Call +44 800 9755 164

Public tenders for architect, architecture in Poland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Chorzów: ALL YEAR MAINTENANCE public transport and WASHING bus shelters, BILLBOARDS AND ELEMENTS OF SMALL ARCHITECTURE

Miasto Chorzów | Published July 26, 2016  -  Deadline August 31, 2018
ALL YEAR MAINTENANCE public transport and WASHING bus shelters, BILLBOARDS AND ELEMENTS OF SMALL ARCHITECTURE Subject of public procurement includes: the summer and winter maintenance of cleanliness of the bus stops, wash lights and billboards located in the city of Chorzow, in accordance with the scope of work annexed No. 5 the ToR.

Rzezawa: Reconstruction of the football field on a full-size pitch grass pitch and multi-purpose turf polyurethane Rzezawa project: Reconstruction and repair of full-size sports field grassy football field, construction of the multifunctional court, small architecture, parking and lighting, along with the associated infrastructure at building sport in Rzezawa Wiśniowa 68.

Gmina Rzezawa | Published July 26, 2016  -  Deadline September 30, 2018
The contract involves the reconstruction of a football field on a full-size pitch grass pitch and multi-purpose turf polyurethane Rzezawa project: Reconstruction and repair of full-size sports field grassy football field, construction of the multifunctional court, small architecture, parking and lighting, along with the accompanying infrastructure the building of sport in Rzezawa Wiśniowa 68 the task should be performed: 1) multi-pitch (3in1) the court shall be composed of: 1. two basketball courts with dimensions of 15x28 [m] each; 2. pitch handball 20x40 [m]; 3. volleyball court 9x18 [m]; The field for the game of handball, can also be used to play football using the same piece of equipment. The whole album multifunctional court include / in the middle, will have dimensions: 30x44 [m]. Surface: artificial - polyurethane. The scope of work planned for implementation: the drainage line, the relevant seabed troughs and executing an appropriate foundation surface, performing polyurethane surface, the lighting arena execution, delivery and installation of equipment of sports fields for basketball, handball, volleyball, delivery and installation piłkochwytów. 2) Full-size football field with dimensions: The playing field: 68.00 x 105.00 [m] Plate field (including seat belts): 76.00 x 110.00 [m] Surface grass (natural grass) a four a total thickness of 33 cm. The scope of work planned to be implemented: the demolition and removal of existing items pitch along with disposal, construction of a new pavement structure through appropriate shaping of the trough and the individual layers, execution lighting sports arena, delivery and installation of the equipment field, in particular: goals, posts boiskowe, sheds Sports, delivery and installation of stands. It also assumes the execution of the fence in accordance with the land use plan. These locations of the objects covered by this order has been shown in the site plan, and in the technical description of the project were presented in detail fittings w / the objects. Pavement should be made of concrete blocks dyed according to the bill of quantities and locations shown in Annex 14

Architectural design services

Miasto Stołeczne Warszawa w imieniu którego działa Zarząd Zieleni m.st. Warszawy ul. Czerniakowska 71/1 lok. 703 00-715 Warszawa | Published December 30, 2016  -  Deadline January 23, 2017

Competition is realizacyjnym and two-step. Scope of the competition was described in Chapter II, Section. 2. Regulations. The aim of the competition is to obtain the best in terms of spatial, functional and architectural concept of urban planning and architecture for public spaces boulevard of the Vistula River and the adjacent zone determinated located on the section of the bridge Swietokrzyski to Czerniakowski Cape with particular emphasis on land Skwer Kahla.

The purpose of the contest is to select, in accordance with the Regulations, consistent development concept, which in part will be the basis for the development of complete design documentation enabling the implementation of Investment (part of realization) and part of the guidelines for further design work (part of a study). Competition Participant whose work jury deems best, will be invited to negotiate under single-source procurement, the subject of which will be to develop project documentation.

