskie.
cpvs
45000000

The contract is for: a. Construction of multifunctional court with dehydration and equipment, b. Construction of the recreation part of the elements of small architecture, c. Construction of fencing off and the recreation part, d. Execution of area lighting, e. Execution of pavements Street. Robber, Krakow, Lviv, f. Construction exit at ul. Robber, g. Reconstruction of water supply system, power grid and ducts h. Felling of trees and shrubs and plantings according to the design documentation, and. Execution lawns.

Szczecin: Reconstruction of the park them. St. Nadratowskiego in Szczecin - Phase IV

 | Published July 11, 2016  -  Deadline July 27, 2016
cpvs
45100000, 45233253, 45112711, 45111291, 45262500, 77314100, 77310000

Nadratowskiego in Szczecin - stage IV. CPV: 45100000-8 Site preparation work 45233253-7 Surface work for footpaths 45112711-2 Landscaping work for parks 45111291-4 Construction work for land 45262500-6 Bricklaying and Masonry 77314100-5 Services in lawns 77310000 -6 planting and maintenance of green areas 2. the Contractor shall be obliged to execute the order described in Annexes 9 and 10 to the ToR and includes m. in .: 1) preparatory works and earthworks, 2) carrying the surface of the tile and concrete aggregate natural, 3) carrying the surface of natural aggregate, 4) the supply and installation of small architecture, 5) performance of the outdoor scenes, 6) replanting trees. 7) execution of lawns. 3. The Contractor shall be obliged - at his own expense and on their own - even m. In. to: 1) the organization of the site and the organization of social facilities, 2) marking the construction site in accordance with applicable regulations and maintain in proper condition temporary protection, 3) secure their own property in the works, 4) to ensure safe conditions for the execution of works, specific regulations p. fire protection. and safety and regulatory standards. environmental protection, 5) the supply of water and electricity, 6) clean up the area after the completion of the work, including the removal of damage caused during the work, 7) carrying the Official construction, 8) to perform as-built documentation with warranty cards, manuals, data sheets, invoices for the purchase of elements of small architekturyitp. in Polish - in 3 copies., the Contractor shall be obliged to carry out geodetic support tasks and perform as-built documentation geodetic accordance with the technical conditions for work of surveying - on the assumption database GESUT and BDOT 500 in the city of Szczecin in 2016 and conducting a portion of the digital state system geodetic and cartographic system GEO SIP-INFO 7). 4. The Contractor shall be obliged to perform the subject of the contract using their own materials, which provide the Employer attestations, certificates, declarations of conformity or suitability for use certificate. 5. The Employer agrees to: 1) provide a protocol Contractors construction site no later than 5 working days from the date of the contract, 2) make the acceptance of work performed, 3) ensure the payment of remuneration for the work performed. 6. Contractor shall perform the object of the contract with the utmost diligence required 21 amendments), as well as the Terms of Reference and the offer, which will form an integral part of the contract. 7. Subcontractors: 1) The Contractor may perform the object of the agreement with the participation of subcontractors or more subcontractors with them a relevant agreement in writing to be valid. In the case of a draft amendment of the articles above provisions shall apply accordingly. 3) The Contractor is obliged to submit certified the Purchaser If the Purchaser within 14 days from the date of receipt of the subcontract, or changes to subcontract raises an objection in writing, shall be deemed to have consented to an agreement or changes. 4) The contract for construction of the Subcontractor must include in particular: a) the scope of work entrusted to the Subcontractor along with part of the documentation relating to the performance of works covered by the agreement, b) the amount of remuneration, c) the date of execution of the works covered by the agreement, d) the date of payment of remuneration for the Subcontractor or further Contractors, provided for in the agreement on subcontracting, can not be longer than 30 days from the date of receipt of the Contractor by the Subcontractor or Subcontractor for further Subcontractor, invoice or bill, confirming the performance of subcontracted or downstream Subcontractors construction work, supplies or services, e) in the case subcontracting by the Contractor works under the subject contract subcontractors, the term remuneration paid by the Contractor for the work done by the subcontractor should be set in such a way that fell earlier than the date of payment of the remuneration due for the execution of these works to the Contractor by the Employer, f) Submission by a subcontractor to Contractor any kind of security deposit, etc. should take place in other forms than cash, g) the payment of invoices there shall be only for the works received by the Employer to the Contractor, upon confirmation by the Contractor material scope of the works performed by the subcontractor, h) any changes in the contract should take place in writing and) lack of consent to the assignment of receivables arising from the contract. 5) The Contractor, Subcontractor or Subcontractor further construction work is obliged to submit to the Employer, agreements certified as true copies of which are the subject of supplies or services within obligation does not apply to contracts

Szczecin: Development of the park Street. Niemierzyńska in Szczecin (Park Karpinski) - Phase II

Zakład Usług Komunalnych | Published July 18, 2016  -  Deadline October 15, 2016
cpvs
45000000, 43325000, 77310000

