Public tenders for architect, architecture in Zalaegerszeg Hungary

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural services for buildings

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published March 11, 2017
Winner
TSPC Technical Supervision and Planning Consulting Hungary Kft.
cpvs
71221000

Zalaegerszeg Town Swimming Pool (Zalaegerszeg, Mártírok, swimming pool building in hrsz.-U 3323/5. Property under number 78) the development the subject of investment, as amended outline plan and construction, land deformation and water licensing documentation of the design, construction documentation for the preparation of (the latter optional item) as well priced and unpriced preparation of industry-specific, itemized budget.

The contractor responsible for carrying out the preparatory land forming processes and the acquisition of water rights permits (abandonment of wells and the construction of new wells) with the required documentation.

Original:

Contract duration: The construction plans and priced, unpriced industry-specific, itemized budgets delivery deadline of 90 working days from the written order of the Customer.

Customer emphasizes that the contract is not yet available in the entire design fee, so you want to order an optional item in the export plan for a written order on the basis of this procurement process resulting from future contracts.

The design fee, payment terms.

Contractor upon certification of the contractual performance by the Client, submit two pieces of billings and one final invoice ((optionally further a piece of account) shall be entitled as follows.

If the construction plan documentation Customer orders, for controlling breakage of a piece of additional accounts may be filed after the transfer of the documents contained in the Contractor's offer by tendering procedure 5.2.2. given in value.

Modified:

Contract duration: The time limit for the implementation of plans and priced, unpriced industry-specific, itemized budgets delivery of parts per job:

I subtasks within nine working days of the date of preparation of plans Reconciliation of Customer written order.

II. subtasks within 40 working days of the date of preparation of demolition plans in the written order of the Customer.

III. subtasks within 81 working days of the date of preparation of construction plans for further written order of the Customer.

II. and III. parallel subtasks period continued.

Customer emphasizes that the contract is not yet available in the entire design fee, so plan to export parts per job, a written order optional items you want to order on the basis of this procurement process resulting from future contracts.

Main elements of the implementation plan subtasks (optional item):

I subtasks: Reconciliation Plan.

Pallértervek, materials, specifications and operating specifications (architecture, building engineering, building electricity).

II. subtasks: Demolition plan.

Demolition site plan.

Demolition floor plans.

Demolition engravings.

Demolition facades.

Technical specifications (architecture, supporting structure, building engineering, building electricity, public utilities).

III. Part task: more construction plans.

Architects working part: Site plan, setting plans, floor plans, sections, elevations, paving plans, plan Ceiling, Stair plans, Schedules, detail drawings, Layers collection, Specifications.

Particular areas of work: support structure, building electricity, building engineering, fire protection engineering Pool, accessibility, acoustics, environmental planning, external water utility, road design, safety at work, sports technology.

Priced and unpriced budget (any branch, respectively).

The design fee, payment terms.

Contractor upon certification of the contractual performance by the Client, two pieces of billings and one final invoice submission (two additional pieces of billings and one final bill if applicable) shall be entitled as follows.

If any part of the construction plan documentation, order the Customer, for controlling breakage two additional pieces of sub-accounts may be filed in the contract 2.2. I and II in point. subtasks respect, as well as a piece of the final bill can be submitted to the III. After sub-task execution and delivery of documentation.

in the Contractor's offer by tendering procedure 5.2.2. value given in respect of 10% of eligible accounts submitted to the sub-tasks I respect, 5.2.2. given in the value of 5% of the bill in respect of the right to submit II. Subtask respect to 5.2.2. given in 85% with regard to the right to submit a bill III. Subtask respect.

Architectural services for buildings

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published September 24, 2016
Winner
TSPC Technical Supervision and Planning Consulting Hungary Kft.
cpvs
71221000

Zalaegerszeg Town Swimming Pool (Zalaegerszeg, Mártírok, swimming pool building in hrsz.-U 3323/5. Property under number 78) the development the subject of investment, as amended outline plan and construction, land deformation and water licensing documentation of the design, construction documentation for the preparation of (the latter optional item) as well priced and unpriced preparation of industry-specific, itemized budget.

