Public tenders for landscape-planning in Switzerland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

N02 / N14, 100054, overall system Bypass Lucerne, urban / landscape planning management; phases AP / MK, PGV incl., and DP / MP

Office fédéral des routes OFROU Succursale de Zofingue | Published February 16, 2017  -  Deadline December 12, 2016
cpvs

N02 / N14, 100054, overall system Bypass Lucerne, urban / landscape planning management; phases AP / MK, PGV incl., and DP / MP

Architectural, construction, engineering and inspection services

Kantonales Tiefbauamt | Published February 2, 2016  -  Deadline March 11, 2016
cpvs
71000000

Planning services (project management, project management, construction management, space and landscape planning, environmental planning) for clasp Hofen and remodeling Winterthurerstrasse for SIA phases 31-53.

Submission Planning Services Local Planning Revision 2020

Gemeinde Belp vertreten durch die Abteilung Bau | Published October 28, 2014  -  Deadline January 9, 2015
cpvs
75100000

Implementation of spatial planning revision with a planning team with proven expertise in the fields of: - Development, Urban Planning and Architecture - Transport Planning - Landscape Planning - Energy Planning The exact job description can be seen in the documents.

N04, 110016, conservation project Rütihof intersection - Connection Küssnacht, project authors noise

Bundesamt für Strassen ASTRA Filiale Zofingen | Published September 22, 2016  -  Deadline November 1, 2016
cpvs
71322500

The conservation project N4 Rütihof - Küssnacht provides perform at Trassee and engineering works in the period from 2022 to 2023 repair and reinforcement work and thus to make sure the hands-off operation for the next 15 to 20 years. In addition, subsequent restructuring noise in the project perimeter, the execution (implementation) of an AP noise in the municipality Küssnacht (AP is already available), and the construction of a new SABA and a new wildlife overpass.
Contract for the section N4 Rütihof intersection (km 99.2000) to the cantonal border ZG / SZ (km 105.000) and the section N14 of the Canton boundary AG / ZG (Reussbrücke) until the end of the N14 are all services for the development of the AP noise, monitoring (support ASTRA) the plan approval process and the preparation and the completion of relief requests. The municipal area Küssnacht which is already covered by the EP N4 Küssnacht - to realize elaborate fountain AP noise. Agent VOMA is to strive for the implementation of the AP noise Küssnacht up of 2019. During all phases of the project work with the other designers are to be coordinated.
The project authors building / BSA accepts the conservation project N4-Rütihof - the technical coordination Küssnacht.
For the following topics separate project authors mandates are advertised Construction / BSA, Wildlife corridor / slope safety, environmental, transport planners, landscape planning / Wildlife Biology and fault (see organization chart).

N04 110016 conservation project Rütihof intersection - Connection Küssnacht, project author Construction / BSA

Bundesamt für Strassen ASTRA Filiale Zofingen | Published June 24, 2016  -  Deadline August 30, 2016
cpvs
71322500

The conservation project N4 Rütihof - Küssnacht provides perform at Trassee and engineering works in the period from 2022 to 2023 repair and reinforcement work and thus to make sure the hands-off operation for the next 15 to 20 years. In addition, subsequent restructuring noise in the project perimeter, the execution (implementation) of an AP noise in the municipality Küssnacht (AP is already available), and the construction of a new SABA and a new wildlife overpass.
The present tender are the benefits of the project author (PV) and the local construction management (OBL) for the fields Trassee, engineering structures and BSA according to the performance described and technical manuals of ASTRA for all project phases from design project / measure concept up and repair / completion. This includes the rehabilitation of the trackbed and plant management (incl. vorgängiger electronic detection as a basis for planning), the repair of engineering structures (incl. Completion of triage engineering structures and static verification), configuring the SABA Fänn, optimizing SABA Rotkreuz with the reconstruction of the drainage (incl. collection of extraneous water inflow) and the repair of the BSA systems.
The project authors building / BSA accepts the conservation project N4-Rütihof - the technical coordination Küssnacht.
For the following topics separate project authors mandates are advertised: Wildlife corridor / slope safety, the environment, noise / acoustics, traffic planners, landscape planning / Wildlife Biology and fault (see organization chart).

Architectural, construction, engineering and inspection services

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Fachstelle für Submissionen | Published February 21, 2015  -  Deadline April 1, 2015
cpvs
71000000

The shooting range Allschwiler pond created in 1899 on agricultural land. The first phase of development was carried out in 1910-11, the second between 1940 and 1044. 1949 was a third phase of development will be completed and 1967 was the gunman passed as a final extension of 25 meters plant. By eliminating the "compulsory shooting operation" of the shooting operation after 100 years has pretty much been in November 2008. The last shooting club is the area leave the end of 2015. Neighborhood and environmental organizations have multiple uses claims for the former shooting range area. 2010 Basel property. - City Government a comprehensive strategy for the future use of the site "for shooting at Allschwiler Weiher" submitted. After mid-2012, a test plan was completed, funding for the development of landscape design ideas were shared and a feasibility study. It has been defined a landscape area Allschwil. It includes Subproject 1: Landscape space Allschwiler pond; Project 2: Rehabilitation of the shooting range; Project 3: revitalization of Dorenbaches; Subproject 4: Modification of the shooting stand. Based on the preliminary landscape planning Allschwiler pond is to be implemented in the years 2016-2019. A higher-level open space concept is to reduce the pressure on sensitive areas and enable concentrated use of open space in less sensitive areas. The Allschwiler in the landscape pond to be planned landscape park is to preserve the openness, vastness of today's topography and the peculiarities of the former shooting range.

