Call +44 800 9755 164

Public tenders for landscape-architecture

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!
Architecturelandscape architecture

within the framework of implementation of dredging, water supply works and landscape architecture involving the Salt Lake Conservation Area II development companies in the contract. Change notice

Székesfehérvár Megyei Jogú Város Önkormányzata | Published December 28, 2016
within the framework of implementation of dredging, water supply works and landscape architecture involving the Salt Lake Conservation Area II development companies in the contract. Change notice

Framework Agreement on design missions and assistance in planning, landscape architecture and for the definition and implementation of urban projects

Communaute urbaine de dunkerque | Published December 23, 2016
Framework agreement for design and urban planning assistance missions, landscape and architecture for defining and implementing urban projects in the Greater Dunkirk

Urban planning and landscape architectural services

Communauté urbaine de Dunkerque | Published December 24, 2016  -  Deadline January 31, 2017

Framework Agreement on design missions and assistance in planning, landscape architecture and for the definition and implementation of urban projects in the Greater Dunkirk.

The consultation will lead to a framework agreement of project management no minimum or maximum amount, resulting in the conclusion of subsequent contracts pursuant to Articles 78 and 79 of no2016-360 Decree of 25/03/2016.

The tasks entrusted by this Framework Agreement concern the following: Preliminary studies (Ep); Diagnosis (Diag); sketch studies (Esq); before - project (Avp); management assistance work.

Urban planning and landscape architectural services

Stadt Erftstadt | Published January 18, 2017  -  Deadline February 13, 2017

Urban upgrading of three Old Town Park and the adjacent streets.

The Erftstadt wants the three city squares Marienplatz, Viry-Chatillion Square and Carl Schurz course and the adjacent road segments enhance overall urban planning in Erftstadt-Liblar and more attractive.

The "Master Plan Erftstadt-Liblar" defined for this purpose in the Carl-Schurz-Straße multiple, contiguous or acting in connection priority areas. Different measures to be achieved progressively urban improvements.

The aim of the procedure is to obtain proposals for the design, to a recovery of urban grievances on the Carl-Schurz-Straße and the 3 Old Town parking Marienplatz; Viry-Chatillion Square and Carl Schurz place lead. The stay on the grades 3 places it applies to the intended use to increase, and to define the meaning of each square and street situations in urban spatial structure new.

Currently, the appearance is very heterogeneous and does not bring the existing potential advantage. For the transformation of the public road space and 3 places the Erftstadt awards a restricted urban and open space planning design competition by the "Guidelines for the planning competitions RPW 2013 'with prior application procedure.

The competition is open to candidates communities of disciplines: landscape architecture and traffic planning

or urban planning and transport planning.

5 groups of candidates are selected and invited by the Organised by the participation. 10 more are determined in the upstream application process.

Landscape architectural services

Stadt Plattling | Published December 28, 2016  -  Deadline January 24, 2017

The town of Plattling want (north of the station) make the area "North Park" including the new considerations. should be planned public green areas with path networks and parking areas along the road work. The parking area is to be involved and greens. The customer pays special attention to a cross-linking within easy walking and permeability in the planning. At a later stage to follow a structural development. The development plan for this is currently in preparation and will be made available to the Office commissioned following the procedures. Compensatory measures must be carried out on the property. The traffic areas are to be designed as a multi-functional surfaces for possible recreational use. The existing area contaminated sites and ordnance are eliminated in advance.

Planning services for outdoor installations acc. §39 and planning services for traffic installations acc. § 47 HOAI 2013:

provided is a gradual commissioning of Phases 1-5 and 6-9.

Landscape architectural services

Grünflächenamt | Published December 29, 2016  -  Deadline January 30, 2017

Space Planning services pursuant to § 39 HOAI.

Subsequently, the construction of a school building in wood modular design with a cafeteria and gymnasium in 2 phases is provided.

The outdoor areas are to be designed on the basis of inclusion.

The completion of another school building with outside facilities is scheduled for the beginning of school year 2020/2021.

The site is about 4-5 meters above the adjacent road level.

Conservation Legal aspects to consider, the inventory of vegetation should be considered in the planning.

