Call +44 800 9755 164

Public tenders for architect, architecture in Bydgoszcz Poland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Bydgoszcz: SUPPLEMENT EQUIPMENT PLAYGROUND EQUIPMENT In playing I ELEMENTS OF SMALL ARCHITECTURE IN THE PARK of Bydgoszcz

Urząd Miasta Bydgoszczy | Published August 17, 2016  -  Deadline August 5, 2016
Winner
Firma FENSTER s.c., ul. Wojska Polskiego 65, 85-825 Bydgoszcz, kraj/woj. kujawsko-pomorskie.
cpvs
37535200

SUPPLEMENT EQUIPMENT PLAYGROUND EQUIPMENT In playing I ELEMENTS OF SMALL ARCHITECTURE IN THE PARK of Bydgoszcz.

Bydgoszcz: SUPPLEMENT EQUIPMENT PLAYGROUND EQUIPMENT In playing I ELEMENTS OF SMALL ARCHITECTURE IN THE PARK of Bydgoszcz

Urząd Miasta Bydgoszczy | Published July 14, 2016  -  Deadline July 22, 2016
cpvs
37535200

SUPPLEMENT EQUIPMENT PLAYGROUND EQUIPMENT In playing I ELEMENTS OF SMALL ARCHITECTURE IN THE PARK of Bydgoszcz.

Bydgoszcz: Production and delivery: the album titled. Nature and architecture Kujawsko-Pomorskie and wall calendar for 2017 pn.Krajobrazy Kujawsko-Pomorskie.

Kujawsko-Pomorski Urząd Wojewódzki w Bydgoszczy | Published January 5, 2017  -  Deadline August 29, 2016
Winner
Grafpol Agnieszka Blicharz-Krupińska, ul.Czarneckiego 1, Wrocław, kraj/woj. Polska.
cpvs
79800000, 79823000, 79822500, 39284100

Part One: Production and delivery of the album titled. Nature and architecture Kujawsko-Pomorskie. Album pages are illustrated works of the winners and those awarded in the photo contest conducted earlier Kujawsko-Pomorskie. The Contractor is obliged to carry out the development of the graphic album and exhibition of photos taken by the inhabitants of the region of Pomerania and Kujawy selected in the above-mentioned competition. The implemented project is funded by the Regional Fund for Environmental Protection and Water Management in Torun. 2. Part Two: Execution and delivery of a wall calendar for 2017 called. Landscapes Kujawsko-Pomorskie. Cover and individual cards calendar, as a backdrop, will feature exhibitions of works of art selected in the previously conducted art competition Kujawsko-Pomorskie (art works in A3 or A4), graphic design lies with the Contractor. The implemented project is funded by the Regional Fund for Environmental Protection and Water Management in Torun ..

Bydgoszcz: Production and delivery: the album titled. Nature and architecture Kujawsko-Pomorskie and wall calendar for 2017 called. Landscapes Kujawsko-Pomorskie.

Kujawsko-Pomorski Urząd Wojewódzki w Bydgoszczy | Published July 19, 2016  -  Deadline July 27, 2016
cpvs
79800000, 79823000, 79822500, 39294100

execution and delivery of the album and calendar, including in particular: 1. Part One: Production and delivery of the album pn.Przyroda and architecture Kujawsko-Pomorskie. Album pages are illustrated works of the winners and those awarded in the photo contest conducted earlier Kujawsko-Pomorskie. The Contractor is obliged to carry out the development of the graphic album and exhibition of photos taken by the inhabitants of the region of Pomerania and Kujawy selected in the above-mentioned competition. The implemented project is funded by the Regional Fund for Environmental Protection and Water Management in Torun. 2. Part Two: Execution and delivery of a wall calendar for 2017 pn.Krajobrazy Kujawsko-Pomorskie. Cover and individual cards calendar, as a backdrop, will feature exhibitions of works of art selected in the previously conducted art competition Kujawsko-Pomorskie (art works in A3 or A4), graphic design lies with the Contractor. The implemented project is funded by the Regional Fund for Environmental Protection and Water Management in Torun ..