Software-related services

Zala Megyei Kormányhivatal | Published October 7, 2017  -  Deadline November 9, 2017
cpvs
72260000, 48000000, 72261000, 72262000, 72263000, 72265000, 72212218

Procurement of a management operation system for the priority project named KÖFOP-1.0.0-VEKOP-15-2017-00053.

Procurement refers to the operation management system to be set up by the Contracting Authority, the integration of the entire system.

The system's definable function is as follows:

- operation management system

All software elements required to run the application (including the operating system and database management software) must be delivered by the winning bidder.

Services to be provided by a successful Tenderer for 12 months from the date of entry into force of the Contract, as per the specifications:

- specification of the requirements for connection of the system and other system components to be created by the Contracting Authority (1),

- system design (1 security, 1 logic and 1 physical system plan),

- the development of module modules,

- system-side building of connections of developments in co-projects,

- integration and testing of the developed system as described in the technical specification,

- transfer of the tested system to the customer's integration integration test,

- the fulfillment of related educational tasks,

- development of development recommendations for the operation of the system (eg software environment, licenses, staff proposal)

- system start-up,

- system fine tuning, fault management, support service availability

- 2-year warranty,

- supplying the whole system application management tasks from the start of the trial operation to the physical closing of the project.

In view of the complexity of the system and the integrity of the other modules and IT systems that are to be integrated and related, the winning task of the winning bidder is the co-operation with the co-projects and the information technology experts of the Bidder, which is provided by the joint project organization.

The use of licenses related to development can not be limited in time, and the developed system must comply with the legal environment in which the project is physically closed.

The distributed architecture system developed during the development is used simultaneously by 20 government offices (Fővárosi és Megyei) and the related 197 district offices.

The settings must be logged automatically.

15.) BM Decree.

Number of end-users affected by development:

Capital and County Government Offices: 40,000 people

The detailed job description is included in the technical annex.

Zalaegerszeg informational award

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published June 17, 2015
Winner
Szabau Invest Kft.
cpvs
45212212

A contract to the "Zalaegerszeg, city beach, paddling pool construction and reconstruction of the environment" adopted by the construction work. The contractor is responsible for Zalaegerszeg, city beach, paddling pool construction and reconstruction work environment of snow March 2015, 15-06 working number by Indeco Arch Studio Ltd., General procurement documentation for construction plans and tender documents indicated below. Vizafogó statue in the middle of an existing pool will be moved to the pool axis of a built-in pedestal drinking fountain built. Architects working part: The pool also 1pc water gushing hedgehog, 3 pcs and more water water jet water gate will be installed. The dividing walls in galvanized steel legs raised partition system. New doors and windows, the door will be placed. The outdoor shower in the basin axis of the cross will be built on either side, the structure of polished glass-reinforced engineering plastic resin casing surrounded by flower shape formatted. The galvanized steel structures, shade structures and UV coated solar sail complete with rain-proof fabric. As in the shade structures are changing, powder-coated galvanized steel structures and UV solar sail complete with rain-proof fabric. The existing pool Vizafogó statue will be moved from the middle axis of the new pool. New interpretation of the statue and pedestal also serves the ivókútként padkaként, dribbling through the pedestal of the statue of the water. On the western side of the basin on both sides of the statue is made from our sun screening device. Structures Working part: Material: C30 / 37-16 / XV2 (H) Material: C30 / 37-16 / XV2 (H) Material: C25 / 30 - During opening breakdowns required 16 / XC1 Female / barrier-free toilet room to form 2 x LEIER MDA125- kerámiaköpenyes year bridging is installed. Building services working part: technological water requirements necessary to ensure the filling of the pool water output line is in connection with the plot takes place. The supply of domestic hot water needs is done by the existing water heater, which is connected to be built within the work area pool water engineering technology Registrar of the heat exchanger. The property has no stormwater network, so the network receives wastewater discharged into the pool of water. The toilet facilities are constructed new facilities. Building Electrical Work part: Under the new investment in the power grid will be expanded with the building of summer dressing rooms on the toilet, fund supply operation of the new boiler and water engineering systems. Garden Architecture Working part: Given the fact that during the execution tree planting is not possible, therefore, not subject to the public procurement only perform the tasks contained in the documents and gardening, planting shrubs and herbaceous plants, as well as irrigation for the installation works. Hydraulic engineering work for: the existing water conditions in the engineering system currently in place is not up, so after the breakdown will establish a new water system engineering. The pool water disinfection with chlorine, chlorine dioxide system works. The margin may only be used for the completion of works, necessary for the proper and safe use works against the value of the settlement. The level of assessed value below the amount of the reserve funding also includes the estimated value net 43,307,090 USD main parameters of the job, the volumes of detailed specifications in the tender documentation. Offer the Offeror must submit unpriced budget priced for proposals will be issued in the tender documents.

