Design and implementation of exit from the street, hardening square fence around the teaching building of the Faculty of Horticulture and Landscape Architecture at the University of Life Sciences in Lublin, ul. Leszno 58, 58A in Lublin.

 | Published December 18, 2015  -  Deadline January 4, 2016
cpvs
71320000, 71220000, 45232451, 45233200, 45000000, 45213220, 45330000, 45311000

Leszczynski 58, 58A in Lublin, on the basis of functional and utilitarian constituting Appendix 1 hereto, in the framework of the contract include: 1) Make an inventory of the existing situation in the field of architecture, sanitation, power cables, telecommunication 2) Perform the required measurements and research needed to develop design solutions, 3) Follow the map for design purposes, 4) Implementation of the project documentation which includes: a) projects, building and implementing, 1129, as amended.), 5) Obtaining the required reviews, checks, agreements and approval project documentation required by the law, including agreements with the Purchaser, and others if they are required to submit works or obtain a building permit. 6) Getting by the Contractor on behalf of the Employer's final (legally binding) decision on the construction permit. 1409, as amended.), 8) Implementation Plan for Safety and Health. 9) The execution of works. 10) Drawing on behalf of the Employer, if necessary, the notice of completion of works and obtaining final (legally binding) decision to permit the use and other permits required under the laws necessary to carry out the works. 11) Develop an inventory of as-built surveying 12) Organising and carrying out the necessary partial acceptances and final acceptance

Architectural, construction, engineering and inspection services

Gmina Lublin | Published March 18, 2017  -  Deadline March 27, 2017
cpvs
71000000

The contract scope includes:

1. Stage I (concept):

1. obtaining the current map for design purposes,

2. to develop the necessary inventory of urban (scale 1: 1000);

architecture (scale 1: 200 or 1: 100), dendrological for design purposes and demolition,

3. develop two concepts (after 6 copies.)

4. agree on the concept of the customer.

Requirements for the concept:

1. Map for design purposes - the Contractor is required to obtain updated maps for design purposes (to a scale depending on the type of construction of the proposed facility for the area covered by the contract plus the statutory 30 m range, including areas adjacent to the border development).

2. The concept - a proposal geometry solutions, technical, technological, the basic infrastructure and accompanying allows to verify the vision of designer and her reference to the requirements of the Purchaser.

3. Develop the concept of two software-widening.

Architectural, construction, engineering and inspection services

Gmina Lublin | Published March 11, 2017  -  Deadline March 22, 2017
cpvs
71000000

The contract scope includes:

Stage I (concept):

1.1. obtaining current maps for design purposes,

1.2. develop the necessary inventory of urban (scale 1: 1000), architecture (scale 1: 200 or 1: 100), dendrological for design purposes and demolition,

1.3. develop two concepts (after 6 copies.)

1.4. agreeing on the concept of the customer.

Requirements for the concept:

Map for design purposes - the Contractor is required to obtain updated maps for design purposes (to a scale depending on the type of construction of the proposed facility for the area covered by the contract plus the statutory 30 m range, including areas adjacent to the border development).

The concept - a proposal geometry solutions, technical, technological, the basic infrastructure and accompanying allows to verify the vision of designer and her reference to the requirements of the Purchaser.

Krochmalna / Gas / Mill / Stadionowa, while the second is to include solutions targeted to the possible reconstruction of the roundabout to ensure proper communication service towards Wikia contributor to the LOF.

Stage II (Multi-documentation Design estimates).

Stage III (feasibility study):

- Feasibility study.

Requirements for the feasibility study:

1. A feasibility study should be drawn up in 3 copies.,

2. The feasibility study must be done for all the material scope of the project entitled .: "Integrated Communication Centre for Functional Lublin area."

The feasibility study should be developed in the generator applications available on the websites of the Marshal Office of Lublin and in hard copy.

Krochmalna / Diamond, for which a separate agreement is developed technical documentation.