Architectural design services

Miasto Stołeczne Warszawa w imieniu którego działa Zarząd Zieleni m.st. Warszawy ul. Czerniakowska 71/1 lok. 703 00-715 Warszawa | Published January 11, 2017  -  Deadline January 23, 2017

Competition is realizacyjnym and two-step. Scope of the competition was described in Chapter II, Section. 2. Regulations. The aim of the competition is to obtain the best in terms of spatial, functional and architectural concept of urban planning and architecture for public spaces boulevard of the Vistula River and the adjacent zone determinated located on the section of the bridge Swietokrzyski to Czerniakowski Cape with particular emphasis on land Skwer Kahla.

The purpose of the contest is to select, in accordance with the Regulations, consistent development concept, which in part will be the basis for the development of complete design documentation enabling the implementation of Investment (part of realization) and part of the guidelines for further design work (part of a study). Competition Participant whose work jury deems best, will be invited to negotiate under single-source procurement, the subject of which will be to develop project documentation.

Architectural, engineering and surveying services

Gmina Miasta Toruń | Published December 17, 2016  -  Deadline February 3, 2017
The scope of the project documentation includes: 

- A new hospital building,

- Internal communication between the new hospital building and the main hospital building,

- Development environment designed facility with communications, referring to the existing landscaping hospital

- Adaptation of premises, the redundant areas of the hospital buildings for other purposes and the adaptation of existing facilities to the necessary communication with the proposed building,

- Possibility of later direct connection branches hematologic located on the second floors of buildings (enclosed walkway built on pillars)

- Technology newly designed and adapted rooms with equipment.

Guidelines for the implementation of the agreement:

Batory 17/19, Plot No. 86/15 - District 11 in the center of Torun,

- Ter.

The scope of the project documentation includes:

- A new hospital building,

- Internal communication between the new hospital building and the main hospital building,

- Development environment designed facility with communications, referring to the existing landscaping hospital

- Adaptation of premises, the redundant areas of the hospital buildings for other purposes and the adaptation of existing facilities to the necessary communication with the proposed building,

- Possibility of later direct connection branches hematologic located on the second floors of buildings (enclosed walkway built on pillars)

- Technology newly designed and adapted rooms with equipment.

Guidelines for the implementation of the agreement:

Batory 17/19, Plot No. 86/15 - District 11 in the center of Torun,

- The area is not covered by the local zoning plan,

- Obtaining a decision on the location of investment of public purposes belongs to the Employer,

Andrew Czapiewski (annexed hereto)

- Designed facility must comply with currently applicable legal provisions,

- To all work materials should be used for standard adequate for the type of objects, materials and technologies adopted by the designer should have certain characteristics,

06/15/2016 annexed hereto)

Ministry of Economy of October 2014., Attached hereto)

Ministry of Infrastructure and Development of 2014., Attached hereto).

The list of studies included in the object of the contract:

Step I:

1) conceptual design (including land use, floor plans, elevations, description)

Stage II:

2) construction projects:

a) grocers project land,

b) the design of architecture,

c) the project design,

d) the design of sanitary installations,

e) the design of electrical installations and low voltage,

Stage III:

3) draft regulations and other studies of the contract:

a) land development plan:

- Industry: architecture,

- Industry: roads, terrain and small architecture,

- Industry: green with cost estimates clippings,

- Industry: connection (network) water and sewer connections,

- Industry: connection (network) which,

- Category: Connections n / n and area lighting,

- Industry: telecommunication connections,

b) architectural design with colors, arrangement and interior design and guidelines for the detailed design of cranes,

c) construction project static calculations,

d) the project sanitation (water and sewage., what, hot water, process heat, storm sewer, hydrants internal, medical gases)

e) the design of ventilation and air conditioning,

f) design automation ventilation and air conditioning,

g) projects electrical systems (electrical, lighting, sockets, strength, przeciwporażeniowych, switchboards, lightning)

h) projects of low voltage installations (alarm, signaling, fire., tele-nurse call, multimedia and IT)

i) projects of alternative energy sources,

j) technological projects.

Architectural, engineering and surveying services

Gmina Miasta Toruń | Published December 17, 2016  -  Deadline January 25, 2017

Preparation of design documentation tasks pn.

- Expansion of the path to health Kaszczorek,

Haller

Szczecin and Koszalin Krynickiej

- Rest in the forest - the construction of pedestrian paths, cross-country skiing and cycling trails on the estate on the escarpment.