"Preparation and execution of a contract for work at Zalaegerszeg, Kazinczy u fourth space construction design documentation under the EEOP 5.6.0 / Project ID No. 12-2013-0037. Building during 3172 "

Zala Megyei Kormányhivatal | Published November 5, 2015
Winner
BMT Mérnöki Kft. és Z-Service Kft. Közös Ajánlattevők (Vezető: BMT Mérnöki Kft. (1023 Budapest, Ürömi utca 48.), Tag: Z-SERVICE Kft. (1137 Budapest, Szent István krt. 2. V/30.))
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under paragraph 3172 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy saving, the attic floor thermal insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"A contract under the EEOP 5.6.0 / 12-2013-0037 identification number of project preparation and construction work at Keszthely, Kossuth u detailed design documentation. 42. u. Building under 774/9 "

Zala Megyei Kormányhivatal | Published November 5, 2015
Winner
Szabadics Építő Kft - Szabau Invest Kft. Közös Ajánlattevők (Vezető: SZABADICS - ÉPÍTŐ Építőipari és Ingatlanforgalmi Kft. (9700 Szombathely, Fő tér 24.), Tag: SZABAU INVEST Építőipari és Ingatlanforgalmi Kft. (H-8900 Zalaegerszeg, Sütő u. 4. II/1.))
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under paragraph 774/9 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, padlás- and cellar ceiling heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading heating systems, renewable energy utilization PV system construction and completion of all of these and all associated ancillary works necessary. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"Preparation of detailed design documentation under the EEOP 5.6.0 / 12-2013-0037 identification number of projects and a contract to perform construction works Zalaegerszeg, Mártírok 42-44. u. Building during 3226/5 "

Zala Megyei Kormányhivatal | Published November 5, 2015
Winner
Szabau Invest Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 3226/5 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"Preparation and construction work at Zalaegerszeg, Kazinczy topographical map of the fourth amendment of a contract for detailed design documentation. Building during 3172 "

Zala Megyei Kormányhivatal | Published December 4, 2015
Winner
BMT Mérnöki Kft. és Z-Service Kft. Közös Ajánlattevők (Vezető: BMT Mérnöki Kft.); Tag: Z-SERVICE Kft.
cpvs
45000000, 09331000, 45320000, 45311000, 45350000, 45421132, 71245000

Building under paragraph 3172 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy saving, the attic floor thermal insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"The preparation and carrying out construction works Keszthely, Kossuth u modification of a contract for detailed design documentation. 42. u. Building under 774/9 "

Zala Megyei Kormányhivatal | Published December 4, 2015
Winner
Szabadics Építő Kft - Szabau Invest Kft. Közös Ajánlattevők (Vezető: SZABADICS - ÉPÍTŐ Építőipari és Ingatlanforgalmi Kft.), Tag: SZABAU INVEST Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45320000, 45311000, 45350000, 45421132, 71245000

Building under paragraph 774/9 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, padlás- and cellar ceiling heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading heating systems, renewable energy utilization PV system construction and completion of all of these and all associated ancillary works necessary. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"Preparation and modification of a contract to perform construction works construction plan documentation alaegerszeg, Mártírok 42-44. u. Building during 3226/5 "

Zala Megyei Kormányhivatal | Published December 4, 2015
Winner
Szabau Invest Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 3226/5 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"A contract under the EEOP 5.6.0 / 12-2013-0037 identification number of project preparation and documentation to carry out construction works construction plan Lenti, 11 hrsz Temple Square. Building during 1084/3 "

Zala Megyei Kormányhivatal | Published November 9, 2015
Winner
LE-KO Építőipari Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 1084/3 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy saving, the attic floor and a flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, renewable energy utilizing solar building systems, and perform all of these and all associated ancillary works necessary. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