It is the duty of the Contractor is also to make changes, corrections, additions feasibility study during the evaluation of the project by the Managing Authority for the signing of the financing agreement for the project.

Stage IV (supervisions)

1. author's supervision at the stage of the tender process for selection of the contractor for construction work,

2. author's supervision during construction works.

Requirements for the author's supervision:

Changes)

2. clarifying doubts concerning the solutions included in the project documentation arising during the tendering procedure for the selection of the construction works and project implementation.

3. replenishing detail design documentation and explanation of doubts in this respect in the course of the investment,

4. cooperate closely with all participants of the construction process, in particular as regards:

a) agree on the possibility of introducing changes in the project documentation or replacement solutions,

b) assist the investor's supervision in the control (monitoring) the compliance of the works of construction of the project documentation,

c) participate in committees and meetings of technical acceptance at the construction site.

5. activities connected with the exercise of the author's supervision on every call the Employer

6. ongoing monitoring ongoing construction works and arrival of the construction site or to the place indicated by the Purchaser to his every call, in order to resolve any arising in the course of the works have concerns with the solutions adopted in the documentation (the arrival of the construction should take place within 2 days date of the communication - fax, phone, or in another agreed with the Purchaser date).

953, as amended. d.);

8. ensuring that the scope of the changes did not cause significant change in the approved project construction, which requires obtain a new building permit / not to permit the implementation of road investment,

9. The supervision will be exercised only in the case come into effect the tender procedure for the selection of the Contractor's works, execution of works covered by documents constituting the object of the contract.

Architectural, construction, engineering and inspection services

Gmina Lublin | Published February 8, 2017  -  Deadline March 15, 2017
cpvs
71000000

The contract scope includes:

Stage I (concept):

1.1. obtaining current maps for design purposes,

1.2. develop the necessary inventory of urban (scale 1: 1000), architecture (scale 1: 200 or 1: 100), dendrological for design purposes and demolition,

1.3. develop two concepts (after 6 copies.)

1.4. agreeing on the concept of the customer.

Requirements for the concept:

Map for design purposes - the Contractor is required to obtain updated maps for design purposes (to a scale depending on the type of construction of the proposed facility for the area covered by the contract plus the statutory 30 m range, including areas adjacent to the border development).

The concept - a proposal geometry solutions, technical, technological, the basic infrastructure and accompanying allows to verify the vision of designer and her reference to the requirements of the Purchaser.

Krochmalna / Gas / Mill / Stadionowa, while the second is to include solutions targeted to the possible reconstruction of the roundabout to ensure proper communication service towards Wikia contributor to the LOF.

Stage II (Multi-documentation Design estimates).

Stage III (feasibility study):

- Feasibility study.

Requirements for the feasibility study:

1. A feasibility study should be drawn up in 3 copies.,

2. The feasibility study must be done for all the material scope of the project entitled .: "Integrated Communication Centre for Functional Lublin area."

The feasibility study should be developed in the generator applications available on the websites of the Marshal Office of Lublin and in hard copy.

Krochmalna / Diamond, for which a separate agreement is developed technical documentation.

It is the duty of the Contractor is also to make changes, corrections, additions feasibility study during the evaluation of the project by the Managing Authority for the signing of the financing agreement for the project.

Stage IV (supervisions)

1. author's supervision at the stage of the tender process for selection of the contractor for construction work,

2. author's supervision during construction works.

Requirements for the author's supervision:

Changes)

2. clarifying doubts concerning the solutions included in the project documentation arising during the tendering procedure for the selection of the construction works and project implementation.

3. replenishing detail design documentation and explanation of doubts in this respect in the course of the investment,

4. cooperate closely with all participants of the construction process, in particular as regards:

a) agree on the possibility of introducing changes in the project documentation or replacement solutions,

b) assist the investor's supervision in the control (monitoring) the compliance of the works of construction of the project documentation,

c) participate in committees and meetings of technical acceptance at the construction site.