Object of the contract includes design documentation project titled. "Expansion path to health Kaszczorek."

The scope of the project documentation includes:

600 m

the course proposed by the applicant to the participatory budget (extract from the application to the participatory budget is attached hereto)

- Setting devices for recreation made from wooden logs and benches with wooden logs and rubbish bins along the path

Guidelines for the implementation of the agreement:

tourism; Plot No. 2012/16 - precinct 61,

Tourist (near the bus stop) to the built-loop path in the north; the area in question is a forest area,

- The contractor must provide for the need to perform an inventory for design purposes,

- All works use materials of good quality,

- All the material (equipment) used and proposed by the designer should have certain characteristics,

- The cost of the task should not exceed 148 425 PLN gross.

The list of studies included in the object of the contract:

1) conceptual design (including land use and description)

2) simplified construction project includes within its scope a short description and basic drawings for determining the standard of the work and draw investment cost estimate,

3) information on safety and health,

4) technical specification of execution and acceptance of construction works + electronic version (pdf + editable version)

5) The bill of quantities + electronic version (pdf format and ath)

6) investment cost estimate + electronic version (pdf format and ath)

7) other studies necessary to meet all anticipated features and necessary to achieve agreement,

8) design documentation, also in electronic format PDF and DWG (AutoCAD 2008).

Subject of the agreement also includes:

1) execution of the map syt.-H. a scale of 1: 500 for the consultative,

2) the cadastral map the area covered by the planned investment with the excerpt from the land register,

3) preparation of documents to the Employer of the required administrative decisions [prepared by the Contractor within 3 weeks of the contract (or other technically reasonable deadline set by the Contracting Authority) appropriate complete applications with required attachments to be signed by the Employer]

4) transfer to the Purchaser copyright property made to the project documentation in the field covered by the agreement.

The Contractor undertakes to perform the object of the contract in accordance with the principles of modern technical knowledge, the applicable regulations, technical conditions and standards, based on the inspection of the project area, adopted by the Employer offer and this Agreement.

Haller. "

The scope of the project documentation includes:

a) development of the area of ​​a recreational and leisure with:

- Green (ordering and planting)

- Small architecture (benches, tables for board games, picnic tables, bike racks)

- Lighting,

- Arrays that act as temporary outdoor exhibitions,

b) replacement of the existing pavement of the access road to the property from the ground to the surface of the cobblestones framed curb,

Haller

Haller.

Guidelines for the implementation of the agreement:

Haller, plot no 98, 99, 100, 146, 147, 156 - precinct 71,

- The area of ​​development is not covered by the local zoning plan,

- The contractor must provide for the need to perform an inventory for design purposes,

- All works use materials of good quality,

- All the material (equipment) used and proposed by the designer should have certain characteristics,

- The cost of the task should not exceed 190 000 PLN gross.

The list of studies included in the object of the contract:

1) conceptual design (including land use and description)

2) The construction project includes all elements of the project executive,

3) inventory of greenery with the project clippings,

3) information on safety and health,

4) technical specification of execution and acceptance of construction works (all branches) + electronic version (pdf + editable version)

5) The bill of quantities + electronic version (pdf format and ath)

6) investment cost estimate + electronic version (pdf format and ath)

7) Another study

Architectural design services

Zarząd Komunalnych Zasobów Lokalowych Sp. z o.o. | Published December 21, 2016  -  Deadline January 26, 2017

Object of the contract includes:

1) execution of the concept of the location of a multi-family building with infrastructure against existing housing estate at ul. Nadolnik plot no. 11/20, 11/14 and 11/16 precinct Index, Ark. 09,, plot no. 2/19 pcs., 2/13 part. and 2/4 part. The main precinct, Ark. 12, and plot no. 26/4 precinct Index, Ark. 09, hereinafter referred to as "Investment". The developed concept should comply with the conditions of the local spatial development plan "The main part of the area B" in Poznan (Resolution No. LI / 785 / VI / 2013 Poznań City Council of 18.06.2013 r.) And guidelines for project documentation -zał. No. 9 to the SETC;