In planning 2 Special services have to take and calculate in the Honoraangebot:

This accounting is to coordinate closely with the client and the Lower Nature Conservation Authority of the City of Frankfurt and serves as the final basis for the determination of any compensation deficit and for the purchase of ecopoints.

For the plantations this is a period of one year, required for the trees for a period of 4 years in the respective phases.

All bases and statements have to consider in the planning process to be complete and must be observed.

It should be noted that it thus may connected to planning disruptions to delays in the process flow and. Rough eligible construction costs of the project 2 100 000 (EUR) net.

Scope:

Space Planning services according to §39 HOAI, Phases 3-8.

The AG reserves a phased commissioning.

Landscape architectural services

Rostocker Messe- und Stadthallengesellschaft mbH | Published January 7, 2017  -  Deadline February 6, 2017

Services Outdoor facilities:

85 m concrete pipe DN 900 embarrassed; 65 m PP tube DN300 embarrassed; 150 m PP tube DN150 embarrassed; 2 shafts DN2000; 1 manhole DN 1500 3 shafts DN 1000; 1 Grease separator NG 4; installing 150 m box gutter in paved areas; 4400 m 2 take concrete slabs, 1 600 meters 2 Inventory lay boards incl. Substructure, 3 500 meters 2 deliver concrete slabs and embarrassed including substructure, embarrassed 500m block steps as prefabricated parts, set about 2.5 m 20 m angle retaining walls height. put about 80 cm 150 m retaining wall height; 300 m3 soil removal; 2900 m 3 Bottom order; 3600 m 2 Topsoil order and Raseneinsaat; 10 mast lighting set, 35 pieces Bicycle bracket set, producing 1 piece new sprinkler.

Services Exteriors

85 m concrete pipe DN 900 embarrassed; 65 m PP tube DN300 embarrassed; 150 m PP tube DN150 embarrassed; 2 shafts DN2000; 1 manhole DN 1500 3 shafts DN 1000; 1 Grease separator NG 4; installing 150 m box gutter in paved areas; 4400 m 2 take concrete slabs, 1 600 meters 2 Inventory lay boards incl. Substructure, 3 500 meters 2 deliver concrete slabs and embarrassed including substructure, embarrassed 500m block steps as prefabricated parts, set about 2.5 m 20 m angle retaining walls height. put about 80 cm 150 m retaining wall height; 300 m 3 soil erosion; 2900 m 3 Bottom order; 3600 m 2 Topsoil order and Raseneinsaat; 10 mast lighting set, 35 pieces Bicycle bracket set, producing 1 piece new sprinkler.

Landscape architectural services

Stadt Plattling | Published January 12, 2017  -  Deadline January 24, 2017

The town of Plattling want (north of the station) make the area "North Park" including the new considerations. should be planned public green areas with path networks and parking areas along the road work. The parking area is to be involved and greens. The customer pays special attention to a cross-linking within easy walking and permeability in the planning. At a later stage to follow a structural development. The development plan for this is currently in preparation and will be made available to the Office commissioned following the procedures. Compensatory measures must be carried out on the property. The traffic areas are to be designed as a multi-functional surfaces for possible recreational use. The existing area contaminated sites and ordnance are eliminated in advance.

Landscape architectural services

Bányavagyon-hasznosító Nonprofit Közhasznú Kft. | Published December 23, 2016  -  Deadline February 8, 2017

Disused mine deep drilling for full reclamation of mining 2017th

A detailed description of the tasks found in the tender documents.

8 pieces kútkörzet reclamation. During the execution should be carried out (given the estimated quantities of data) in the following works:

- Improving access roads, reinforcement (3970 m²)

- Excavation beside mine (160 m³)

- Space Concrete, deep base, breaking the wells (830 solid m³)

- Concrete debris loading (up and down) (1430 loose m³)

- Delivery of concrete fragments (loose m³ * 28 520 km)

- Placing Concrete Debris (1430 m³)

- Sand, green waste, subsoil, waste loading (up and down) (80 m³)

- Sand, green waste, subsoil, transportation garbage (1500 km * m³)

- Sand, green waste, subsoil, waste disposal (80 m³)

- Hazardous-waste extraction drilling mud (100 m³ of solid)

- Premises licensed hazardous-waste drilling mud removal (2700 km * loose m³)

