Public tenders for landscape-design in Czech Republic

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural - landscape competition for young architects "Rozárka"

Statutární město Hradec Králové | Published July 25, 2016
cpvs

The tender process is architectural - landscape design solutions Rozárka locations in Hradec Kralove. The competition is looking for a suitable combination of the use of the cultural landscape, sport and relaxation.

Draft urban village concept Úholičky

Obec Úholičky | Published September 26, 2013
cpvs

The subject of competition is the strategy of territorial development, urban design and landscape design layout of the entire administrative area of ​​the village Úholičky formed administrative area Úholičky 773,239.

Recovery Park Jiráskovy set in Lito

Město Litoměřice | Published June 14, 2013  -  Deadline June 30, 2014
cpvs
45000000

The subject of a total restoration of the park, including green. Justification: The implementation of the reconstruction of the park authority will be granted funding from the Metamorphosis Foundation, which helps the development of urban green areas, involve the public and improve public awareness of architecture, landscape design and impact of the environment on humans.

City park: reconstruction of the park in the street of General Svoboda

Město Hrádek nad Nisou | Published May 9, 2014
cpvs

The subject of the public contract is a reconstruction of landscaped area along Liberty Street General Hradek nad Nisou on land p.č. 594/1, 600/1 and 478 k.ú. Hradek nad Nisou. The subject of the public contract is complete design services and supplies and associated works within the scope of project documents drawn up by Atelier garden and landscape design, designer Ing. Daniel Gross, 08/2013.

City park: reconstruction of the park in the street of General Svoboda.

Město Hrádek nad Nisou | Published May 13, 2014
Winner
JIB s.r.o.U Parku 2242Brandýs nad Labem-Stará Boleslav 250 01 jib@jib-zahradnik.czhttp://www.jib-zahradnik.cz/
cpvs
77300000, 77311000, 77313000, 45112711

The subject of the public contract is a reconstruction of landscaped area along Liberty Street General Hradek nad Nisou on land p.č. 594/1, 600/1 and 478 k.ú. Hradek nad Nisou. The subject of the public contract is complete design services and supplies and associated works within the scope of project documents drawn up by Atelier garden and landscape design, designer Ing. Daniel Gross, 08/2013.

Architectural design services

Liberecký kraj | Published April 22, 2017  -  Deadline September 11, 2017
cpvs
71220000

The subject of the "Parking house, bridge and cultivation vicinity of the Liberec Region" is the processing of architectural and landscape design modifications concourse near the seat of the Liberec Regional Authority (bullet).

It is expected the involvement of regional headquarters in the city structure, culture settlements around the region, with emphasis on high-quality landscape design of public space with plenty of greenery, walkways and design flow diagram Lusatian Neisse, organizations of all modes of transport, including solutions for parking stalls and parking house.

Further specification of the competition is given in the Building Program.

General requirements of the customer - building program:

- creation of a quality public space connected to the existing structure of the city,

- application of green and integration into rivers solved space;

- linking banks of the river Lusatian Nisa at the entrance to the building KI LK;

- ensure the required parking capacity (target state - 360 points / + parking garage parking on parterre + 2 points for charging electric vehicles);

- good transport connections to existing roads, including the involvement of the considered cycle routes;

- respect for the economic possibilities authority - estimated investment amounts to 67 million CZK.

Park for brewery

Město Vysoké Mýto | Published July 21, 2016
cpvs

The tender process architectural and landscape design solutions use of land in the former brewery, while respecting the intended purpose - a municipal park with a prevailing bias using to stay and relaxation in the countryside. The proposal must respect the conditions set by the competition, their attachments, as well as the economic possibilities of the organizer. The subject of the competition specifically related to land - p.č. 1922/2, p.č. 1922/3, p.č. 1922/4, p.č. 1927/1, p.č. 1927/2, p.č. 1927/3, all in cadastral High Toll, village Vysoke Myto. All the land in question, at the time of implementation of the proposal in the ownership of the promoter.