2) the acceptance of the concept by the Purchaser, the execution of the complete technical documentation of interdisciplinary construction and execution (design and estimate) of the building, together with technical infrastructure inside and outside, parking, internal roads with sidewalks and small architecture in the area marked in the local zoning plan symbol 2MW along with the implementation of visualization of the building with the rear of the existing building in accordance with the guidelines for project documentation, attached as Annex No. 9 hereto;

3) preparation of project documentation of water supply connections, and connections sewage and stormwater in accordance with the conditions set by the utility providers; Connection of heat from the building Nadolnik 9;

4) preparation of project documentation of the road with parking spaces and sidewalks;

5) obtaining all necessary approvals, permits and decisions, in particular obtaining the building permit;

6) project coordination connections of electricity,

7) The author's supervision throughout the duration of the investment, which applies to the contract.

Architectural design services

Zarząd Komunalnych Zasobów Lokalowych Sp. z o.o. | Published December 30, 2016  -  Deadline February 8, 2017

Object of the contract includes:

Development of design documentation and construction executive with obtaining all the necessary permits for construction of residential multi-family residential buildings of municipal street. Darzyborskiej in Poznan, plot No. 6/17, 6/19, 6/23, 7/15, 7/18, 7/24, 7/26 Ark. 14, precinct Kobylepole, and also the execution of geotechnical soil and dendrological inventory, project demolition of existing buildings and

with the necessary infrastructure for the proper operation of the technical internal and external communication system with parking, internal roads with sidewalks and parking places, small architecture and a playground, obtain on behalf of the Employer technical conditions for connection to the gas network, electricity and water and sewage.

Project documentation should be prepared in compliance with applicable regulations,

in particular, according to the Building Law and the Regulation of the Minister of Infrastructure on the detailed scope and form of design documentation, technical specifications of the workmanship and the receipt of work and in accordance with the guidelines annexed No. 9 Terms of Reference.

Architectural design services

Uniwersytet w Białymstoku | Published December 16, 2016  -  Deadline January 26, 2017

The contract is for the development of project documentation and cost estimate, multi-branch, STWiOR allowing for the construction of the University Library in the Campus of the University of Bialystok,

Tsiolkovsky, including technical infrastructure and landscaping, as well as the investment cost estimate and WKI and the author's supervision over the implementation of works carried out

on the basis of this documentation, according to the "specification of the order" constituting Appendix 1 hereto.

The contract is for the development of project documentation and cost estimate, multi-branch, STWiOR allowing for the construction of the University Library in the Campus of the University of Bialystok,

Tsiolkovsky, including technical infrastructure and landscaping, as well as the investment cost estimate and wiki, and author's supervision over the implementation of works carried out

on the basis of this documentation, according to the "specification of the order" constituting Appendix 1 hereto.

The subject of the abovementioned orders can be:

Steps identical to the activities provided for in the description of the order and the formula Agreement, in the design of the works of civil defense, when the need for design and construction will result from the decision, ruling or other decisions (guidelines, recommendations) derived from the bodies or institutions;

Steps identical to the activities provided for in the order specification and model contract related to the design of alternative solutions

or additional components of the object, introduced by the Employer made to and received by the Purchaser documentation realized

1, item 6) PPL:

At the request of the Employer Contractor (Designer) present the estimated cost of the contract, based on the Environmental Principles of Valuation Works Design, in force at the date of the estimated cost of the contract;

The contract will be awarded following negotiations between the Employer and the Contractor in terms of final salary Contractor scope of the contract, the date of its implementation and the remaining terms of the contract.

Architectural and related services

Gmina Miasta Toruń | Published January 4, 2017  -  Deadline February 13, 2017
People's Army / Okólna in Torun. 

The detailed scope of documentation referred to in point II.2.4) announcement.