- Hazardous-waste disposal of drilling mud (200 m³ loose)

- Sol Price material supply (930 solid m³)

- Sol loading (up and down) (1286 loose m³)

- Sol transport (28 130 km * loose m³)

- Deposited land leveling, landscaping (1620 m²)

- Agro Technical reclamation, land-use planning (8060 m);

- No extraction of contaminated soil and restore (100 m³)

- Felling, felling (0.4 ha)

- Head Pipe transformation (csőelvágás, pipe caps manufactured, pressure gauge, needle valve equipment) ( "0")

- Control laboratory test sample (28 pieces)

- Restoring the original condition of the approach route (3970 m²)

- Zöldkár (7380 m²)

- Soil Conservation Plan (to be laying, ground) 8,

- Replacement or conversion (csőelvágás, pipe caps manufactured, pressure gauge, needle valve equipment) The head tube is recognized based on the actual amount.

Landscape architectural services

Ville de Cannes | Published December 22, 2016  -  Deadline January 23, 2017

The project management contract awarded in control group, is intended for the redevelopment of alleys of Liberty, the Félix Faure Street from Gaulle place for the City of Cannes and the Pantiero Boulevard and instead Bernard Cornut-Gentille for CAPL. This comprehensive redevelopment operation conducted in collaboration with the Community of agglomeration of Lerins Cannes Country's main objectives are the achievement of qualitative public spaces while providing functional responses to the activities of urban transport, motor flux, continuity pedestrian walkways and sustainability of economic activities.

Landscape architectural services

Métropole Rouen Normandie | Published December 23, 2016  -  Deadline January 30, 2017

The basic tasks are:

April: Preliminary draft

Pro: Project planning

dce: Companies Tender documents

Act: Assistance for the award of the works contract

Visa: Visa Compliance and execution of works

det: the execution of work Branch

aor: Assistance to receive operations and completion guarantee

additional assignments are:

UCI: Scheduling, Management and Coordination

Concer: Assistance to the Client for the consultation and information of the public (residents, traders, users).

- Give momentum to pedestrian areas and regain some luster in a major artery of the city and Greater Montréal by creating a living space / exchange / sociability for users with large and pleasant paths without obstacles and accessibility of the 2 banks, a consideration of sunshine, neat night scene (work on lighting) and a layout tailored to different users (families, youth, seniors)

- Strengthen the commercial attractiveness (visible shops and terraces valued) and "Creating a positive buying mood" (cf. Fisac ​​Study)

- Improve multimodality (Parking readable relay, line 41 / subway, attractive paths metro / t4, bicycle parking, terminals electric cars ...).

Landscape architectural services

Helsingborgs stad | Published December 23, 2016  -  Deadline January 30, 2017

Refers to continually orders of consulting services for creative landscaping, project management, client support, spreadsheet and plant inspection.

Urban planning and landscape architectural services

Amiens Métropole | Published December 13, 2016  -  Deadline January 23, 2017

urban plan of innovation (SUI). Development of a reference Master Plan (Master Plan) and support the Community in its operational implementation.

Framework Agreement without mini and maxi and an economic operator. The framework agreement is concluded for a period of 1 year from the notification of the contract. The contracting authority has decided not to launch the consultation in separate lots for the following reasons: The purpose of the framework agreement does not allow the identification of distinct benefits.

Urban planning and landscape architectural services

Bauverwaltung Fraubrunnen | Published December 14, 2016  -  Deadline January 31, 2017

See tender document.

Urban planning and landscape architectural services

EPF de Poitou-Charentes | Published December 14, 2016  -  Deadline January 30, 2017

The Purpose of this market to purchase orders is the realization of intellectual services such preliminary studies / pre-operational and map-guide type of property valuation.

It is renewable twice by tacit agreement.

Each study is broken down into firm phase and conditional phase.

Lot # 1: Feasibility studies on land small / simple

Lot # 2: Rehabilitation Feasibility Studies

Lot # 3: Feasibility studies on land of medium / complex size

Lot # 4: Studies "guide map".

The land concerned may generally be less than 1ha in size, depending on the complexity of constraints.

It can be as rehabilitation of deconstruction / reconstruction partial.

Aspects of urban development and networks will be more sensitive: urban integration, landscaping, routes, possibly public spaces.