Regeneration of urban parks - 2nd repetition

Město Moravská Třebová | Published March 2, 2015
cpvs

The subject of the tender is described in detail in the project documentation called regeneration of urban parks (see Annex no. 2 tender documentation) prepared by the design office garden and landscape design sro, Ponávka 2, 602 00 Brno, ID 46344535, chief designer Ing. Jana Janíková and yet the bill of quantities - Blind budget (see Annex no. 2 of the tender documentation). In 2013, the contracting authority short list of a total of 5 locations to regenerate green urban parks. It consists of the following locations: Location no. 1 - Princely Louka: the street Jevíčská around the creek Třebůvka, Location no. 2 - Park Square on Rybním: Rybní Square Location no. 3 - Park at the Museum: the museum in the street Svitavské, Location No. . 4 - Lesopark: former landfill site at ul. Horticulture, Location no. 5 - square TG Masaryk.

Implementation of common facilities KPÚ Bravantice - 2 stage

Česká republika - Státní pozemkový úřad | Published June 17, 2013
cpvs

The subject of limit public works contracts is the construction of two major field trips, thirteen secondary country roads, restoration of streams, two polders, retention depressed areas and planting of greenery landscape. SO 01 Dry tank N1-dry reservoir is proposed in the technical flood protection measures to flatten the flood wave. Designed polder will have earth dam embankment. Construction sprinkled earth dam filter should be stable, with the leachate will be controlled due. SO 02 Dry reservoir tank dry N2-N2 is re-proposed in the technical flood protection measures to flatten the flood wave. Designed polder will have the same tank with N1 earth embankment dam. Construction sprinkled earth dam filter should be stable, with the leachate will be controlled due. SO 03 Catch-furrow seeping depressed areas are designed in a way that will capture surface water from torrential rainfall, which will be fed into the polders N1 and N2. This measure will lead to a reduction in peak flow over the built-up area of ​​the village Bravantice. SO 04 Revitalization Revitalization flow-flows (and casual) and reclamation of waste is designed so that the design as close as possible the original natural state. In the thalweg and reclamation of waste streams are designed cross damming type of earth shoots - height 0.5 to 1.0 m target state water will flow irregularly meandering valley depressions with a depth of channel width to 0.3 ms 0.2 to 0.3 meters . SO 05 Field Road P2-P2 Main field trip is designed single-lane, paved asphalt carpet in crown width of 4 m (P 4,0 / 30) for a traffic load V and VI of flexible pavements PN505, PN506, PN605 and PN606. Drainage is designed longitudinal marrow of a flexible pipe. SO 06 Landscape Planting Planting green-green landscape and its subsequent provision are divided into fifteen sub-interaction elements (IP) to approximate total area of ​​13.59 hectares. Providing green landscape design documentation is defined primarily as mowing grass, watering plants, educational and health cut and mulch the soil. Providing landscape vegetation will be implemented over a period of three (3) calendar months after completion of the construction work, including planting of greenery landscape. SO 07 secondary dirt roads-The performance of the subject contract will be implemented by the following construction of rural roads: Body unpaved roads will be built from earth borrow pits polders N1 and N2. Types of structural layers of the paved part of the way: SO 08 Field trip P4-P4 main dirt road is designed as a single-lane with turnouts, paved asphalt carpet in crown width 4 meters (P4, 0/30) for a traffic load V and VI of flexible pavements PN505, PN506 , PN605 and PN606. Drainage is designed longitudinal marrow of a flexible pipe. More information in the tender documents. The offer must be: a) a list of statutory bodies or members of statutory bodies, who in the last 3 years from the deadline for submission of tenders were in employment, functional or similar relationship with authority, b) if the supplier has a joint-stock company, a list of owners of shares the aggregate nominal value exceeding 10% of the share capital, established the deadline for submission of tenders, c) a statement by the candidate that has not entered into and conclude an agreement prohibited by special legislation in relation to procurement. Bids shall be submitted within the deadline for submission of bids, in 1 original and 1 Simply complete copy. Bids may be submitted in person to the professional adviser authority: Eurotender Ltd., King George Square 4 / I, (I.patro building staircase in the entrance of the building), 290 01 Poděbrady, in working

Strategies to protect against the negative impacts of floods and erosion phenomena of nature-friendly measures in the Czech Republic