The list of studies included in the object of the contract:

1) conceptual design (including: floor plans, sections, visualization, technical description)

2) construction project containing all design elements executive branches at least: architectural and building design, construction, plumbing, heating, electrical, electronics, internet, fire., Monitoring, intrusion detection, and other in terms of ensuring the performance of all anticipated function rooms,

3) design and interior furnishings,

4) information on safety and health,

5) The owner of fire safety, the scenario of events fire

6) technical specification of execution and acceptance of construction works (all branches) + electronic version (pdf + editable version)

7) The bill of quantities + electronic version (pdf format and ath)

8) investment cost estimate + electronic version (pdf format and ath)

9) summary statement of the total cost of investment ( "ROCE"), including those resulting, among others, the investment cost estimates, the cost of project documentation, supervision of investor and author, interconnection agreements, equipment and other,

10) other studies arising from the resulting technical conditions of connection and necessary to satisfy all of assumed functions in the building and obtain a building permit (or, if the building permit is not required - notification of the intention to commence the construction works) and permission to use the premises,

11) project documentation, also in electronic format pdf and dwg (2008).

Object of the contract also includes:

1) execution of the map syt.- height. On a scale of 1: 500 for design purposes,

2) Extract from the land register,

3) the implementation of the supplementary inventory to the extent required for the performance of the construction project,

4) obtaining technical conditions for connection to the technical infrastructure of the relevant institutions exploiting the [under-prepared by the Contractor within 4 weeks of the contract (or other technically reasonable deadline set by the Contracting Authority) the applicable complete applications with required attachments to be signed by the Employer]

5) preparation of documents to occur by the Employer of the required administrative decisions, including the decision on the environmental permit for the project, the decision on the construction permit / or when a building permit is not required - to notify the intention of starting construction works and other required by the design and implementation of the [prepared by the Contractor within 4 weeks of the contract (or other technically reasonable deadline set by the Contracting Authority) appropriate complete applications with required attachments to be signed by the Employer]

6) transfer to the Purchaser copyright property made to the project documentation in the field covered by the agreement.

Architectural design services

Miasto Lubartów | Published January 3, 2017  -  Deadline February 9, 2017

The contract is to develop the concept and the technical documentation for the project "Green LOF" in the area of ​​Lubartow including:

1) Development of the concept and the technical documentation of reconstruction of the City Park in Lubartów,

2) Development of the concept and the technical implementation of the ecological path,

3) Development of the concept and the technical documentation of reconstruction of the building located at ul. Farna 4 in Lubartowie plot gr. No. 542, section 7.

Architectural design services

Miasto Lubartów | Published December 31, 2016  -  Deadline February 8, 2017

The contract is to develop the concept and the technical documentation for the project "Green LOF" in the area of ​​Lubartow including:

1) Development of the concept and the technical documentation of reconstruction of the City Park in Lubartów,

2) Development of the concept and the technical implementation of the ecological path,

Farna 4 in Lubartowie plot gr. No. 542, section 7.

Location: Lubartów; plot no. 218; 223 precinct 7, covers an area 15.3 ha

Architectural design services

Miasto Gliwice, Wydział Zamówień Publicznych | Published January 10, 2017

Construction of the building of the municipal hospital.

Architectural design services

Towarzystwo Budownictwa Społecznego Warszawa Północ Sp. z o.o. | Published January 13, 2017  -  Deadline February 16, 2017

The contract is for the development of project documentation for the planned investments involving the construction of multifamily residential building with an underground garage located at ul. Radzymińska in Warsaw.

Object of the contract also includes supervision of copyright by the Contractor, which will be implemented as needed, until the end of the investment, updating collective statement of costs, after conducted tender for the construction works. The contractor will be required to the current cooperation at the stage of the tender procedure for construction works in immediate explanation and answer inquiries contractors regarding technical solutions contained in the design and estimate documentation, as well as to provide possible assistance in the evaluation of tenders. A detailed description of the Contract and conditions of execution can be found in Chapter 4 and 5 of the Terms of Reference.

Phase I Feasibility Study and concept of spatial software for the project: "Construction of residential and service of underground garage at ul. Radzymińska and parking ground and technical infrastructure in Warsaw "presenting the possibility of building the property

Phase II includes construction projects together with obtaining a building permit

Phase III includes the execution of projects implementing

Stage IV - includes supervision.

