Call +44 800 9755 164

Public tenders for architect, architecture in Norway

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Limited planning and design competition for Architect and Landscape Architect. 40 sheltered accommodations, zone office and day centre at Strømme in Kristiansand

Kristiansand Boligselskap KF and Kristiansand Eiendom | Published October 19, 2016  -  Deadline November 4, 2016
Limited planning and design competition for Architect and Landscape Architect. 40 sheltered accommodations, zone office and day centre at Strømme in Kristiansand.

Framework agreement for the procurement of architect services

Gran kommune | Published October 8, 2016  -  Deadline November 18, 2016

Framework agreements shall be entered into for the Procurement Cooperation for the Hadeland municipalities. The assignment can cover all types of services within architect services.

The framework agreements shall apply for Gran, Lunner and Jevnaker municipalities. The framework agreement shall be valid for 2 years with an option for an extension for 1 year at a time to a total length of maximum 4 years.

See the tender documentation for further information on the procurement.

Limited planning and design competition for an architect and landscape architect. 40 care homes, zone office and day center at Stromme in Kristiansand

Kristiansand Boligselskap KF og Kristiansand Eiendom | Published October 17, 2016  -  Deadline November 4, 2016
Limited planning and design competition for an architect and landscape architect. 40 care homes, zone office and day center at Stromme in Kristiansand

Framework agreement architect services

Time kommune | Published October 19, 2016  -  Deadline November 28, 2016

The client wants to conclude a framework agreement for the provision of architectural services to Time kommune.Avtalen shall include services related to:

New construction, extension, equipment and rehabilitation of:

• School buildings

• Kindergartens

• Assisted living

• Municipal Engineering

Architect Designing dagturhytte Sogn og Fjordane

Sogn og Fjordane fylkeskommune | Published October 6, 2016  -  Deadline November 19, 2016

Cooperation Project between Sogn og Fjordane county, Sparebankstiftinga Sogn og Fjordane and municipalities in Sogn og Fjordane. Ideal for architectural competition for the design of dagturhytte.

Vere shelter for ver and wind on both family outing and training trip. Inspire primarily families with children to experience near-outdoor life, stimulate and increase the desire to be more in the nature.

The cottage will be ein identity marker / EiT signature buildings in each municipality, but also strengthen the identity of total county as the cabin would have liked architectural expression in all 26 municipalities. This no matter where it is located, whether it stands by EiT lakes / sea, on top / below the top or half way to hiking destination. It must still be part of the cultural landscape and fall naturally into the building environment td ei seats / STØYLEN.

Tender host uploaded in Doffin innan the 10/19/2016

Engineering design services for a new clinic building at the Radiumhospitalet

Sykehusbygg HF | Published October 14, 2016  -  Deadline November 7, 2016

Architect and consulting engineering services for the implementation of a concept phase See the tender documentation.

The seafront 2 in Molde — consultants/engineering design group

Hammerø & Storvik Prosjekt AS | Published September 16, 2016  -  Deadline October 27, 2016

The Molde River's outlet shall be subject to river flow diversion by relocating the current river pier. The area from the new pier and further westward towards Torget (the Square) shall also be established. Molde municipality would thus like to engage a landscape architect, a landscape architect and consultant engineers within the following disciplines; consultant engineer geotechnics (RIG), consultant engineer civil (RIB), consultant engineer HVAC and water and sewage (RIV) and consultant engineer electro (RIE).

Framework agreement engineering design services

Oslo kommune Boligbygg Oslo KF [Oslo municipality, the Municipal Undertaking for Social Housing] | Published October 18, 2016  -  Deadline December 5, 2016

Boligbygg Oslo KF needs framework agreements for engineering design services. The assignments will include all the necessary disciplines required to prepare a complete preliminary project with calculations, tender documentation for a turnkey and execution contract, detailed engineering design services, applications/basic material for all the relevant public authorities, as well as being a coordinator for safety, health and working environment questions in the engineering design phase, in accordance with the builder regulations. This will be for building and construction projects, such as wet room renovations, facade renovations, fire protection measures, re-roofing, new buildings, renovations, welfare+.