This lot covers small areas of up to 20 ha.

Urban planning and landscape architectural services

Ville de Toulouse | Published December 16, 2016  -  Deadline January 24, 2017

competitive procedure with negotiation subject to the provisions of Articles 25-I.2º and 71 to 73 of Decree No 2016-360 of 25.3.2016. Consultation passed under sections 78 and 79 of Decree No 2016-360 of 25.3.2016 relating to framework agreements. no minimum framework agreement or maximum concluded with an economic operator running through subsequent contracts. In the case of restricted procedures, no tender documents available at this stage. Is downloadable marchéspublics.toulouse-metropole.fr, the tender documents for applications consisting of tender regulations and 2 annexes to complete (ref 16v148ac.): Tables skills and references presented the team.

Mission project owner assistance for the implementation of the urban project, monitoring and consistency of public spaces on the Brouardel-Europe sector in Toulouse (16v148ac) (VA / AM).

Landscape architectural services

Huge Fastigheter AB | Published December 20, 2016  -  Deadline January 24, 2017

The mission of this request implies that hold office landscape. Assignments can be called up is a landscape assignments including

- New production of the entire property portfolio Huges eg kindergarten, primary school, apartment buildings, retirement homes, sports facilities,

- Renovation project

- Traffic linked to new construction projects,

- etc.

Clarification of terms and conditions will be made in the call.

Urban planning and landscape architectural services

DRAC Aquitaine | Published December 22, 2016  -  Deadline January 27, 2017

The protected area of ​​Périgueux was delineated the territory of the municipality by Ministerial Decree of 29/01/1970 and was approved on 12.03.1980 and 20.12.1988 modified pursuant to Article L 313-1 of the Town Planning Code . It covers 22.52 hectares. It includes 807 plots and includes 33 buildings protected by the law on historical monuments; the municipality comprises 46 in total. Except for historical monuments located within the perimeter of the protected area, the territory of the Community of agglomeration Grand Périgueux has 86 historical monuments. The revision / extension of the conservation area of ​​Périgueux was initiated by municipal resolution dated 7.3.2015 and prescribed by order of the Prefect of the Dordogne dated 11.24.2016.

Review the backup plan and development of the protected area of ​​Périgueux (24).

Urban planning and landscape architectural services

Commune de Thizy-les-Bourgs | Published December 23, 2016  -  Deadline January 31, 2017

This consultation relates to the appointment of a prime contractor on the entire scope of the redevelopment project of Jean Jaurès project and for carrying out the work required for the servicing of the Land: earthworks, retaining structures, networks, roads infrastructure and surface facilities.

These arrangements should take into account:

- Connection to the North of the Commerce Square with Perrin Brothers streets, rue Anatole France, the Grand Vessin street, rue Victor Clément, JB Rue Fournier,

- Connection to the South with the street Edouard Millaud

- Connection to the east with the street Pierre Chevenard,

- The West in connection with the Roland Street Platière.

The tasks entrusted to:

- Preliminary studies and diagnosis,

- The preliminary studies,

- Project studies,

- Assistance to the award of works contracts,

- The visa of studies by the incumbent (or incumbents)

- The direction of the execution (or) contract (s) of work

- Assistance during acceptance operations and during the completion guarantee period,

- Scheduling, coordination and management of the site.

The market has firm phase 1 and 2 optional tranches:

- A firm phase: requalification of the Rue Gambetta (including car cash) and Jean Jaurès and Place Maurice Ravel (DIAG + Mission and AVP of the entire program)

- An optional tranche 1: requalification of the Commerce Square (from the PRO phase)

- An optional slice # 2: Creating a traboule, creating parking spaces and upgrading of an existing parking.

Urban planning and landscape architectural services

Ville de Clamart | Published December 23, 2016  -  Deadline January 27, 2017
PO market is treated in unit prices. 

Special attention is required on the integration of green spaces in urban development projects, the work of this master licensee lot 1 will work for it in close collaboration with the owner of lot 2.

Moreover, the holder shall have directly or via a joint contractor or subcontractor expertise in the following areas: pruning, measures to be adopted to fight against diseases of the tree, phytosanitary study of trees in the city, Communications, Search financing, implementation of a best practice guide.