Public tenders for architect, architecture in Ancona Italy

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Engineering services

Azienda Sanitaria Unica Regionale Marche (ASUR — Marche) | Published November 10, 2017  -  Deadline December 20, 2017
cpvs
71300000

Engineering and architecture services that rely on the definitive and executive design, safety coordination during design, firework adaptation of part of the Macerata Hospital called "1st Complex" 1st lot.

Definitive Design, Executive and Coordination of Safety in Design, Work to Comply with Macerata's Old Complex PO, 1st Lot.

Architectural, engineering and planning services

Ministero Infrastrutture e Trasporti — Provveditorato Interregionale OO.PP. Toscana Marche Umbria | Published April 20, 2017  -  Deadline May 29, 2017
cpvs
71240000

The project involves the prior technical verification of seismic safety levels in accordance with DM 14.1.2008 to be carried out in the existing building, and subsequently, evaluated the economic opportunity, the final design and the coordination of safety in the design phase , aimed at the renovation of the former barracks Paolini of Fano (PU) Via Francesco Palazzo, to be used as Command Police Company.

As detailed in the tender documents, part of the tender.

Architectural, engineering and planning services

Ministero Infrastrutture e Trasporti — Provveditorato Interregionale OO.PP. Toscana Marche Umbria | Published May 17, 2017  -  Deadline June 19, 2017
cpvs
71240000

The intervention involves the preliminary technical verification of the seismic security levels according to DM 14.1.2008 to be performed in the existing building, and subsequently assessed the economic opportunity, the definitive and executive design and the coordination of safety during the design phase , Aimed at restructuring the former Caserma Paolini di Fano (PU) building, Via Francesco Palazzo, to be used by Comandante Compagnia Carabinieri.

Architectural, engineering and planning services

Ministero Infrastrutture e Trasporti — Provveditorato Interregionale OO.PP. Toscana Marche Umbria | Published October 7, 2017
cpvs
71240000

The intervention involves the preliminary technical verification of the seismic safety levels under DM 14.1.2008 to be carried out in the existing building, and subsequently evaluated the economic opportunity, the definitive and executive design and the coordination of safety during the design phase , aimed at renovating the former Caserma Paolini di Fano (PU), Via Francesco Palazzo, to be used by Comandante Compagnia Carabinieri.

Architectural, engineering and planning services

Ministero Infrastrutture e Trasporti — Provveditorato Interregionale OO.PP. Toscana Marche Umbria | Published October 6, 2017
Winner
Studio Paci Srl
cpvs
71240000

The intervention involves the preliminary technical verification of the seismic safety levels under DM 14.1.2008 to be carried out in the existing building, and subsequently evaluated the economic opportunity, the definitive and executive design and the coordination of safety during the design phase , aimed at renovating the former Caserma Paolini di Fano (PU), Via Francesco Palazzo, to be used by Comandante Compagnia Carabinieri.

As detailed in the Tender Rules, an integral part of the Call.

Supervision of building work

Assemblea Territoriale d'Ambito ATO2 — Ancona | Published May 19, 2016
Winner
Ing. Renato Filippa
cpvs
71247000

The contract provides for the award of services relating to architecture and engineering, comprising the activities of:

- Site management, service testing, acceptance testing (Art. 148, Presidential Decree 207/2010);

- Liquidation (Art.194, paragraph 1 of Presidential Decree 207/10)

- Financial reports and technical accounting clearance (EC Reg. 1698/2005 as amended);

- Elaborate renovation Control project, updating the operating and maintenance manuals (art.148, paragraph 4, of Presidential Decree 207/2010);

- Coordination and site management office supervision (art.148, paragraph 2 of Presidential Decree 207/2010);

- Office works management (artt.147-149-150, Presidential Decree 207/2010);

- Job accounting in the body (art.185, DPR 207/10);

- Safety coordination runtime (art.151, Presidential Decree 207/2010).

Supervision of building work

Assemblea Territoriale d'Ambito ATO2 — Ancona | Published November 26, 2015  -  Deadline January 18, 2016
cpvs
71247000

The contract provides for the award of services relating to architecture and engineering relating to the construction supervision and the coordination of safety in phase of works of conversion of the existing composting plant the organic fraction of municipal waste site in the San Vincent of Corinaldo in mechanical biological treatment plant of urban waste produced in the ATO 2 Marche Region - The excerpt. In particular performance it includes the following activities: - construction management, service testing, acceptance testing (Art. 148, Presidential Decree 207/2010), - settlement (Art.194, paragraph 1 of Presidential Decree 207/10), - statements of account and liquidation accounts technician (Reg. EC 1698/2005, as amended), - control upgrade project documents, update the user manuals and maintenance (art.148, paragraph 4, Presidential Decree 207/2010), - coordination and supervision of the office works management (art.148, paragraph 2, Presidential Decree 207/2010), - management office work (artt.147-149-150, DPR 207/2010), - job accounting body (art.185, DPR 207 / 10), - safety coordination runtime (art.151, Presidential Decree 207/2010). The Office of Works management will be composed of the Director jobs and at least one assistant. Each external collaboration will be regulated by direct agreement between the contractor and exclusive and the person concerned, with expenses to be charged to expenses and the same. The competitor must still indicate, already in the competition, the names of those employees and the specific performance in order to acquire its clearance. The figure of the Security Coordinator at runtime of the work can be covered by the Director of the work, provided they meet the requirements described in section 7 of this specification.
  • 1