Architectural design services

Miasto Lubartów | Published January 14, 2017  -  Deadline February 10, 2017

The contract is to develop the concept and the technical documentation for the project "Green LOF" in the area of ​​Lubartow including:

1) Development of the concept and the technical documentation of reconstruction of the City Park in Lubartów,

2) Development of the concept and the technical implementation of the ecological path,

3) Development of the concept and the technical documentation of reconstruction of the building located at ul. Farna 4 in Lubartowie plot gr. No. 542, section 7.

Architectural design services

Stołeczny Zarząd Infrastruktury | Published January 14, 2017  -  Deadline February 24, 2017

The contract is for the execution of the investment program and project-estimate documentation together with a description of the contract and obtaining the necessary arrangements and administrative decisions, as well as the author's supervision for the task: Construction of building for the needs of Archive MON Street. Radio 2 in Warsaw.

The contract is for the execution of the investment program and project-estimate documentation together with a description of the contract and obtaining the necessary arrangements and administrative decisions, as well as the author's supervision for the task: Construction of building for the needs of Archive MON Street. Radio 2 in Warsaw.

Characteristics of the facility:

The planned investment is located in the military on the land is a closed area, marked as plot No. 1/10 precinct

6-08-10 in Warsaw, settled in the land register KW No. WA1M / 00520925 fifths, owned by the State Treasury in the permanent management of the Capital of the Board of Infrastructure in Warsaw, area military complex (including objects) is not entered in the register of monuments and it is not conservation.

The job done in three stages:

Stage I - Implementation of the investment program

Phase II - Implementation of project-estimate documentation

Stage III - the author's supervision - from the start to the completion of the works

A detailed description of the contract is contained in the Terms of Reference.

Architectural design services

Stołeczny Zarząd Infrastruktury | Published January 19, 2017  -  Deadline February 24, 2017

The contract is for the execution of the investment program and project-estimate documentation together with a description of the contract and obtaining the necessary arrangements and administrative decisions, as well as the author's supervision for the task: Construction of building for the needs of Archive MON Street. Radio 2 in Warsaw.

Architectural design services

Muzeum Archeologiczne i Etnograficzne w Łodzi | Published January 21, 2017  -  Deadline February 27, 2017

The contract is for the service to develop a comprehensive multi-branch project documentation and estimate the seat of the museum, along with obtaining a final decision on the permit for construction works with the service perform author's supervision during construction, involving the renovation, reconstruction and expansion of the existing complex of buildings A, B, C, D, E Museum of Archaeology and Ethnography in Lodz, together with the development of the courtyard (property entered in the register of monuments of the Lodz region under the number a / 373), according to the documents held by the Employer constituting attachments to this contract, in particular the description of the object of the contract.

Develop a comprehensive, multi-branch design documents and cost estimate with obtaining a final decision on the permit for construction works and the service performing author's supervision in the framework of the project entitled. "The modernization of buildings" A "," C "and space Museum of Archaeology and Ethnography in Lodz," located at Pl. Freedom 14, 91-415 Lodz.

A detailed description of the contract is given in Annex No. 9 to the SETC Description of the order for Part I.

Develop a comprehensive, multi-branch design and estimate documentation and obtaining the final decision on the permit for construction works and the service performing author's supervision in the framework of the project entitled. "The modernization of buildings" B "," D "," E "and the rooms and the courtyard of the Archaeological and Ethnographic Museum in Lodz" located at pl. Freedom 14, 91-415 Lodz

A detailed description of the contract is given in Annex 10 to the Terms of Reference The terms of reference for Part II.

Architectural, engineering and surveying services

Gmina Miasta Toruń | Published December 15, 2016  -  Deadline January 23, 2017

Implementation of multi-branch project documentation project titled.

The road Starotoruńska in timber harbor in Torun

Wyszynski 15 in Torun

Garden 3/5 in Torun.

1.Zakres project documentation includes:

- Construction of a multipurpose sports field (football, volleyball and basketball) with dimensions of 44x22 m, the surface does not require maintenance, eg. A flexible mat plus grass filled EPDM rubber granulate original black,

- Complete equipment to ensure the functioning of the multifunctional court,

- Fencing off with two goals lockable and piłkochwytami,

10m 2 .

- Lighting field LED lamps, including power energy

- Benches 4 pcs., Along with baskets for rubbish,

- The area of ​​the pitch to connect in communication with adjacent land development.