Architectural design services

10 Wojskowy Szpital Kliniczny z Polikliniką Samodzielny Publiczny Zakład Opieki Zdrowotnej | Published October 30, 2015
cpvs
71220000, 71200000

Usługi projektowania architektonicznego

Advisory architectural services

Polska Spółka Gazownictwa Sp. z o.o., Oddział w Gdańsku | Published September 15, 2015
cpvs
71210000

Doradcze usługi architektoniczne

Architectural and related services

Rejonowy Zarząd Infrastruktury | Published November 6, 2015
cpvs
71200000, 45000000

Usługi architektoniczne i podobne

Architectural and related services

Rejonowy Zarząd Infrastruktury | Published October 8, 2015
Winner
ALSTAL Grupa Budowlana
cpvs
71200000, 45000000

Development of design documentation and execution of construction - assembly associated with: part I - the construction of a barracks building with a sztabowo - office Schools Specialists Fire Brigade for the Centre Glazing Logistics in Grudziadz on complex military meters. The group, part II construction of the building glazing services materiaiłowych in 1580 Group complex.

.Wykonanie Services for project Projects plans of protection tasks for the Natura 2000 areas in the Kujawsko-Pomorskie and Mazowieckie involving the printed newsletter.

 | Published November 27, 2014  -  Deadline December 5, 2014
cpvs
39294100

1. The contract is for a service consisting in the printed newsletter for the promotion of the project projects protection tasks plans for Natura 2000 areas in Kujawsko-Pomorskie and Mazowieckie carried out in the Department of Development and Environmental Protection Department of Civil Engineering, Architecture and Environmental Engineering at the University of Technology Life Sciences in Bydgoszcz, co-financed by the European Union European Regional Development Fund under the Operational Programme Infrastructure and Environment 2007-2013 and the National Fund for Environmental Protection and Water Management. 2. The service includes: execution and delivery by the Contractor in the electronic version of the newsletter graphic design acceptable to the Employer (based on materials provided by the customer, ie. The content and images); After accepting the Contractor shall design and provide subject matter of the contract at its own expense and risk to the place indicated below; After completing the delivery object of the agreement will be forwarded to the Purchaser under the protocol of delivery. Delivery protocol Contractor shall prepare and submit to the Employer signature. 3. Place of delivery of printed newsletters: Faculty of Engineering, Architecture and Environmental Engineering, Department of Development and Environmental Protection, ul. Dry 9, 85-789 Bydgoszcz.

Architectural design services

10 Wojskowy Szpital Kliniczny z Polikliniką Samodzielny Publiczny Zakład Opieki Zdrowotnej | Published September 9, 2015  -  Deadline October 15, 2015
cpvs
71220000, 71200000

Execution of project-estimate documentation for the task Fri. "Construction of a polyclinic".

Architectural, construction, engineering and inspection services

Rejonowy Zarząd Infrastruktury | Published February 13, 2015
cpvs
71000000

Usługi architektoniczne, budowlane, inżynieryjne i kontrolne

Purchase of computer hardware and software.

 | Published November 7, 2014  -  Deadline November 18, 2014
cpvs
30213000, 30213100, 30121300, 30230000, 48317000

The contract is for the purchase of computer hardware and software specified below in seven tasks: Task 1. A desktop computer with a monitor, the Department of Telecommunications, Information Technology and Electrical Engineering; Task 2. A desktop computer with a monitor and keyboard to the Department of Fundamentals of Plant Production and Experimentation; Task 3. The portable computer (notebook) for Dean WBAiIŚ; Task 4. The portable computer 1 pc. For the Department of Production Engineering; Task 5. Drives HDD, SSD and memory SO-DIMM for the Department of Interbank WTIiE; Task 6 software for office use 2 licenses for the Dean of the Faculty of Architecture of Civil and Environmental Engineering.

Supply of computer equipment.

 | Published October 31, 2014  -  Deadline November 12, 2014
cpvs
30200000, 30231310, 30313000

The contract is for the supply of brand new 1 pc. PC, 1 pc. laptop, 2 pcs. monitors, external drives 2szt.przenośnych .For delivery of the contract by the Contractor at his own cost and risk in the places indicated by the Employer equipment will be transferred to the Purchaser upon delivery protocol. The Contractor shall prepare the delivery protocol and submit it for signature by the Employer. On the subject of the contract consists of the following tasks, described in detail in the Terms of Reference Task 1: Supply of 1 pc. PC, 1 pc. monitor the delivery of the Department of Genetics and Animal Breeding Task 2: Supply 1pc. portable external drive for the Department of Genetics and Animal Breeding Task 3: Supply laptop - 1pc. for the Faculty of Architecture of Civil and Environmental Engineering Task No. 4: Delivery Monitor - 1 pc. for the Institute of Mathematics and Physics Problem # 5: Supply of portable external drive - 1 pc. for the Department of Telecommunications Computer Science and Electrical Engineering.