5. activities connected with the exercise of the author's supervision on every call the Employer

6. ongoing monitoring ongoing construction works and arrival of the construction site or to the place indicated by the Purchaser to his every call, in order to resolve any arising in the course of the works have concerns with the solutions adopted in the documentation (the arrival of the construction should take place within 2 days date of the communication - fax, phone, or in another agreed with the Purchaser date).

953, as amended. d.)

8. ensuring that the scope of the changes did not cause significant change in the approved project construction, which requires obtain a new building permit / not to permit the implementation of road investment,

9. The supervision will be exercised only in the case come into effect the tender procedure for the selection of the Contractor's works, execution of works covered by documents constituting the object of the contract.

II.1.4).

Architectural, construction, engineering and inspection services

Gmina Lublin | Published March 24, 2017  -  Deadline March 29, 2017
cpvs
71000000

The contract scope includes:

Stage I (concept):

1.1. obtaining current maps for design purposes,

1.2. develop the necessary inventory of urban (scale 1: 1000), architecture (scale 1: 200 or 1: 100), dendrological for design purposes and demolition,

1.3. develop two concepts (after 6 copies.)

1.4. agreeing on the concept of the customer.

Requirements for the concept:

Map for design purposes - the Contractor is required to obtain updated maps for design purposes (to a scale depending on the type of construction of the proposed facility for the area covered by the contract plus the statutory 30 m range, including areas adjacent to the border development).

The concept - a proposal geometry solutions, technical, technological, the basic infrastructure and accompanying allows to verify the vision of designer and her reference to the requirements of the Purchaser.

Krochmalna / Gas / Mill / Stadionowa, while the second is to include solutions targeted to the possible reconstruction of the roundabout to ensure proper communication service towards Wikia contributor to the LOF.

Stage II (Multi-documentation Design estimates).

Stage III (feasibility study):

- Feasibility study.

Requirements for the feasibility study:

1. A feasibility study should be drawn up in 3 copies.,

2. The feasibility study must be done for all the material scope of the project entitled .: "Integrated Communication Centre for Functional Lublin area."

The feasibility study should be developed in the generator applications available on the websites of the Marshal Office of Lublin and in hard copy.

Krochmalna / Diamond, for which a separate agreement is developed technical documentation.

It is the duty of the Contractor is also to make changes, corrections, additions feasibility study during the evaluation of the project by the Managing Authority for the signing of the financing agreement for the project.

Stage IV (supervisions)

1. author's supervision at the stage of the tender process for selection of the contractor for construction work,

2. author's supervision during construction works.

Requirements for the author's supervision:

Changes)

2. clarifying doubts concerning the solutions included in the project documentation arising during the tendering procedure for the selection of the construction works and project implementation.

3. replenishing detail design documentation and explanation of doubts in this respect in the course of the investment,

4. cooperate closely with all participants of the construction process, in particular as regards:

a) agree on the possibility of introducing changes in the project documentation or replacement solutions,

b) assist the investor's supervision in the control (monitoring) the compliance of the works of construction of the project documentation,

c) participate in committees and meetings of technical acceptance at the construction site.

5. activities connected with the exercise of the author's supervision on every call the Employer

6. ongoing monitoring ongoing construction works and arrival of the construction site or to the place indicated by the Purchaser to his every call, in order to resolve any arising in the course of the works have concerns with the solutions adopted in the documentation (the arrival of the construction should take place within 2 days date of the communication - fax, phone, or in another agreed with the Purchaser date).

953, as amended. d.)

8. ensuring that the scope of the changes did not cause significant change in the approved project construction, which requires obtain a new building permit / not to permit the implementation of road investment,

9. The supervision will be exercised only in the case come into effect the tender procedure for the selection of the Contractor's works, execution of works covered by documents constituting the object of the contract.

Architectural, construction, engineering and inspection services

Gmina Lublin | Published March 23, 2017  -  Deadline March 28, 2017
cpvs
71000000

The contract scope includes:

Stage I (concept):

1.1. obtaining current maps for design purposes,

1.2. develop the necessary inventory of urban (scale 1: 1000), architecture (scale 1: 200 or 1: 100), dendrological for design purposes and demolition,

1.3. develop two concepts (after 6 copies.)