Výzkumný ústav vodohospodářský T. G. Masaryka, veřejná výzkumná instituce | Published December 4, 2013
cpvs

Integrated project whose key output will be a coherent set of proposals for flood protection (PPO) and anti-erosion measures (PEO) close to nature on a specified part of the territory of the Czech Republic. Continuation of Article III.2.3) Technical capacity: add point. a) - min. 1 a Job on services in Proc. study close to nature protipov. thine. in the range min. catchment area of ​​200 km2 according to the principles set out in the Methodology OOV ME, which sets out the full solution protipov. and protieroz. ochr. using nat. close to thine. , which was published in the Journal of the Ministry of Environment (11/2008), the value updates. provide. he adds. is min. 2 million CZK without VAT. - Min. 1 a Job in services associated with the conse. applications and geographer. inform. systems in RA. water. economy., a lot. services provided. he adds. is min. 1 million CZK without VAT. The sponsor states that it is possible that one major contract to reflect their actual performance subject served to prove. and several refer. contracts from the list above. From the data supplied. However, the contractor must this fact, including meeting minutes. required volume clearly shows. add font. e) I. Team for strategic planning and optimization II. The design team III. Team hydrology and hydraulics IV. Team data and GIS operations • Members of research teams can simultaneously be members of more problem-solving teams (not the head of the research teams). Director of one of the team can not be simultaneously or head or another member of the implementation team, and this condition does not apply to the team for strategic planning and optimization, which is composed of the heads of the research teams and other specialists. • Each research team must be composed of a minimum of 4 persons - 1 head of the research team, one deputy head of the research team + 2 members of the team. • The applicant shall submit for each group solved problems List of members of the team in the table, see Appendix # 13 I. Team for strategic planning and optimization Members of the research team demonstrated together their technical qualifications obtained in the form of knowledge and experience in the following fields and areas: water planning, water management issues, design of hydraulic structures and natural flood control measures, the design of complex land adjustments, hydrology and hydraulics, climatology, hydropedology, agricultural and forestry soil science, forestry planning. Knowledge of the above disciplines and professional capacity for public procurement solution will be demonstrated as follows: • At least one member of the research team must demonstrate at least 5 years experience in the field of water management. Must have experience in processing min. 5 orders in the last 5 years in the field of land consolidation pursuant to § 18 of Act No. 138/2002 Coll., As amended. • At least one member of the research team must demonstrate at least 5 years experience in the field of water management, with a focus on the fields of hydrology. Must have experience in processing min. 5 orders in the last 5 years focused on the issues in the field of hydrology and min. 1 Contract related to rainfall-runoff models. II. The design team members of the research team demonstrated together their technical qualifications obtained in the form of knowledge and experience in the following fields and areas: flood control, design of hydraulic structures, water in the landscape, design USES, soil erosion control, agricultural and forest soil science, hydropedology, design land consolidation, forestry planning, GIS applications including 3D terrain modeling, climatology. Knowledge of the above disciplines and professional capacity for public procurement solution will be demonstrated as follows: • At least one member of the research team must demonstrate at least 5 years experience in the field of water management. Must have experience in processing min. 5 orders in the last 5 years in the field of land consolidation pursuant to § 18 of Act No. 138/2002 Coll., As amended. • At least two members of the research team further demonstrates authorization (authorized engineer or technician authorized) in "Construction of water management and landscape engineering" or before "Water construction" pursuant to Act No. 300/1992 Coll., As amended. In the case documented by an authorized technician contracting authority requires specialization "Buildings amelioration and remediation" and "hydro-technical constructions." III. Team hydrology and hydraulics Members of the research team collectively demonstrate their technical qualifications obtained in the form of knowledge and experience in the following sectors and areas: hydrology and hydraulics, mathematical modeling, with a focus on hydrology, the use and application of hydraulic models. Knowledge of the above disciplines and professional capacity for public procurement solution will be demonstrated as follows: • At least one member of the research team must demonstrate at least 5 years experience in the field of water management, with a focus on the fields of hydrology. Must have experience in processing min. 5 orders in the last 5 years focused on the issues in the field of hydrology and min
  • 1