Engineering-design services for traffic installations

Bundesamt für Straßen ASTRA Filiale Zofingen | Published September 24, 2016  -  Deadline November 1, 2016
cpvs
71322500

The conservation project N4 Rütihof

- Küssnacht stipulates the period 2022-2023 repair.

conduct and reinforcing work on Trassee and engineering structures and thus to make sure the hands-off operation for the next 15 to 20 years -. In addition, subsequent restructuring noise in the project perimeter, the execution (implementation) of an AP noise in the municipality Küssnacht (AP is already available), and the construction of a new SABA and a new wildlife overpass.

Contract for the section N4 Rütihof intersection (km 99.2000) to the cantonal border ZG / SZ (km 105.000) and the section N14 of the Canton boundary AG / ZG (Reussbrücke) until the end of the N14 are all services for the development of the AP noise, monitoring (support ASTRA) the plan approval process and the preparation and the completion of relief requests. The municipal area Küssnacht which is already covered by the EP N4 Küssnacht

- Well worked to implement AP noise. Agent VOMA is to strive for the implementation of the AP noise Küssnacht up of 2019. During all phases of the project work with the other designers are to be coordinated.

The project authors building / BSA accepts the conservation project N4-Rütihof

- Küssnacht technical coordination.

For the following topics separate project authors mandates are advertised Construction / BSA, Wildlife corridor / slope safety, environmental, transport planners, landscape planning / Wildlife Biology and fault (see organization chart).

planning mandate "SWISS Pavilion EXPO 2020 Dubai»

Présence Suisse PRS | Published August 9, 2016  -  Deadline September 5, 2016
cpvs
71200000

For planning mandate "Swiss Pavilion Expo 2020 Dubai," Presence Switzerland is seeking a qualified bidder to handle specialized fields Architecture, exhibition design / set design and landscape planning / external and possessing the required professional qualifications.
The contract partner is necessarily the company in charge of Architecture specialized field. For the execution of the warrant, that partner may appeal to designers and other contractors. The communities of bidders are not allowed.
The five bidders who submitted the top rated applications for participation will be invited to make an offer.
They will accompany their offer of a general concept of the Swiss presence at Expo 2020 Dubai and an offer amounting planning (subsequent market) as well as a budget for the construction and dismantling of the pavilion and the exhibition.
The planning mandate comprises the following parts.
There will be awarding their fixed and final when signing the contract:
• Complete overall concept for specialized areas Architecture, Outdoor space and Exposition
• Preparation of technical dossier call for tenders for the implementation phase and assistance in contracting for the evaluation of the call for tenders to companies
• Calculation of costs of construction and dismantling of the Swiss Pavilion and exhibition as well as operating costs (energy, water, maintenance)
The following parts will be assigned optionally in a second step:
• Implementation planning for architecture and outdoor spaces
• Execution Planning for the exhibition
• Monitoring of work / design direction
Provided they exceed the ordinary measure, the benefits provided to establish supply are compensated.

N02, 130045/130046/130062, wildlife crossings LU 2 Neuenkirch / LU 5 Langnau bei Reiden / LU 12 Knutwil, project authors

Bundesamt für Strassen ASTRA Filiale Zofingen | Published December 1, 2014  -  Deadline January 22, 2015
cpvs
71322000

The National Road N02 separates the section Rotsee branch connection to Reiden three wildlife corridors of national importance. The wildlife corridors LU 2 and LU Neuenkirchstrasse 5 Langnau-Reiden Knutwil should be made by a wildlife underpass to be created again by means of newly created wildlife overpasses and Wildlife Corridor LU 12. The wildlife underpass Knutwil is at 67,090 km, where the national road runs on an embankment realized. Subject of this tender are the engineering services as project authors for phases implementation project ASTRA up and commissioning / completion (WTK LU 2 Neuenkirchstrasse and LU 5 Langnau bei Reiden) or design project ASTRA up to and including detailed project (WTK LU 12 Knutwil) and monitoring the Project by specialists Landscape Planning / Wildlife Biology incl. design and construction supervision of the planting of the buildings and their immediate surroundings. Addresses the three wildlife crossings are 3 separate sub-projects. You do not run on the same time schedule (prioritization by the client, permanent approval procedures, etc.). The Client reserves the right to make the run phase realization of a sub-project by another contractor. This for ease of coordination with the parallel conservation project in the section Reiden - Sursee. The realization of wildlife crossings is planned from today's perspective for the years 2018 (WTK LU 12 Knutwil) or 2019-2020 (WTK LU 2 and LU Neuenkirchstrasse 5 Langnau bei Reiden). The detailed job description can be found in the contract document.
  • 1