Tenderers must be able to offer all disciplines: engineering design group manager, coordinator for engineering design services, architect, interior architect, landscape architect, responsible applicant, consultant engineer for building techniques, HVAC and climate techniques, electro techniques, fire safety, geotechnics and engineering geology, water and sewage techniques, acoustics, antiquarian conditions, environment and consultant integrated technical building installations, BIM-coordinator, DAK-operator and secretary, either internally or with the use of sub-suppliers.

Engineering design in connection with the renovation/reconstruction/clearance/construction of a school and sports hall

Bindal municipality | Published October 8, 2016  -  Deadline November 9, 2016

Bindal kommune has undertaken the renovation/reconstruction of Terråk school and construction of a new sports hall in connection to the school. Terråk school was built in 1972 and currently consists of 2 school buildings. Elementary school (first to fourth grade) and primary and lower secondary school (fifth to tenth grade), including gymnasium/community centre. Beyond this there is a separate administration building of newer origins that is not included in the project.

The current primary and lower secondary school shall be renovated, reconstructed and extended so that it houses all of the grades (one to ten). The current elementary school shall be cleared. The elementary school shall be in operation during the construction period.

TEK 10 shall be used in all disciplines.

In connection with the above, the Contracting Authority desires the establishment of an engineering design team that shall report to the coordinating project manager (architect) who shall ensure all disciplines connected with preliminary engineering design and detailed engineering design of the project.

The following services are requested:

— Coordinating project manager (Architect) (ARK);

— Civil Engineer Consultant (RIB);

— Electro Engineer Consultant (RIE);

— HVAC Engineer Consultant (RIV);

— Fire Engineer Consultant (RIBr);

— Acoustic Engineer Consultant (RIAku);

— Landscape Architect Consultant (ARK-Landscape).

Responsible applicant as well as an environmental clearance report shall be included and coordinated by the engineering design manager or the person designated to take care of this.

The engineering design comprises the preliminary project, detailed engineering design, follow-up during the construction and during the one year warranty period.

Module building Kalnes

Sykehuset Østfold HF [Østfold Hospital] | Published October 20, 2016  -  Deadline November 1, 2016

Prices are wanted for the procurement of new modules that shall fulfil the regulatory requirements in TEK 10. The modules shall house a total of approx. 80 — 85 work places. There shall also be a meeting room, kitchen, toilets and technical room. The total area required is approx. 950 m² distributed over two floors. Allowance shall be made for work places in accordance with universal design on both floors. The module system shall fulfil applicable laws and regulations, including the Workplace Regulations. The planned moving date is as soon as possible and preferably by 1.3.2017.

The delivery also includes ground works, up and down rigging, adapted facade solution in accordance with architect drawings and connection to the necessary technical infrastructure (water, ventilation, electricity and ICT). The contracting authority will engage its own architect, who shall be the responsible applicant. The plan is that the chosen tenderer will take over the application function upon the award of contract. It is a prerequisite that the tenderer who is awarded the assignment, his consultants and sub-suppliers, have central certification or are able to fulfil the requirements in the building application regulations (SAK 10) §11 — Requirements for education and practice — with responsibility rights for:

— Responsible applicant (SØK);

— Responsible engineer designers (PRO);

— Responsible for inspecting the engineering design services (KPR);

— Responsible executors (UTF);

— Responsible for inspecting the execution (KUT).

The hospital shall be in normal operation during the construction phase. It is therefore important that there is focus on SHE (Safety, Health and Working Environment) throughout the entire construction period. The Contracting Authority will appoint an SHE co-ordinator in the engineering design and execution phase (KU and KP) as described in The Builder Regulation § 5.

Architectural and related services

Trondheim kommune [Trondheim municipality] | Published October 14, 2016  -  Deadline October 30, 2016
Architectural and related services

Architectural, construction, engineering and inspection services

Universitetet i Bergen [the University of Bergen] | Published October 18, 2016
Architectural, construction, engineering and inspection services

Framework agreement for architectural services

Time kommune (Time municipality) | Published October 22, 2016  -  Deadline November 28, 2016

The Contracting Authority wishes to enter into a framework agreement for architectural services for Time municipality. The agreement shall also include services related to:

New buildings, extensions, additions and renovation of:

— School buildings.

— Nurseries.

— Sheltered accommodations.

— Municipal buildings.

Climate building — Natural History Museum — Multi-disciplinary engineering design group

Universitetet i Oslo (The University of Oslo) | Published October 21, 2016  -  Deadline November 14, 2016

A climate centre shall be established at Tøyen, later called the ‘Climate Building’. The project aims to communicate knowledge on climate to a wider public. The centre shall be built as an integrated site. Both the building and exhibition are included in the project.

The centre shall be owned by UIO, NHM shall manage the exhibitions and UMOE (c/o Jens Ulltveit-Moe) will contribute to the financing with a financial gift.

The centre will be located in the area south east of Brøggers hus in the Botanical Garden and it shall be integrated in the nearby technical and building environment. The centre shall be ready for operations April 2019. The total financial limit of the project is 70 000 000 NOK, excluding VAT.

The "Climate Building" will have the character of an experience centre that shall highlight the climate challenges we are facing in the near and distant future.

The concept ‘Climate Building’ shall communicate knowledge on the climate challenges and on possible solutions through exhibitions and through the building itself.

The interaction between communication and architecture is very important. New innovative communication concepts and architectonic expression are expected that put climate challenges clearly, powerfully and effectively on the agenda. The concept shall be flexible as regards communication concepts within an integrated general term.

In order to achieve this, a restricted contest shall be held with negotiations with multi-disciplinary engineering design groups. The negotiations will be held in several phases with 3-5 tenderers, with ‘parallel assignments’ in the first phase. The evaluation of the contributions will be made on the basis of the given award criteria in the coming tender documentation.

An engineering design contract for the sketch project and the preliminary project will be signed with the winner of the competition. The systems that shall be developed shall be developed after the competition in close cooperation with the university's entities.

The plan is for one delivery for the Climate Building, where the building and exhibition is one or two turnkey contracts. The engineering designers shall have this in mind. The engineering design group shall prepare the price enquiry (tender documentation). The engineering design group will be transported in its entirety to the turnkey contractor(s) when the contract is signed.

The contracting authority's intention is that the project is realised in its entirety, but it is subject to the project being interrupted after tenders from the contractors for the total delivery/ies have been assessed.

16/1279 — Prequalification — Framework agreement for ICT consultancy services

Statistisk Sentralbyrå [Statistics Norway] | Published October 8, 2016  -  Deadline November 3, 2016

The procurement's purpose

ICT functions in SSB come under the Department for Digitalisation and Joint Functions, together with functions for Data Acquisition and Methods (DoF). These together make up a considerable part of SSB's activities. We are carrying out a number of development projects and are responsible for the development, management and operation of IT systems for data acquisition, the production of statistics, analyses and communication. Our ICT environment has more than 100 employees within DoF. The department has broad competence within IT architecture, web and database technology, as well as general software development.

Our projects are largely based on flexible development methodology, free software and open standards. Our management routines are largely based on iterative management cycles. SSB now faces a comprehensive programme of digitalisation and modernisation of SSB's work processes and the DoF Department will have a central initiator role in this work. The department must be able to manage a number of modernisation projects parallel with further management and controlled clearance of old systems.

The modernisation work will be organised as a multi-year programme, broken down to several projects that shall deliver independent contributions in order to achieve SSB's main target of a flexible, efficient and user orientated production platform. The programme is carrying out a pre-analysis in 2016, in which a delivery and implementation strategy is prepared and initiatives, including the project portfolio, are described. Further preparations, maturing and detailed planning shall be carried out in 2017. The tentative start of the modernisation is set for 2018.

A programme function will be responsible for an efficient implementation of the modernisation at an acceptable risk profile. The modernisation of the statistics production is a complex business run project, which has major requirements for planning, a description of activities and projects, as well as the ability to manage and deliver changes that affect both work processes, systems and technology. The need for separate contracts for this commitment will be assesed for the ongoing planning of the modernisation work.

Parallel to this, SSB needs to hold a competition for framework agreements for ICT consultancy services for the following service areas:

— IT Project and test management.

— System development.

— Security.

— IT-Governance.

— ICT Operation and infrastructure.

Tenderers who are engaged through these framework agreements can be pulled into both the modernisation and assignments for management and operation.

Qualification for parts of the assignment is allowed, i.e. send a request to submit a tender for one or several of the service areas. The services areas will be evaluated separately.

The Contracting Authority uses Mercell Sourcing Service. To express your interest and gain access to any documents, please click on the link below or copy and paste the link into your browser. [[]]. Then follow the instructions on the website.

Framework agreement for the purchase of architectural professional services

Gran kommune | Published October 4, 2016  -  Deadline November 18, 2016

Shall be entered into framework agreements for Innkjøpssamarbeidet for Hadeland municipalities. The mission could include all types of services within architectural services.

The framework agreements will apply to municipalities Gran, Lunner and Jevnaker. The framework agreement will have duration of 2 years with a possible extension of one year at a time until the total duration of a maximum of 4 years.

See tender documents for further description of the procurement.

Consultancy and architectural services to sketch for the construction of housing for people with disabilities

Eidsberg kommune, Eiendom og beredskap | Published October 7, 2016  -  Deadline October 31, 2016

Preparation of sketches for architectural solution, general principles for technical solutions and cost estimates will be obtained. This is done by preparing space programs based on identified needs. Make a comprehensive assessment of the area's buildability, sustainability and anchoring the Housing Bank funding. It is important that elaborate sketches see the area as a whole and not just for built isolated.

Framework agreement engineering services

Oslo kommune Boligbygg Oslo KF | Published October 13, 2016  -  Deadline December 5, 2016

Residential Oslo KF need framework agreements for design services. They comprise all the necessary disciplines to develop a full feasibility study with cost estimate, tender documents for total and execution contracts, detailed design, applications / substrate material for all relevant public authorities, as well as coordinator for safety, health and working environment issues in the project in accordance with building regulations. This in connection with construction projects such as våtromsrehabiliteringer, facade renovation, fire precautions, takomlegging, new construction, rehabilitation, care +.

Providers must offer all disciplines; engineering group leader, coordinator of engineering, architect, interior designer, landscape architect, responsible applicant, consulting engineering construction engineering, building physics, HVAC and climate engineering, electrical engineering, fire safety, geotechnical and engineering geology, water and wastewater engineering, acoustics, antiquarian, environmental and adviser integrated building automation , BIM coordinator, CAD operator and secretary, either internally or by subcontractors.

Waterfront 2 Molde - consultants / engineering group

Hammerø & Storvik Prosjekt AS | Published September 12, 2016  -  Deadline October 27, 2016

Molde river to the east to be changed by moving the current river breakwater. Furthermore it should be in the range of new breakwater and further west towards Market established new waterfront. Molde municipality wishes in that regard to engage a landscape architect and engineering consultants in the following areas; consulting engineering geotechnics (RIG), consulting engineering Civil Engineering (RIB), consulting engineering plumbing and VA (RIV) and consulting engineering electrochemical (RIE).

Designing in connection with the renovation / reconstruction / restoration / construction of schools and sports

Bindal kommune | Published October 5, 2016  -  Deadline November 9, 2016

Bindal Municipality has approved the renovation / reconstruction of Terråk school and construction of a new sports hall adjacent to the school. Terråk school listed in 1972 and currently consists of two school buildings. Primary 1-4 PM. and secondary 5-10 kl. including gymnasium / community center. Beyond this separate administration building of newer date not included in the project.

Today's middle school to be renovated, rebuilt and built upon so that it can accommodate all grades (1-10 at.). Today's primary school should be decontaminated. During the construction period shall elementary school in operation.

TEK 10 shall be used in all subjects.

In connection with the above desired establishment of engineering team headed by coordinating project (architect) to safeguard all subjects related to preliminary and detailed design of the project.

The following services are requested:

- Coordinating engineering manager (Architect) (ARK)

- Consulting Engineers Building (RIB)

- Consulting Engineers Electrical (RIE)

- Consulting Engineers HVAC (RIV)

- Consulting Engineers Fire (RIBR)

- Consulting Engineers Acoustics (RIAku)

- Advisory landscape architect (ARK Landscape)

Responsible applicant and environmental report to be included and coordinating engineering manager or whoever he appoints to safeguard this.

The configuration includes preliminary, detailed design, supervision during construction and warranty period of 1 year.