In the context of a project called "Zala County Government Office buildings for energy efficiency investments," the preparation and carrying out construction work on the detailed design documentation 8800, Eötvös Square building at number 16

Zala Megyei Kormányhivatal | Published February 11, 2015
Winner
UNIFORM Építőipari és Szolgáltató Kft - SZABAU INVEST Építőipari és Ingatlanforgalmi Kft
cpvs
71245000, 45000000, 09331000, 45262630, 45320000, 45331110, 45350000, 45421132, 42511110

The object of the procurement: Preparation of detailed design documentation (CPV code: 71245000 Approval and implementation plans, and specifications) and works (CPV code: 45000000-7, 09331000-8, 45262630-6, 45320000-6, 45331110-0, 45350000-5, 45421132-8, 42511110-5). The key objective of the project is decentralized, environmentally friendly, renewable energy systems spread or spread encouraging. The works shall be carried out on the basis of technical documentation prepared to be issued export plan will be used as part of the documentation. Preparation of 8800, Eötvös Square building at No. 16 detailed design documentation, construction investment. The main parameters of the design: the energy renovation includes subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement of obsolete and front doors, upgrading the lighting system with energy-efficient luminaires by replacing the outdated lighting, renewable energy solar deployment of renewable energy utilizing solar system building, and all of them and all associated ancillary works to perform. These include in particular, but not limited to the following items: • On completion of transfer work areas of work, such as: the preparation and delivery Delivery # documentation. # Execution completion of the restoration of the staging area for the intended / planned state. Completion of the course # Test run • Technical leadership responsibilities and professional, careful construction management staff and equipment to ensure • on-site quality assurance (advance quality planning, quality education, while implementing continuous quality control, final quality control after each working part is finished for the working parts, working parts consecutive quality coordinating, quality control and documentation of materials used) to carry out work areas, • the fieldwork defense architectures, equipment and establishment, acquisition, on-site to ensure and guarantee the right to legal requirements OSH coordination and safety management. DESIGN forms part of the detailed design documentation for the technical description of the works, the itemized budget priced and unpriced. Main tasks and schedule of the contractor: content, implementation plans set out in the contract to make the draft documentation, preparing itemized budget priced and unpriced. Purchase the full implementation of the necessary permits - if necessary, preparation of documentation Implementation. 15) provides that, subject to the relevant Call for proposals and specifications; The budget to be applied on the basis of a special mark to be specified list of items provided by the Contracting Authority (Customer), or for items not included in the items used in accordance with TERC-VIP (or equivalent) budget maker software system. Without requiring the winning bidder to be royalty to give the author the right to intellectual property which is the result of all the tasks carried out as a result of this process. 23.) Government Regulation Section 5 (5)) of all plans and documents to be prepared for the Hungarian language. The expected number of copies to be delivered Plans and Documentation: - Export plan, budget priced 4 for example. print + digital delivery (editable format)

Contract award of Zala County Government Office, Göcsej u. 24 CONSTRUCTION

Zala Megyei Kormányhivatal | Published January 14, 2015
Winner
SZABADICS-ÉPÍTŐ Kft.
cpvs
45000000, 09331000, 45262630, 45331110, 45350000, 45421132, 42511110