Niemierzyńska in Szczecin (Park Karpinski) - Phase II. 2. The Contractor shall be obliged to execute the order described in Annexes 9 and 10 to the Terms of Reference, including m. In .: 1) Phase I: a) construction of the lighting (by the three stages of the project: cabling, construction of the cabinet SUO, ZK-1, setting lighthouse, connecting, conducting measurements), b) the delivery and installation of small architectural elements (fence and playground equipment, benches, litter bins) 2) phase II - supply and planting of trees and shrubs. CPV: 45000000-7 43325000-7 Construction Equipment parks and playgrounds 77310000-6 Planting and maintenance of green areas 3. The Contractor shall be obliged - at his own expense and on their own - even m. In. to: 1) the organization of the site and the organization of social facilities, 2) marking the construction site in accordance with applicable regulations and maintain in proper condition temporary protection, 3) secure their own property in the works, 4) to ensure safe conditions for the execution of works, specific regulations p. fire protection. and safety and regulatory standards. environmental protection, 5) the supply of water and electricity, 6) clean up the area after the completion of the work, including the removal of damage caused during the work, 7) carrying the Official construction, 8) to perform as-built documentation with warranty cards, manuals, data sheets, invoices for the purchase of small architecture, etc.. in Polish - in 3 copies., the Contractor shall be obliged to carry out geodetic support tasks and perform as-built documentation geodetic accordance with the technical conditions for work of surveying - on the assumption database GESUT and BDOT 500 in the city of Szczecin in 2016 and conducting a portion of the digital system of the state geodetic and cartographic system GEO SIP-INFO 7). 4. The Contractor shall be obliged to perform the subject of the contract using their own materials, which provide the Employer attestations, certificates, declarations of conformity or suitability for use certificate. 5. The Employer agrees to: 1) provide a protocol Contractors construction site no later than 5 working days from the date of the contract, 2) make the acceptance of work performed, 3) ensure the payment of remuneration for the work performed. 6. Contractor shall perform the object of the contract with the utmost diligence required 21 amendments), as well as the Terms of Reference and the offer, which will form an integral part of the contract. 7. Subcontractors: 1) The Contractor may perform the object of the agreement with the participation of subcontractors or more subcontractors with them a relevant agreement in writing to be valid. In the case of a draft amendment of the articles above provisions shall apply accordingly. 3) The Contractor is obliged to submit certified the Purchaser If the Purchaser within 14 days from the date of receipt of the subcontract, or changes to subcontract raises an objection in writing, shall be deemed to have consented to an agreement or changes. 4) The contract for construction of the Subcontractor must include in particular: a) the scope of work entrusted to the Subcontractor along with part of the documentation relating to the performance of works covered by the agreement, b) the amount of remuneration, c) the date of execution of the works covered by the agreement, d) the date of payment of remuneration for the Subcontractor or further Contractors, provided for in the agreement on subcontracting, can not be longer than 30 days from the date of receipt of the Contractor by the Subcontractor or Subcontractor for further Subcontractor, invoice or bill, confirming the performance of subcontracted or downstream Subcontractors construction work, supplies or services, e) in the case subcontracting by the Contractor works under the subject contract subcontractors, the term remuneration paid by the Contractor for the work done by the subcontractor should be set in such a way that fell earlier than the date of payment of the remuneration due for the execution of these works to the Contractor by the Employer, f) Submission by a subcontractor to Contractor any kind of security deposit, etc. should take place in other forms than cash, g) the payment of invoices there shall be only for the works received by the Employer to the Contractor, upon confirmation by the Contractor material scope of the works performed by the subcontractor, h) any changes in the contract should take place in writing and) lack of consent to the assignment of receivables arising from the contract. 5) The Contractor, Subcontractor or Subcontractor further construction work is obliged to submit to the Employer, agreements certified as true copies of which are the subject of supplies or services within obligation does not apply to contracts with a value of less than 0.5 of the contract, including that the exclusion referred to above does not apply to contracts with a value greater than 50 000,00 zł

Architectural design services

Samodzielny Publiczny Szpital Kliniczny nr 2 PUM w Szczecinie | Published April 8, 2016  -  Deadline May 17, 2016
cpvs
71220000

1. The contract is for construction of a complete design-budget documentation of extension and reconstruction of the hospital, located Clinic of Gynecology and Gynecologic Oncology Adult and Girls, Clinic of Obstetrics and Gynecology and Neonatal Pathology Clinic of operating blocks (building A) with obtaining a building permit and author's supervision.

2. Description of the contract and the required parameters of the section II.

Architectural services for buildings

Szczecińskie Towarzystwo Budownictwa Społecznego Spółka z o.o. | Published April 30, 2016  -  Deadline May 9, 2016
cpvs
71221000

Architectural services for buildings

Architectural design services

Województwo Zachodniopomorskie – Urząd Marszałkowski Województwa Zachodniopomorskiego | Published April 20, 2016  -  Deadline May 17, 2016
cpvs
71220000, 71221000, 71223000, 71244000, 71248000

1. The contract is the choice of the contractor pełnobranżowej project documentation investments "Consolidation seat of the Office of the Marshal of the West Pomeranian Szczecin" and the author's supervision described