1.4. agreeing on the concept of the customer.

Requirements for the concept:

Map for design purposes - the Contractor is required to obtain updated maps for design purposes (to a scale depending on the type of construction of the proposed facility for the area covered by the contract plus the statutory 30 m range, including areas adjacent to the border development).

The concept - a proposal geometry solutions, technical, technological, the basic infrastructure and accompanying allows to verify the vision of designer and her reference to the requirements of the Purchaser.

Krochmalna / Gas / Mill / Stadionowa, while the second is to include solutions targeted to the possible reconstruction of the roundabout to ensure proper communication service towards Wikia contributor to the LOF.

Stage II (Multi-documentation Design estimates).

Stage III (feasibility study):

- Feasibility study.

Requirements for the feasibility study:

1. A feasibility study should be drawn up in 3 copies.,

2. The feasibility study must be done for all the material scope of the project entitled .: "Integrated Communication Centre for Functional Lublin area."

The feasibility study should be developed in the generator applications available on the websites of the Marshal Office of Lublin and in hard copy.

Krochmalna / Diamond, for which a separate agreement is developed technical documentation.

It is the duty of the Contractor is also to make changes, corrections, additions feasibility study during the evaluation of the project by the Managing Authority for the signing of the financing agreement for the project.

Stage IV (supervisions)

1. author's supervision at the stage of the tender process for selection of the contractor for construction work,

2. author's supervision during construction works.

Requirements for the author's supervision:

Changes)

2. clarifying doubts concerning the solutions included in the project documentation arising during the tendering procedure for the selection of the construction works and project implementation.

3. replenishing detail design documentation and explanation of doubts in this respect in the course of the investment,

4. cooperate closely with all participants of the construction process, in particular as regards:

a) agree on the possibility of introducing changes in the project documentation or replacement solutions,

b) assist the investor's supervision in the control (monitoring) the compliance of the works of construction of the project documentation,

c) participate in committees and meetings of technical acceptance at the construction site.

5. activities connected with the exercise of the author's supervision on every call the Employer

6. ongoing monitoring ongoing construction works and arrival of the construction site or to the place indicated by the Purchaser to his every call, in order to resolve any arising in the course of the works have concerns with the solutions adopted in the documentation (the arrival of the construction should take place within 2 days date of the communication - fax, phone, or in another agreed with the Purchaser date).

953, as amended. d.)

8. ensuring that the scope of the changes did not cause significant change in the approved project construction, which requires obtain a new building permit / not to permit the implementation of road investment,

9. The supervision will be exercised only in the case come into effect the tender procedure for the selection of the Contractor's works, execution of works covered by documents constituting the object of the contract.

Architectural design services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published March 2, 2017
Winner
Marbud Małgorzata Kurcz
cpvs
71220000

"Developing a comprehensive project documentation reconstruction with use change and adaptation for people with disabilities building A-13 -Pałacu Lubomirski Street. Radziwillowska 13 in Lublin (building registered as a monument) under - the Multiannual Programme for the years 2016-2022 "Reconstruction and expansion of the Independent Public Clinical Hospital No. 1 of the Medical University of Lublin."

Architectural design services

Katolicki Uniwersytet Lubelski Jana Pawła II | Published February 14, 2017  -  Deadline March 20, 2017
cpvs
71220000, 71200000, 71222000, 92312200, 92312230

The object of the competition is copyright, the creative development of sculptural-architectural project of the monument ks. Giles Radziszewskiego located on the square, Archbishop Jozef Zycinski of Lublin, together with the concept of development of its immediate environment, in accordance with the guidelines of urban architectural concept of land development and investment within their borders. Detailed information on the subject of the competition are included in the Annexes to the Regulations No. 12-17.