Guidelines for the implementation of the agreement:

The road Starotoruńska in Torun, and others that will arise eg. The issued connection conditions to the infrastructure,

- The area covered by the project is designated in the zoning plan as Z26bU (RMT Resolution No. 243 dated 30.10.2003 is annexed hereto)

- All designed to work materials should be used for standard adequate for the type of objects,

- Materials and technologies adopted by the designer should have specified the required technical parameters and criteria to be met to ensure the equivalence of materials,

420 000 PLN gross.

- In the framework of the project should be provided for the development of multimedia presentations made.

The list of studies included in the object of the contract:

1) conceptual design (including land development),

2) construction project containing all design elements executive branches at least architectural and building and electrical installations,

3) green inventory to the extent required for the implementation of the project (if required)

4) information on safety and health,

5) technical specification of execution and acceptance of construction works (all branches) + electronic version (pdf + editable version)

6) The bill of quantities + electronic version (pdf format and ath)

7) The investment cost estimate + electronic version (pdf format and ath)

8) summary statement of the total cost of investment ( "ROCE")

9) design documentation, also in electronic format PDF and DWG (AutoCAD 2008).

The scope of the project documentation includes:

- Modernization of the pitch surface of polyurethane,

- Area lighting LED lamps and monitoring the area range according to the opinion SM Na Skarpie (annexed hereto)

- Stadium seats 2 x 10 pcs., Plus rubbish bins,

- Gates for handball,

- Tables basketball 4 pcs.

- Around the pitch surface of colored concrete blocks,

- Galvanized fence panel coated in green kolorzez h-4m (rod gr.5mm)

- Piłkochwyty behind the goals on the width of the pitch,

- Lockable gates (opening to the center if the provision allows) 2 pcs.

- An array of rules at each gate,

- Playground designed to be linked with the existing land development.

Guidelines for the implementation of the agreement:

- All designed to work materials should be used for standard adequate for the type of objects,

- Materials and technologies adopted by the designer should have specified the required technical parameters and criteria to be met to ensure the equivalence of materials,

- Cost of the proposed works to the amount of 300 000 PLN gross

The list of studies included in the object of the contract:

1) conceptual design (including land development),

2) construction project containing all design elements executive branches at least architectural and building and electrical installations,

3) green inventory to the extent required for the implementation of the project (if required)

4) information on safety and health,

5) technical specification of execution and acceptance of construction works (all branches) + electronic version (pdf + editable version)

6) The bill of quantities + electronic version (pdf format and ath)

7) The investment cost estimate + electronic version in pdf format and ath)

8) summary statement of the total cost of investment ( "ROCE")

9) design documentation, also in electronic format PDF and DWG (AutoCAD 2008).

The scope of the project documentation includes:

- Outdoor gym located on the local hardening of the cube type Polbruk,

- Double track with a synthetic surface 100 mb,

- A running start to jump out of the sandbox,

- A place to throw

Architectural, engineering and surveying services

Generalna Dyrekcja Dróg Krajowych i Autostrad Prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Poznaniu | Published December 21, 2016  -  Deadline February 1, 2017

The contract is for marking witness "PD" borders lane sections of national roads No. 12, 12g, 24 and 32 administered by GDDKiA Branch in Poznan in separate parts:

Part I - including DK 12 from km 154 + 076 to km 163 + 571 and from km 170 + 569 to km 200 + 731 - Leszno Region;

Part II - including DK 12 from km 200 + 731 to km 213 + 479 and from km 220 + 069 to km 238 + 918 and DK 12g from km 0 + 000 to km 5 + 067 - Region Wednesday Wielkopolski.

Part III - including DK 24 from km 0 + 000 to km 30 + 271 and DK 32 from km 89 + 945 to km 155 + 608 - New Tomyśl Region.

The subject of this contract are the requirements for the implementation and acceptance of works associated with the stabilization of witnesses "PD" borders lane road with the resumption, in special cases, the determination of border points lane.

The present terms of reference are the requirements for the implementation and acceptance of works associated with the stabilization of witnesses "PD" borders lane road with the resumption, in special cases, the determination of border points lane.