Building at number 24. "Construction mode in industrialized building built in 8900 Zalaegerszeg Göcsej 24th street. No (hrsz.217 / 6). Zala County Government Office 1980, built in the early years of building (5,587 m2 total floor area, partial basement, ground floor and four floor levels are mechanical tetőfelépítménnyel with, UNIVÁZ system prefabricated pillar, födémes and falpanelos load-bearing structure was built, flat-roofed building): the poor thermal insulation capacity front Subsequent thermal insulation of walls, replacement, resulting in outdated and front doors and energy-saving, flat roof heat insulation and waterproofing, basement slab thermal insulation, upgrading the lighting system to the outdated lighting energy-saving luminaires exchange, renewable energy solar building, renewable energy solar system construction, and completion of all of these and all associated ancillary works necessary. These include in particular, but not limited to the following items: • On completion of transfer work areas of work, such as: the preparation and delivery Delivery # documentation. # Execution completion of the restoration of the staging area for the intended / planned state. Completion of the course # Test run • Technical leadership responsibilities and professional, careful construction management staff and equipment to ensure • on-site quality assurance (advance quality planning, quality education, while implementing continuous quality control, final quality control after each working part is finished for the working parts, working parts consecutive quality coordinating, quality control and documentation of materials used) to carry out work areas, • the fieldwork defense architectures, equipment and establishment, acquisition, on-site to ensure and guarantee the right to legal requirements OSH coordination and safety management. DESIGN forms part of the detailed design documentation for the technical description of the works, the itemized budget priced and unpriced. Main tasks and schedule of the contractor: content, implementation plans set out in the contract to make the draft documentation, preparing itemized budget priced and unpriced. Purchase the full implementation of the necessary permits - if necessary; Making implementation documentation. 15) provides that, subject to the relevant Call for proposals and specifications; The budget to be applied on the basis of a special mark to be specified list of items provided by the Contracting Authority (Customer), or for items not included in the items used in accordance with TERC-VIP (or equivalent) budget maker software system. Without requiring the winning bidder to be royalty to give the author the right to intellectual property which is the result of all the tasks carried out as a result of this process. 23.) Government Regulation Section 5 (5)) of all plans and documents to be prepared for the Hungarian language. The expected number of copies to be delivered Plans and Documentation: - Export plan, budget priced 4 for example. print + digital delivery (editable format)

Contract award of Zala County Government Office, Kosztolanyi D. u. No. 10. CONSTRUCTION

Zala Megyei Kormányhivatal | Published February 11, 2015
Winner
SZABAU Invest Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45262630, 45331110, 45350000, 45421132, 42511110, 71245000

Traditional construction method, built unprotected building 8900 Zalaegerszeg, Kosztolányi street No. 10. (U .: 2404/0 / A / 1-16.) Below. The inner courtyard there is a third wing, which is connected to the főszárnyhoz two bridges. The building subsequent thermal insulation of the poor thermal insulation capacity and front walls of the flat roof of heat and water insulation of the attic floor and the high roof heat insulation, replacement, resulting in outdated and front doors and energy saving, upgrading the lighting system with energy-efficient luminaires by replacing the outdated lighting, renewable energy utilizing solar system construction, and completion of all of these and all associated ancillary works necessary. These include in particular, but not limited to the following items: • On completion of transfer work areas of work, such as: the preparation and delivery Delivery # documentation. # Execution completion of the restoration of the staging area for the intended / planned state. Completion of the course # Test run • Technical leadership responsibilities and professional, careful construction management staff and equipment to ensure • on-site quality assurance (advance quality planning, quality education, while implementing continuous quality control, final quality control after each working part is finished for the working parts, working parts consecutive quality coordinating, quality control and documentation of materials used) to carry out work areas, • the fieldwork defense architectures, equipment and establishment, acquisition, on-site to ensure and guarantee the right to legal requirements OSH coordination and safety management. DESIGN forms part of the detailed design documentation for the technical description of the works, the itemized budget priced and unpriced. Main tasks and schedule of the contractor: content, implementation plans set out in the contract to make the draft documentation, preparing itemized budget priced and unpriced. Purchase the full implementation of the necessary permits - if necessary, preparation of documentation Implementation. 15) provides that, subject to the relevant Call for proposals and specifications; The budget to be applied on the basis of a special mark to be specified list of items provided by the Contracting Authority (Customer), or for items not included in the items used in accordance with TERC-VIP (or equivalent) budget maker software system. Without requiring the winning bidder to be royalty to give the author the right to intellectual property which is the result of all the tasks carried out as a result of this process. 23.) Government Regulation Section 5 (5)) of all plans and documents to be prepared for the Hungarian language. The expected number of copies to be delivered Plans and Documentation: - Export plan, budget priced 4 for example. print + digital delivery (editable format) Contracting fix that entrepreneurial type of contract with a lump sum. The conditions include the use of reserve funding agreement which is part of the tender documentation draft. The detailed technical specifications and the draft contract in the tender documentation. Bidder shall attach to the tender notice, of the main budget priced unpriced work are not being released as part of the tender documents, which do not have the opportunity to work to expand the Bidder. Under Regulation 23) Government. § 26 (6) accept everything with equivalent products.
  • 1