Selecting the best development project sculptural-architectural project of the monument commemorating the Father. Giles Radziszewskiego with the concept of development of the immediate surroundings of the monument of high artistic value. Enrichment of the city of Lublin for artistic work of an original, unique and attractive, compatible with the environment and social material.

Architectural design services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published January 25, 2017
cpvs
71220000

"Developing a comprehensive project documentation reconstruction with use change and adaptation for people with disabilities building A-13 -Pałacu Lubomirski Street. Radziwillowska 13 in Lublin (building registered as a monument) under - the Multiannual Programme for the years 2016-2022 "Reconstruction and expansion of the Independent Public Clinical Hospital No. 1 of the Medical University of Lublin."

Architectural design services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published December 8, 2016  -  Deadline January 9, 2017
cpvs
71220000

"Developing a comprehensive project documentation reconstruction of the E-13 Street. Radziwiłowska 13 in Lublin with obtaining building permit within - the Multiannual Programme for the years 2016-2022 "Reconstruction and expansion of the Independent Public Clinical Hospital No. 1 of the Medical University of Lublin."

Architectural design services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published December 8, 2016  -  Deadline January 10, 2017
cpvs
71220000

Develop a comprehensive project documentation reconstruction with use change and adaptation for people with disabilities building A-13 -Pałacu Lubomirski Street. Radziwillowska 13 in Lublin (building registered as a monument) under - the Multiannual Programme for the years 2016-2022 "Reconstruction and expansion of the Independent Public Clinical Hospital No. 1 of the Medical University of Lublin."

Architectural design services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published December 1, 2016  -  Deadline January 10, 2017
cpvs
71220000

Develop a comprehensive project documentation reconstruction with use change and adaptation for people with disabilities building A-13 -Pałacu Lubomirski Street. Radziwillowska 13 in Lublin (building registered as a monument) under - the Multiannual Programme for the years 2016-2022 "Reconstruction and expansion of the Independent Public Clinical Hospital No. 1 of the Medical University of Lublin."

Architectural design services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published November 30, 2016  -  Deadline January 9, 2017
cpvs
71220000

Radziwiłowska 13 in Lublin with obtaining building permit within - the Multiannual Programme for the years 2016-2022 "Reconstruction and expansion of the Independent Public Clinical Hospital No. 1 of the Medical University of Lublin."

Radziwiłowska 13 in Lublin with obtaining building permit within - the Multiannual Programme for the years 2016-2022 "Reconstruction and expansion of the Independent Public Clinical Hospital No. 1 of the Medical University in Lublin"

Radziwillowska 13 in Lublin, along with obtaining a decision on the construction permit within - the Multiannual Programme for the years 2016-2022 "Reconstruction and expansion of the Independent Public Clinical Hospital No. 1 of the Medical University in Lublin"

Range of services:

The inventory drawn up on paper in 4 copies. And on CD in PDF format and editable formats: dwg, doc, docx, xls, xlsx.

1.2 Implementation of the necessary expertise to evaluate the technical condition of a building in the implementation of the reconstruction;

1.3 Implementation of energy audit,

1.4 Obtaining the necessary opinions, agreements, checks, decisions, studies and approvals to enable comprehensive implementation of the investment,

1.5 Preparation of a complete application for a decision on the construction permit for the investment, deposit the competent authority in the administration of the proposal and obtain a final decision on the construction permit.

Develop a comprehensive project documentation reconstruction of the E-13 (along with obtaining a decision on the construction permit):

1/3 to dietary meals;

b) gas boiler with adjustment of equipment to the current and projected demand for power and heat to the existing provisions with the use of cogeneration system;

Radziwill 13 (Building A-13, B-13, E-13).

The exercise of the author's supervision.