Bydgoszcz: Developing the concept of architectural and urban land military complex in Tomaszow

Rejonowy Zarząd Infrastruktury | Published July 29, 2016  -  Deadline July 18, 2016
Winner
Wojskowe Biuro Projektów Budowlanych Sp. z o.o., al. Niepodległości 53, 60-714 Poznań, kraj/woj. wielkopolskie.
cpvs
71200000

Developing the concept of architectural and urban land military complex in Tomaszow.

Advisory architectural services

Polska Spółka Gazownictwa Sp. z o.o. Oddział w Gdańsku | Published August 11, 2015  -  Deadline August 25, 2015
cpvs
71210000, 71221000

The contract is for service in the field of copyright exercise supervision over the implementation of the investment project entitled .: Construction of high pressure gas pipeline relations Brodnica - New Town Lubawskie with reduction station - measuring in meters. Kurzętnik - Stage II of the EU project entitled. "Construction of the gas network w / c relation Brodnica - New Town Lubawskie - Iława DN 300 and gasification of municipalities" No POIS.10.02.00-00-013 / 10, which is funded by the European Regional Development Fund as part of Measure 10.2 Construction of distribution systems natural gas in areas not supplied with gas and modernization of existing distribution networks Priority X Energy security including diversification of energy sources Operational Programme Infrastructure and Environment, 2007 - 2013. Supervision includes the construction of a gas pipeline with a length of about 5.9626 kilometers, in particular: - Episode I of Pz 11 ( Pz 11 + 50,9m) for Pz 15a (Pz 15 + 3.3 m) - the length of 0.2165 km DN 250 (pipeline construction project forming section II) - Episode II of Pz 43 + 24m to the Pz 47 + 0, 6m - the length of 0.4197 km DN 250 (pipeline construction project forming section III / 2) - Episode III of Pz Pz 68 to 87a (Pz 87 + 35,2m) - the length of 4.1368 km DN 300 (forming gas pipeline construction project sections IV / 1, IV / 2, IV / 3, IV / 4, V and railway line No. 208 relationship Działdowo-Chojnice) - Episode IV from Pz Pz 91a to 94 + 15m - the length of 1.1896 km DN 300 ( pipeline construction project forming sections VI / 1, VI / 2, VI / 3, VI / 4).

Advisory architectural services

Polska Spółka Gazownictwa Sp. z o.o., Oddział w Gdańsku | Published August 29, 2015  -  Deadline September 10, 2015
cpvs
71210000

The contract is for service in the field of copyright exercise supervision over the implementation of the investment project entitled .: Construction of high pressure gas pipeline relations Brodnica - New Town Lubawskie with reduction station - measuring in meters. Kurzętnik - Stage II of the EU project entitled. "Construction of the gas network w / c relation Brodnica - New Town Lubawskie - Iława DN 300 and gasification of municipalities" No POIS.10.02.00-00-013 / 10, which is funded by the European Regional Development Fund as part of Measure 10.2 Construction of distribution systems natural gas in areas not supplied with gas and modernization of existing distribution networks Priority X Energy security including diversification of energy sources Operational Programme Infrastructure and Environment 2007-2013. Supervision includes the construction of a gas pipeline with a length of about 5.9626 kilometers, in particular: - Episode I of Pz 11 (Pz 11 + 50.9 m) to Pz 15a (Pz 15 + 3.3 m) - the length of 0.2165 km DN 250 (pipeline construction project forming section II) - Episode II of Pz 43 + 24 m Pz 47 + 0.6 m - length of 0.4197 km DN 250 (pipeline construction project forming section III / 2) - Episode III by Pz Pz 68 to 87a (Pz 87 + 35.2 m) - the length of 4.1368 km DN 300 (forming gas pipeline construction project sections IV / 1, IV / 2, IV / 3, IV / 4, V and railway line No. 208 relationship Działdowo-Chojnice) - Episode IV from Pz Pz 91a to 94 + 15 meters - the length of 1.1896 km DN 300 (forming gas pipeline construction project sections VI / 1, VI / 2, VI / 3, VI / 4).

Bydgoszcz: 112 / P / 2016

Administracja Domów Miejskich "ADM" Spółka z o.o. | Published July 19, 2016  -  Deadline August 3, 2016
cpvs
71000000, 71250000, 71300000, 71320000

Development of project documentation and obtaining permit for construction works in municipal buildings - managed by the Administration of Urban Houses ADM Sp. z oo A detailed scope of the contract includes: 1) the acquisition by the Contractor on its own, as part of remuneration for proposal (on the basis prepared by the Contractor attorney Employer) all necessary approvals, permits, opinions (including the Municipal Conservator - applies to the task No. 2 and No. 3 ) and other documents required of the Contractor for the development of project documentation and obtaining his permit for construction works covered by the documentation. 2) the development of the construction project in the amount of 5 copies (on paper), including attached by the Purchaser technical expertise - including: a) the conditions BIOZ, guidelines and safety p. Fire protection. b) a detailed investment cost estimate broken down into individual premises and common parts (according to the guidelines of the Employer - inspector ADM): paper version -2 copies., CD / DVD-1 copy. (files provide a cost estimate in pdf extension and ath. c ) a detailed bill of quantities (divided as investment estimate): paper version - 2 copies., CD / DVD - 1 copy. (file extension pdf and ath.) d) technical specifications of the workmanship and the receipt of work: paper version - 2 copies., CD / DVD - 1 copy., application must be submitted to the Department of Administration Building of the City of Bydgoszcz (model application and card services to issue a decision granting permission for the works on the UM Bydgoszcz, Faculty of Administration Building, paper Architecture) . WARNING:

Bydgoszcz: Reconstruction of office and a staff No. 1 for Doctrine and Training Centre in Bydgoszcz, SZ with making an inventory of the schematic object

Rejonowy Zarząd Infrastruktury | Published July 27, 2016  -  Deadline September 30, 2017
cpvs
45000000

Reconstruction of the building office and a staff No. 1 for Doctrine and Training Centre in Bydgoszcz, SZ with making an inventory of the schematic object Description of the order: in the field of construction industry: demolition-robots, -wycinka trees, earth-robots the execution of excavations, a substrate and sleepers mortar and concrete and aggregates, -betonowanie without reinforcement, -preparation and installation of reinforcement, concrete-robots, -hydroizolacje, -Isolation thermal and acoustic walling-robots, -obróbki Sheet, -konstrukcje steel-robots Paint and plaster cladding internal -stolarka and ironwork, -docieplenie outside wall, -zieleń and elements of small architecture, -Work road, in the field of electrical industry: -Power supply - modernizing (retrofitting existing cabinets designed with cable connections) -Power supply equipment fire, -rozdzielnice (retrofitting of existing tables, draft chapter. HCC) -Power supply substation equipment, -Power supply of ventilation and air conditioning systems -Internal emergency lighting, electrical-installation (general lighting, installation of Hydraulics and sockets), lightning-installation, in terms of sanitary: -made works installation - water and sewage, heating installations -made - installation of mechanical ventilation and air conditioning industry in the field of telecommunication: -made installation of fire alarm and smoke, -made system SKD and modernization of burglary and robbery, -made system Television surveillance TSN - execution of SAP detailed scope of work determines the construction design, detailed design and technical specifications. Projects implementing dot. Installation TSN, KD and SSWiN of clause Reserved for inspection at the registered office of the Purchaser. For access, please contact Ms. L. Jankowski tel. 261 41 37 51/261 41 47 51 ..

Construction of traffic lights excited at pedestrian crossings on the street. Pope John Paul II and ul. Solskiego in Bydgoszcz.

 | Published November 27, 2014  -  Deadline December 12, 2014
cpvs
45233294

Type of contract: the works within the meaning of Article 2 paragraph 8 UPZP in conjunction with Article 3 paragraph 7 of the Act of 7 July 1994. Construction Law / Acts. Laws of 2013. Pos. 1409, as amended. d. /. The contract is for the construction of induced traffic lights at pedestrian crossings, to the extent and under the conditions detailed in the following documents, which are an integral part of the tender documents: 1) the design documentation (DP) developed by the Laboratory of Architecture and Construction Projects NEVORA Luke Dawidowski, ul. Jan Karski 43, 80-283 Gdańsk, 2) technical specifications for execution and acceptance of works (SST), 3) cost estimates for proposals containing bills of quantities (for each lot a separate estimate), 4) the model contract, which are available on the website of the Employer in place of the publication of this case: www.zdmikp.bydgoszcz.pl. Note: In the case of the present Terms of Reference, including its Annexes (including project documentation or technical specifications, performance and acceptance of works) names (eg. Materials) indicating the manufacturer and the specific type of the catalog, should any such possible treat the case as an example and read with clause = or equivalent, with the same or worse technical parameters, quality and aesthetic =. The contract is divided into two parts corresponding to the locations of construction traffic: 1. Part 1 - ul. John Paul II Street. Earth, 2.część 2 - ul. Solskiego between ul. Fallow and st. Bielicka. Employer does not provide supplementary contracts. Note: The below in II.2. notice, 21 day period of the contract is the term maximum. The full term of the contract, and each lot: min. 11 days - max. 21 days from the date of signing the contract (time limit for completion of the contract shall be evaluated in accordance with the evaluation criteria).
  • 1