Call +44 800 9755 164

Public tenders for architect, architecture in Netherlands

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!
ArchitectureNetherlands

Architectural, construction, engineering and inspection services

Schiphol Nederland BV | Published January 18, 2017  -  Deadline February 27, 2017
cpvs
71000000

The Terminal project consists of the design and construction of a new terminal building. The size of the terminal is approx. 100 000 m2 and will have a capacity of approx. 14 000 000 passengers per year.

With this tender SNBV wishes to find the best-in-class architect-led engineering design team. This design team must be able to fully understand the complexity of the programme to present a design of the terminal where exceptional processes and spaces meet the conscious and unconscious needs of our travellers.

The architect-led, engineering design team to be selected must deliver a design of the new terminal that will exceed everyone's expectations, both in the Netherlands and abroad. The main objective that needs to be achieved by the design team is to deliver a full and fully integrated design of the terminal building which harmoniously blends with its surroundings. This full and fully integrated design of the terminal must include: architecture, interior (FF&E), MEP, structure, all building systems, BHS, all IT systems, APM (space allocation), signage and wayfinding, etc. The full design of the terminal (Masterplan design, Preliminary design, Detailed design and Technical design) must to completed in Q1/2019.

N.v.t.

Integrated design terminal Area-A Schiphol - Schiphol Nederland BV

Schiphol Nederland BV | Published January 12, 2017  -  Deadline February 27, 2017
cpvs
71000000

The Terminal project consists of the design and construction of a new terminal building. The size of the terminal is approx. 100,000m2 and will have a capacity of approx. 14,000,000 passengers per year. With this tender SNBV wishes to find the best-in-class architect-led engineering design team. This design team must be able to fully understand the complexity of the programme to present a design of the terminal where exceptional processes and spaces meet the conscious and unconscious needs of our travellers. The architect-led, engineering design team to be selected must deliver a design of the new terminal that will exceed everyone’s expectations, both in the Netherlands and abroad. The main objective that needs to be achieved by the design team is to deliver a full and fully integrated design of the terminal building which harmoniously blends with its surroundings. This full and fully integrated design of the terminal must include: architecture, interior (FF&E), MEP, structure, all building systems, BHS, all IT systems, APM (space allocation), signage and wayfinding, etc. The full design of the terminal (Masterplan design, Preliminary design, Detailed design and Technical design) must to completed in Q1/2019.

Qualification marketplace external personnel in the field of Information Management and architecture - KING

 | Published March 2, 2015  -  Deadline March 1, 2019
cpvs

not to give in advance to

Supply services of personnel including temporary staff

KING Kwaliteits Instituut Nederlandse Gemeenten | Published March 7, 2015  -  Deadline March 1, 2019
cpvs
79620000

This notice involves the establishment of a marketplace external personnel on the field information management and architecture.

Architectural, construction, engineering and inspection services

TenneT TSO BV | Published February 10, 2017
cpvs
71000000, 71300000, 71310000, 71311000, 71311100, 71312000, 71314000, 71320000, 71600000

The scope for this Tender concerns the demand for Client Representatives for the COBRAcable project and the WoZ projects.

Locked restricted procedure.

Locked and restricted procedure.

Architectural, construction, engineering and inspection services

Ministerie van Economische Zaken, Rijksdienst voor Ondernemend Nederland (RVO.nl) | Published February 24, 2017
cpvs
71000000, 71300000, 71351000, 71600000

Beginning of April 2017 a tender will be published. The objective of this tender is to conclude an agreement with a tenderer who is able to carry out the geophysical investigations required to obtain the soil information at the Wind Farm Zone Hollandse Kust (Noord). This soil information will be made available to all potential bidders for offshore wind farms in the Netherlands.

The objective of the geophysical soil investigation is to improve the bathymetrical, morphological and geological understanding of the wind farm zone and identification of objects in the designated wind farm zones and to obtain geophysical information on these locations, which is suitable for the preparation of geotechnical investigations and suitable to progress the design and installation requirements for offshore wind farms, including, but not limited to foundations and infield cables.

The work has to be executed in the Hollandse Kust (noord) Wind Farm Zone.

It is envisaged that around 700 MW of wind energy will be installed in the Hollandse Kust (noord) Wind farm Zone.

Marketplace hiring staff Twence - Twence BV

Twence B.V. | Published August 11, 2016  -  Deadline December 31, 2020
cpvs
79620000

Registration can be done for one or more of the following categories: Administrative and Secretarial automation and ICT Policy and advisory architect (civil) engineer (civil) project building and civil engineering, communication and PRFinancieel; controller, assistant AO Housing and facility; facilities employee, consultant sourcing and marketing salesInterim- and projectmanagementJuridischHR, Personnel and organization; HRM adviseurQHSE & S; environmentalists, waste inspectors, QA staff, security skilled logistics; shovel operator technique; WTB; engineer, mechanic wtb, planner, tekenaarE; E engineer, planner E cartoonist process operator 
If it is chosen to compete for a contract, the supplier will be able to do through the 'Marketplace hiring Twence' offers will generally be assessed on criteria such as: education, experience, competencies, skills and price.
On admission to the marketplace can not create any entitlement to commands.

Supply services of personnel including temporary staff

Twence Holding BV | Published January 6, 2016  -  Deadline December 31, 2020
cpvs
79620000

Registration can be done for one or more of the following categories: administrative and secretarial, automation and ICT policy and advisory architect (civil) engineer (civil) project, construction and civil engineering, communications, information and public relations, finance; controller, AO employee housing and facilities; facilities employee, consultant, purchasing, marketing and sales, interim and project management, legal, HR, personnel and organization; HRM advisor, QHSE & S; environmentalists, waste inspectors, QA staff, safety expert, logistics; shovel operators, technology; WTB; engineer, mechanic wtb, planner, artist E; E engineer, planner E, draftsman, process operator. If it is chosen to compete for a job, the supplier may do so using the 'Marketplace hiring Twence' offers will generally be assessed on criteria such as: education, experience, competencies, skills and price. Admission to the marketplace can not create any entitlement on assignments.

Architectural, construction, engineering and inspection services

Rijksvastgoedbedrijf | Published January 21, 2017  -  Deadline March 14, 2017
cpvs
71000000, 71400000

Information can be found on www.prijsvraagwhocares.nl

Architectural, construction, engineering and inspection services

Rijkswaterstaat Corporate Dienst | Published July 6, 2016  -  Deadline June 30, 2020
cpvs
71000000, 79000000

Dynamic purchasing system for the hiring of external capacity and expertise in the areas of engineering services and operations.

Architectural, construction, engineering and inspection services

Gemeente Veghel | Published January 27, 2017  -  Deadline March 14, 2017
cpvs
71000000

Engineering and consultancy in the field of civil and agricultural engineering as designing, writing specifications, UAV (-gc) drawing up contracts and assist in implementation, carry out studies, research, calculations and related services related to the project Veghels Pool.

Architectural, construction, engineering and inspection services

Gemeente Overbetuwe | Published February 23, 2017  -  Deadline April 27, 2017
cpvs
71000000

The current traffic engineering structure Elst includes a ¾ tangential route. The last part of this tangential structure, the ring road in the northwestern part, is not necessary in the next 10-15 years. However, the main road North should then have sufficient flow-through funds. This is achieved by letting the ground crossing railway crossing Highway fly-North (underpass) and to the railway crossing in the 1st Weteringsewal also flyovers (overpass). Additionally should be taken accompanying measures on the access roads to the railway crossings.

See Quotation engineering European public procurement and advisory services "Trace Crossings Elst North".

Architectural, construction, engineering and inspection services

Gemeente Den Haag | Published February 17, 2017  -  Deadline March 20, 2017
cpvs
71000000, 71700000

The Hague is within its source containers borders, source holder for the SLS +. In The Hague, a BGT + tracked with a large number of point objects. It is also important to realize that the Hague BGT + has a higher precision than the national standard. The BGT + is the basis for many municipal and non-municipal processes. Caring for the update is the responsibility of the team Geodata Department of Geo-information and Leasehold Business, Department of Urban Development.

The BGT + is an Oracle database that is managed by dgDIALOG BGT. Part of the management is to actively search for the differences between the map and reality. These mutations we identify to go by foot through the Hague, the district explorations. We compare the topography with the annual aerial and we collect the messages that we receive. These mutations are collected and given to measuring teams doing the mutation measurements for us.

The wijkv ...

A third of the city should be explored by year to meet the current bijhoudingseis of 3 years. The Hague consists of approximately 8561 hectares. Of this is 1077 hectares of sea and 723 hectares of green area. These hectares we not explore on foot. Every year about 200 hectares involved in a recent inmeting. Thus, the prognosis to be explored around (6 561/3 =) 2 187 hectares per year.

The Hague processed the last few years, every year around 80 000 terrestrial points. The past year (2016) there are approximately 180 measurement projects defined, ranging from 10 to 2 500+ points, with an average of 87. The forecast for the coming years is that the number of mutations and points to remain stable to 80 000 measuring points .

It will go on this plot at approximately 1000 hours per year. The risk that decreases the work in the period 2018-2020 and there is no work. This question we can tune every six months.

Architectural, construction, engineering and inspection services

ProRail BV | Published February 25, 2017  -  Deadline March 27, 2017
cpvs
71000000

The project concerns the quality inspections of a dozen items from ProRail yards. The objective is the national insight into the quality deltas of the objects in relation to the desired situation. In the preferred situation, the objects are functional, safe to use and maintain. If not met the required quality should the related measures and costs to be made transparent. The recording results serve as a framework for ProRail to develop long-term plans for maintenance and replacement of the objects.

The locations are geographically dispersed across the Netherlands but only concern objects Railway yards. The following objects are within the scope of the project:

1. Extinguish Decrease / fill hydrant;

2. Key Fire Safe;

3. Sewage discharge;

4. Compressed air system;

5. Rembeproevingsinstallatie;

6. Service;

7. pavements;

8. Outdoor lighting;

9. Wash / vulhydrant;

10. Vane;

See Prep ...

See brief description.

Architectural and civil engineering maintenance - Hunze and Aa

Waterschap Hunze en Aa's | Published February 24, 2017
cpvs
45220000

With this notice, we want to alert potential bidders timely manner following market scheduled meeting. The market information meeting aims to inform the interested market in this mission and to consult the market. Date and time: from 10:00 to 11:30 Monday, March 13th, 2017. Address: aquapark 5, 9641 PJ Veendam If you wish to attend this meeting, you must give yourself no later than Wednesday, March 1st at 12:00 by specifying the following number of people (maximum 2) name or names, function, email address, telephone number and organization. Relevant information should be sent to: tender@hunzeenaas.nl, Attn Marline Wolda, to sign stating: "Registration information meeting architectural and civil engineering maintenance". The tender documents are expected to be published no later than Friday, March 24, 2017.

IT services: consulting, software development, Internet and support

Hoogheemraadschap Hollands Noorderkwartier | Published January 21, 2017  -  Deadline February 27, 2017
cpvs
72000000

The contract includes integration services for the information of Water Board Hollands Noorderkwartier. Integration services include technical realization of integration, functional design and integration design integration architecture with the WSO2 Enterprise Service Bus as well as providing support to the already comprehensive services.

See tender documents.

Framework agreement ICT integration services WSO2 Enterprise Service Bus - Water Board Hollands Noorderkwartier

Hoogheemraadschap Hollands Noorderkwartier | Published January 17, 2017  -  Deadline February 27, 2017
cpvs
72000000

The contract includes integration services for the information of Water Board Hollands Noorderkwartier. Integration services include technical realization of integration, functional design and integration design integration architecture with the WSO2 Enterprise Service Bus as well as providing support to the already comprehensive services.

EA architectural, electrical and mechanical work Technohal University of Twente - University of Twente

Universiteit Twente | Published February 23, 2017  -  Deadline March 27, 2017
cpvs
45000000

The University of Twente intends to renovate the Technohal (approximately 12,000 m2 GLA) for the achievement of Health and COV (Corporate Education Services). This building will be developed for offices, labs and lecture halls. The University of Twente aims to start building the academic year 2018 - 2019 to be in use. This tender is structured as follows Negometrix: 1 main tender and three lots. General questions should be answered in the main tender. Plot specific questions should be answered individually in each plot. Candidate must at the time of Registration / Submission always submit his proposal vwb the main tender and the "chosen" by him lots.

Recreational-area services

Gemeente Steenbergen | Published February 23, 2017
cpvs
92330000

The individual components are then mutually connected recreational. 

For more information: www.prestatieinkoop.com

The methodology aims to find a contractor who will realize the intended end result with maximum ...

The following four themes are to be achieved:

West Brabant Water Line;

2. architect theme;

3. A theme directed at children 4-12 years old;

4. to be completed by the contractor.

The developed thematic cycling and walking routes should be maintained for ten (10) years.

Besides serving entrepreneurs and other interested concrete possibilities to be offered to participate.

The contracting authority has the ceiling price ...

Architectural and installation engineering contractor - Stichting ROC Leiden, Center for Education and Vocational Education in the Region of Leiden and Dune & Bulb region

Stichting ROC Leiden, Centrum voor Educatie en Beroepsonderwijs in de Regio Leiden en Duin & Bollenstreek | Published January 20, 2017  -  Deadline March 3, 2017
cpvs
45000000

The contract to pay is defined as follows: The total project involves the conversion of a total of 11 floors with a size of approximately 18,000 m2 of lettable area. The changes will be gradually implemented in accordance with the following global planning. This plan no rights can be derived. Phase 0: 4th floor, approximately 1,500 m2 (already done) Phase 1: 9 and Part 8th floor, approximately 2,500 m2 (version May - June 2017) Phase 2: Part 8th floor, 7th floor and part 5th floor, approximately 4,000 m2 ( implementation July August 2017) Phase 3: 6th floor, approximately 2,500 m2 (version september - October 2017) Phase 4: part 5th floor, part 2nd, 3rd, 4th, floor, approximately 3,000 m2 (execution in december 2017 - January 2018) Phase 5: part 3rd, 2nd, 1st, mezzanine, ground floor, approximately 3,000 m2 (version april - July 2018) Stage 6: remaining share common spaces, 1,500 m2 (version June - July 2018) Lot 1 (building contractor) • The in a construction team to contribute to the design of the structural changes to the location Lammenschans; • Achieving structural adjustments to the location Lammenschans; Lot 2 (technical installation contractor) • Contribute in a construction team to design the installation technical adjustments to the location Lammenschans; • Realizing installation technical adjustments to the location Lammenschans;