Architectural design services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published September 6, 2016  -  Deadline September 23, 2016
cpvs

Architectural design services

Architectural design services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published August 25, 2016  -  Deadline September 12, 2016
cpvs

Architectural design services

Architectural design services

Agencja Mienia Wojskowego Oddział Regionalny w Lublinie | Published May 16, 2017  -  Deadline June 22, 2017
cpvs
71220000, 71221000

Development of design documentation of one multi-family residential building with 30 residential units, located in Zamość on plots no 1/110 and 1/113 at ul. Polish Army with accompanying infrastructure, understood as networks and connections with facilities associated with land development, (Investment task OL Q30)

2. obtaining on behalf of the Ordering party a decision on the building permit,

3. performing copyright supervision under the right of option,

Detailed scope of the subject matter of the order is included in the description of the subject of the order Functional Program - the form of the contract constituting the attachments to SIWZ.

Architectural and related services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published March 16, 2017
Winner
Vamed Polska Sp. z o.o.
cpvs
71200000

"Developing a comprehensive project documentation (grocers building design and executive project facilities and land) architectural concept of reconstruction and expansion of the Independent Public Clinical Hospital No. 1 in Lublin Independent Public Health Care in the area designated on the part of the area located at ul. Staszic 16 and 11 in Lublin, together with the cost performed supervisions on the implementation of the investment and obtaining a decision on the construction permit within - the Multiannual Programme for the years 2016-2022 "Reconstruction and expansion of SPSK 1 Medical University of Lublin."

Architectural and related services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published February 8, 2017
Winner
ZDI Sp. z o.o.
cpvs
71200000

"Developing a comprehensive project documentation reconstruction with use change and adaptation for people with disabilities building A-13 -Pałacu Lubomirski Street. Radziwillowska 13 in Lublin (building registered as a monument) under - the Multiannual Programme for the years 2016-2022 "Reconstruction and expansion of the Independent Public Clinical Hospital No. 1 of the Medical University of Lublin."

1. Scope of services:

- Develop a comprehensive design documentation (concept, design and construction design) reconstruction with use change and adaptation for people with disabilities existing building SPSK 1 - Department of Dermatology, Venereology and Dermatology Street. Radziwillowska 13 in Lublin (building A-13 -Pałac Lubomirski entered in the register of monuments) for the purpose of teaching - training and whereabouts of patients treated with chemotherapy and radiotherapy in the area:

a) make the necessary expertise to evaluate the technical condition of a building in the implementation of the reconstruction;

b) reconstruction of the facade of the replacement of windows and insulation performance of vertical and horizontal continuous footings;

c) the execution of an energy audit;

d) obtaining the necessary opinions, agreements, checks, decisions, studies and approvals to enable comprehensive implementation of investment;

e) preparation of a complete application for a decision on the construction permit on in.

Architectural, engineering and surveying services

Komenda Wojewódzka Policji w Lublinie | Published February 1, 2017
Winner
TPF Sp. z o.o.
cpvs
71250000, 71220000, 45111250

1. The contract scope includes the construction design documentation new headquarters VI Police Station in Lublin.

2. The detailed scope of the contract was included in the "Description of the order" (hereinafter referred to as OPZ) and in the model contract, which are attached hereto. For recognition of all the work is liable only and exclusively by the Contractor.

A detailed description of the contract is contained in Chapter I of the Terms of Reference, include inter alia the following information:

3. The task is expected to make:

a) multi-discipline construction project and executive including:

multi-disciplinary design concept;

project connections: power, tele-technical, water supply, gas or heating, sanitary sewer, stormwater, along with the removal of the necessary collision;

building project administrative office of the part: garage, technical facilities, boiler, heat exchanger, gymnasium and office space, a law secret;

geotechnical documentation;

project gazebos garbage;

shape design and landscaping with the fence, gates and detentions station entrance and furtkami the discharge of rainwater;

installation projects fault and internal sanitary and electrical emergency power supply in the low voltage, ie. access control.

Architectural, engineering and surveying services

Komenda Wojewódzka Policji w Lublinie | Published October 28, 2016  -  Deadline December 7, 2016
cpvs
71250000, 71220000, 45111250

A detailed description of the contract is contained in Chapter I of the Terms of Reference, include inter alia the following information: