Information on the outcome of the procedure; A contract to the NYDOP-3.1.1 / B1-13-2013-0001-s ID number of "store of value renewal of the Castle District - Phase I" project related to construction of the object, called finishing works

Sopron Megyei Jogú Város Önkormányzata | Published December 2, 2015
Winner
VEMÉV-SZER Építő és Szerelőipari Kft.
cpvs
45100000, 45200000

Procurement subject: 'a contract of NYDOP-3.1.1 / B1-13-2013-0001-s ID number of "store of value renewal of the Castle District - Phase I" project-related construction works construction works finishing works, called the subject of "Public procurement quantity: Winning bidder Construction work for the following tasks related to the initial project construction work of the technical conditions set out in the notice as part of the budget documentation. ARCHITECTURE OF PUBLIC SPACE - demolition of landscape architecture asphalt pavement works machinery (330 ² area) of 9.9 m3 of concrete pavement demolition machine base (area 320 ²) dismantling dropped from 64 m3 of debris removal, landfill tipping 73.9 m3

Architectural design services

Sopron Megyei Jogú Város Önkormányzata | Published January 13, 2017
Winner
Közti Zrt.
cpvs
71220000, 71320000

"Preparation of design contracts necessary for the development of complex aquatic plants Lake Neusiedl building permit and detailed design documentation, engineering and technical management of the subject."

Sopron County Council for the intermediate Plc. In December 2015, it has prepared a "complex development Fertői Water Plant" adopted by the study plan. This call for proposals is based - as a planning program - the study plan I and II. technical content for strokes.

development tasks set out in the Study Plan I and II. Approval for construction preparation and execution plans for the beat, which includes:

- Designing buildings,

- The landscape, garden and environmental design,

- The planning of water facilities,

- The utility planning,

- The road design, bridge design.

I. Approval of design documentation preparation.

It aims primarily to building an administrative authorization procedure as well as other needed to be licensed by the authorities - the creation of design documentation, the necessary consultations to be - created content required by law.

The design fee covers the licensing process execution as well.

II. Preparation of detailed design documentation.

Its objective procurement process of the selection of the contractor, and the preparation of professional and purposeful execution of works suitable for detailed design documentation, design documents based on the approved permit.

The construction plan includes the base fee will collaborate in designing the tendering procedure for the selection of the contractor.

III. Designer's supervision.

During the implementation of the priority locations for a maximum of 80 driving occasions you need to achieve their design makes the offeror may differ from minus 30% of the work includes the management fee.

Architectural design services

Sopron Megyei Jogú Város Önkormányzata | Published May 19, 2017
Winner
Középülettervező Zártkörűen működő Részvénytársaság
cpvs
71220000, 71320000

"Design contract preparation planning permission and detailed design documentation for the complex development of aquatic plants Lake Neusiedl, as well as the subject of designer's leadership."

"Design contract preparation planning permission and detailed design documentation for the complex development of aquatic plants Lake Neusiedl, as well as the subject of designer's leadership."

The nature and extent of changes (including any amendments to the contract earlier indication): Parties, point 2, called the subject and content of the contract, the contract subsection 2 (completion deadline for licensing plans) Yes. Based on § 141 paragraph (4) c) be amended as follows:

Original:

fulfill the task of licensing plans within 112 days from the date of entry into force of the contract;

Modified:

It fulfills the task of licensing plans within 172 days from the date of entry into force of the contract.

"Kofi Szombathely center architectural design"

Győr-Sopron-Ebenfurti Vasút Zrt. | Published June 29, 2015
Winner
FERRO-CORR Kft.
cpvs
45000000, 45300000, 45310000, 45321000, 45331000, 71240000

The subject of the public contract: Works - Design and execution "of Szombathely Kofi center architectural design" The amount of Procurement: The procurement of Szombathely D70 building existing roof demolition and additional floors designed for centralized traffic control centers and associated server premises architectural construction of direction. Because of the roof storey structure will be demolished and the lower levels because of the partial construction work will take place cable ducts. The contractor responsible for building this procurement documentation and the accompanying design plans and construction design and construction after approval by the building permit. The affected part of the existing building floor area of ​​305 m2 attic.

Information regarding the outcome of the procedure; NYDOP-3.1.1 / B1-13-K-2013-0001 "in the Castle District lockers renewal - Phase" project called supply-related finishing works for the subject of technical control duties

Sopron Megyei Jogú Város Önkormányzata | Published November 20, 2015
Winner
CÉH Tervező, Beruházó és Fejlesztő Zrt.
cpvs
71356100, 71500000

Procurement subject: Contract for the "NYDOP-3.1.1 / B1-13's identification number-2013-0001," The Castle District lockers renewal - Phase I care related project called "finishing works of the technical tasks of monitoring the amount of the subject of procurement: A NYDOP-3.1.1 / B1-13's identification number-2013-0001, "The Castle District lockers renewal - Phase I" project called supply-related finishing works for the technical inspection tasks include finishing construction work in the project has not Torna Street and Goldsmith Street and the Ikvahíd - Castle District pavement sections designed to cover between 29 and surface drainage Várkerület compliance of the design space. The repair coatings and surface water disposal rainwater made fedvénytervek. Needed to carry out the finishing works and execution of technical supervision tasks of conducting these proceedings. All work related to gender The finishing works are among the basic work on the project, or with the same kind. Quantity: Winning bidder to provide basic project construction work of related supply technical inspection duties following works: PUBLIC SPACE ARCHITECTURE - demolition of landscape architecture works asphalt pavement machine (330 ² area) Breakdown of 9,9 m3 of concrete pavement base machine (320 ² area) is 64 m3 dismantling dropped from debris collection, landfill disposal of 73.9 m3

Results of the modernization process _ GYSEV. General Administration building

Győr-Sopron-Ebenfurti Vasút Zrt. | Published March 30, 2016
Winner
"Fejes és Társa" Kft.
cpvs
45210000, 45442100, 45421100, 45432130, 45331100, 45311000, 45314300, 45312000

Sopron Headquarters corridors, staircase construction, mechanical and electrical partial modernization, and to protect assets and increase operational safety of the new fire and security and fire systems by installing a special function areas of the facility
Corridors, stairwells architecture, building electrical and plumbing renovation of 450 m2
Ground-floor corridors and replacement of windows in the court corridors 43 pc
Total building a new fire alarm system construction of 2725 m2
Establishment of IT server rooms and corridors of rack extinguishing system in one system
Building flying Iben, respectively. the establishment of the outer facade of a new security camera system, 1 system
Highly secure areas of the building entrance doors and windows, as well as passenger and vehicle access control system entrances to the establishment of one system
The work includes a detailed description and quantity of technical specifications which form part of the tender documentation.

Information on the contract amendment; NYDOP-2.1.1 / B-09-2f 2011-0001, Fertőrákosi cave theater -, development of educational path, serving in buildings, in order to achieve process called parking and plaza construction works subject

Sopron Megyei Jogú Város Önkormányzata | Published December 23, 2014
Winner
Laki Épületszobrász Zrt.
cpvs
45110000, 45223300, 45210000, 45453100, 45262700, 45442110, 45262522

To procurement: a contract to the "NYDOP-2.1.1 / B 09-2f-2011-0001, Fertőrákosi cave theater - for tourism development quarry store of value and value-added" as part of the project entitled Fertőrákos operating former quarry cave theater makeover, trail design, landscaping, as well as serving in buildings, parking and plaza construction of objects. Procurement quantity: Demolition work carcasses dumped debris removal with landfill fees 850 m3 reinforced concrete, bar, foot, slab, wall, step breakdown of 582 m3 of concrete surfaces, demolition of 349 m3 of load-bearing masonry infill and 331 m3 of artificial stone sidewalks Ending Ending Ending 626 m metal door structures 102 m2 grates, railings, fences breakdown, breakdown pipe railing 390 m grilles, railings, fences breakdown Wire-mesh fence, columns and base together and delivery to 575 m theater chairs demolish the auditorium, and removal of dumped 749 parking spaces and road construction Jobs Excavating 1575 m3 mirror making, finishing rolling 3600 m2 Soil layer 720 m3 channel Preparation Preparation 206 m Mechanically stabilized base layer 854 m3 Featured curbs 261 m recessed edge or progress bar 917 m road signs and guiding boards 11 x Fire Facilities Fire water tank 150 m3 Tavern building building construction - flat roof single storey building green roofed built up area - visitor center: 158.96 m2 building usable area - visitor center: 79.87 m2 Number of floors: 1 Building height (entire building) 3.45 Architecture, statics, building engineering, electrical works for Visitors sanitary construction - flat roof single storey building green roofed built up area - water block: 103.28 m2 building usable area - water block: 70.30 m2 Number of floors: 1 Building height (entire building) 3.46 m Architecture, statics, building engineering, electrical Farm building construction works - flat-topped green roofed single storey building Built area: 192.28 m2 building usable area: 126.76 m2 Number of floors: 1 Building height (entire building) 2.88 m Architecture, statics, building engineering, electrical works Mining kind of work in the cave incorporation Tubular scaffolding and dismantling 6200 LM3 Kopogózás and debris cleansing 1200 m2 of rock bolts 700 hot-dip galvanized steel mesh 900 m2 pillar through anchors átm.42 mm 50 galvanized finish anchors 182 pcs Special headstock 84 Fiber Stone certificate Breaking, slotted and sawing machine 500 m3 C6-strength concrete filling 750 m3 Repedésmozgás control monitoring network installed 3 complete measuring unit Buffet and sanitary construction cave Net 100.80 m2 space architecture, statics, building engineering, electrical works Theatre building cave, sound and light technology without Front pipe rack 230 m2 excavation Excavating 6200 m3 mirror making 1,600 m2 of concrete substrate 149 m3 floating or heating screed 1500 m2 of load-bearing and infill masonry 281 m2 Pincefalazat 97 m2 Bulkhead construction of 664 m2 building steel structures 4 t Wood beating 95 m2 Oldalfalvakolat 3080 m2 of wall, pillar and column cover 312 m2 of concrete floors under 660 m2 Stage Housing 10 / 7.5-inch sleeper 607 m2 Larch stage covering 698 m2 of industrial flooring 892 m2 Ventilated façade of 155 m2 Larch wall covering 133 m2 Interior doors, primed steel door frame with 44 pieces of fire door placing two pieces of interior door panels 44 pcs Interior painting with surface preparation, 3370 m2 Disperse dyeing 3370 m2 Exterior wood surfaces primary, fedőmázolása 801 m2 damp proof insulation 1342 m2 floor insulation against 1,243 m2 Operating use water on 1165 m2 Rainwater insulation 2170 m2 flat roofs, heat and sound insulation of 770 m2 floor insulation 675 m2 Lifting equipment 1 COMPRESSED sandy GRAVEL ballast 192.8 m3 of concrete footings to 15.4 STEEL MOUNTING BASES AND POINT UP C16 / 20 151.2 64.3 m3 m3 MOUNTING CONCRETE BASE Irons 158.4 m3 5 cm thick Products concrete footings 34m3 PREPARATION 33 5 m3 in 1260 m2 of flat plate slab formwork shuttering CIRCULAR 124 m2 MELLVÉDFALAK formwork 90.5 m2 STEEL CONCRETE ROOF MOUNT 101.85 flat plate to concrete aggregates, 301.5 m3 AL STONE CONCRETE WALL concreting 366.5 m3 spectator diskette 159 m3 Building Services Power- and weak current building Nature Trail and construction exhibition in the cave, sound and light system without creating a compressed filling 532 m3 to 12 cm thick. 1352 m2 industrial floor 16 cm thick. Load-bearing industrial floor 95 m2 and 72 m2 masonry infill 50.50.3,5 welded hot-dip galvanizing

Information on contract modification (VII.) Neusiedl Pannonian region to develop cross-border water supply "as part of the performance of the project design tasks (PP1 Phase I)

Sopron Megyei Jogú Város Önkormányzata | Published April 10, 2015
Winner
PANNON-FERTŐ Régió Konzorcium FŐMTERV Mérnöki Tervező Zrt. (konzorcium vezetője)
cpvs
71000000, 71322200

Pannonian region Neusiedl development of cross-border water supply "supply planning tasks within a project (Phase I PP1). Pannonian region Neusiedl cross-border water supply within the framework of the project entitled Development of design tasks. Common tasks, requirements: - conducting the necessary authority and utility management meetings. - Water rights permits, construction permits from the authorities, to obtain necessary regulatory approvals and other contributions. Preparation of necessary water rights license in Environmental Impact Assessment. -The Acquisition of water rights necessary for obtaining a license environmental permit - Budget Preparation of proposals, pricing, and estimation of costs. Planned water supply networks: NA 100 approx. 400 NA 200 m approx. 500 NA 300 m approx. 3000 NA 400 m approx. M NA 9500 500 approx. 45,000 m planned water reservoirs: 2 2x1000 m3 planned water engineering, architecture: 2 x 140 l / s 1 224 l / s 1 70 l / s 1 x 27.7 l / s capacity pump station, 2 UV disinfection equipment, the transfer point five cross-country, three pieces of existing motor home conversion, water quality monitoring. Strong low-power, communications, control design

Informative contract modification (VIII.); Pannonian region Neusiedl development of cross-border water supply "supply planning tasks within a project (Phase I PP1).

Sopron Megyei Jogú Város Önkormányzata | Published April 10, 2015
Winner
PANNON-FERTŐ Régió Konzorcium, Konzorciumvezető: FŐMTERV Mérnöki Tervező Zrt.
cpvs
71000000, 71322200

Pannonian region Neusiedl development of cross-border water supply "supply planning tasks within a project (Phase I PP1). Pannonian region Neusiedl cross-border water supply within the framework of the project entitled Development of design tasks. Common tasks, requirements: - conducting the necessary authority and utility management meetings. - Water rights permits, construction permits from the authorities, to obtain necessary regulatory approvals and other contributions. Preparation of necessary water rights license in Environmental Impact Assessment. -The Acquisition of water rights necessary for obtaining a license environmental permit - Budget Preparation of proposals, pricing, and estimation of costs. Planned water supply networks: NA 100 approx. 400 NA 200 m approx. 500 NA 300 m approx. 3000 NA 400 m approx. M NA 9500 500 approx. 45,000 m planned water reservoirs: 2 2x1000 m3 planned water engineering, architecture: 2 x 140 l / s 1 224 l / s 1 70 l / s 1 x 27.7 l / s capacity pump station, 2 UV disinfection equipment, the transfer point five cross-country, three pieces of existing motor home conversion, water quality monitoring. Strong low-power, communications, control design

Information on the outcome of the process: Planning Contract Lover Sopron Spa - Preparation of licensee documentation of the design for the development of bar Swimming subject of Franz

Sopron Megyei Jogú Város Önkormányzata | Published December 23, 2015
Winner
KÖZTI Zrt.
cpvs
71322000

Design contract in Sopron Lover Spa - Preparation of licensee documentation of the design for the development of bar Ferenc Swimming subject of Design Venue: Existing Lover pool area of ​​the Lover Boulevard and Deákkúti road on the corner (u .: 7213/1), the Deákkúti road in addition to this section along field ( u .: 7208.7171), Sopron. Land area: 7213/1 u-u plot area: 30,493 m2 Regulatory Plan Effective: 7) No municipal K1 (area, building local protection) Design tasks: - ~ 8000m2 via an indoor swimming pool, sports and leisure center design Strips of existing Ferenc pool and beach area - beach - parking (200 cars, eight buses) - 33,00-spa (műugráshoz, toronyugráshoz, synchronized swimming, swimming) - 50.00 drawbridge's pool (swimming and water polo, 25, 00m racing for it) - 1 training pool - 1 submersible warm water pool - divers dry training areas 1,600 people - locker rooms about 380-380db men and women, 270db family, five groups (80fő), judicial changing rooms, gym, medical room - engineering, warehouses, workshops, transformers and other complementary operating units - sauna - kitchen, bar, restaurant - part management, business offices, meeting rooms, training room technical content licensing plan. 8.) listed below and according to Government: Existing 5.1 building demolition plan - Planning Area geodetic survey - a site plan 1: 500 - surveying plan existing, partly remaining (locally protected) building floor plans, sections, elevations 1: 100 technical specification, design archival data, photo documentation, static expertise 5.2 Scheduled condition design documentation: - an overview site plan 1: 1000 - location drawing, gardening plan 1: 100 - Architectural plans (designed floor plans, sections, elevations, further plans for understanding) 1: 100 - (Fence Plan) - industry-specific plans (swimming pool technology, kitchen technology, statics, mechanics, electricity, telecommunications, utilities, transportation and traffic engineering design, etc.) 1 100 - architect and industry-specific technical specifications, calculations - renderings, street scene - building physics - energy certificates - fire protection plan chapter - disposal - a statistical basis - design statements - utilities negotiations, utility statements - Preliminary Minutes of the official trade negotiations - (based on work by gender) cost estimate

Information regarding the outcome of the procedure; "Fertő a contract to develop the complex aquatic plant study plan to prepare"

Sopron Megyei Jogú Város Önkormányzata | Published October 5, 2015
Winner
Középülettervező Zártkörűen működő Részvénytársaság, KÖZTI Zrt.
cpvs
71400000, 71320000, 71310000

The subject of public procurement "of a contract for the complex development of Fertő aquatic plant study plan to prepare" The amount of Procurement: Design Location: Neusiedl Cancer Town to the east, a total area of ​​250 meters environment in the filling island in the lake area of ​​the current lake surface overall planning area: parcels affected areas: water area 365,000 m2 Affected area: 215.000m2 Total: 580,000 m2 Legal Environment: As all the development projects affecting the possibility of restrictions and should be explored in parallel with the new regulatory plan preparation. Planning Tasks: - Analysis and opportunities for action on the lake bed of Investigation - architectural and tájépít minds proposal worked out and the beach complex renewal attention: a complete overhaul o buildings o total utility reconstruction o the total green surface reconstruction o the total pavement reconstruction design of the reconstruction of his party forming o new functional units (sport, determination o furnishing elements - Development of design proposal to renew the water promenade - the development of design proposals of the island central're reindeer develop, renew north and south of the island portion connecting to reinforce - in the central zone, the boat harbor and a related restaurant architectural design proposal - ecological dissemination of focusing the visitor center building and the development of a related multi-purpose to use ecological demonstration, sport and recreation's and children's area - 3-star camping establishment (at least 100 tent sites) - Sports Club Design clubhouse and sports fields - four-star hotel building design - sail and accommodation building design - new Sails and port design - the existing marina expansion options of Investigation - the development of transport system in the whole area - the whole area serving central park establishment - the public transport possibilities of development - the total area of ​​coastline ecologically sustainable design - green surface examination and sustainable total area development proposal STUDY PLAN FOR TECHNICAL CONTENT 5.1 Existing state design documentation: - Planning Area geodetic survey - a site plan 1: 500 - planning area of ​​green space survey - a site plan 1: 500 - existing remaining buildings (except for the village buildings) survey plan 1: 250 5.2 Scheduled condition design documentation - thumbnail layout plan of 1: 1000 - the installation site plan, green space concept 1: 500 - designed floor plans, sections, elevations 1: 500/1: 250 - architect and industry-specific technical specifications - renderings - cost estimates (based on the core areas)

Road construction works

Sopron Megyei Jogú Város Önkormányzata | Published October 10, 2017  -  Deadline November 6, 2017
cpvs
45233120, 45111290, 77300000, 34928400, 77314100, 45232120, 45232410, 45262300, 45262310, 45110000, 45315300, 45233228, 45233220

Completion of the construction project of the project called "Kisvárkerület and Várkerület" in Sopron.

The 1st District of the Várkerület was completed, and the reconstruction of the remaining districts of the District District will be completed, touching the area between Kisvárkerület and Ötvös street - Széchenyi tér.

The contracting authority determines the magnitude of the tasks as follows:

Main job:

Public Space Architecture.

Green surfaces.

Planting 2 234 pcs.

Grassland 382 m2.

Delivery of land 350 m3.

Installation of street furniture.

Installation of street furniture and wooden gratings 130 pieces.

Faveremrácsos resin filling 5-7 cm vtg 84 m2.

1.3. natural stone and / or pavement construction in pedestrian (3 665 m2) and mixed-use (service) areas (1,387 m2), transport areas (400 m2), parking (730 m2), grassland (400 m2).

Line drainage.

Preparation of drainage ducts with prefabricated elements, with fittings, shaft 53 fm.

Placement of drainage pipes with earthworks, with gravel filling, with 6 shafts 232 fm.

2. Creation of irrigation system with 1 400 fm pressure-compensated drip pipe laying.

Surface rainwater - drainage, sewage and water connections, sewage, network, demolition and construction.

Drilling and demolition of working boats with two-sided drilling 500 m2.

The pavement of concrete, asphalt pavement is demolished 108 m2.

Ground clearance of working hours with transport 150 m3.

Preparation of soil improvement layer with compression 108 m3.

Ø150-200 mm BUILDING of a KÖA coated tubing with fittings 133 fm.

Ø160mm PP SN10 pipe construction with fittings 36 fm.

Ø 32-40 mm Construction of KPE pipe with fittings 13 fm.

Construction of a water canal with complete fittings 22 pcs.

Public lighting and power grid works (0,4kV public lighting ground cable network (construction)).

5. Road construction, traffic engineering, traffic management (6,464 m2).

5.1 Road Construction in the Quarry (Demolition, Construction Works).

Asphalt paving, border demolition with transport 527 m3.

Concrete pavement, covering, edges, pavement concrete demolition with delivery 3 448 m3.

Preparation of frost protection layer with compression 854 m3.

Creating a Ckt base is 1 022 m3.

5.2 Traffic Engineering (demolition, construction works).

Breakdown of road signs, signal lanterns, construction of 161 pcs.

Creating signs of 232 m2.

Cable protection pipe 960 m.

Equipment programming 4 pcs.

Waterworks Reconstruction.

Sewage and rainfall pipes, construction of pipelines with fittings, mines construction, earthwork (DN200, DN250, DN300 Dissolve 650.7 fm; DN150 Wastewater, drainage and precipitation connections total 50, 367.8 m).

Construction of 416 m drinking water piping and connections with earthwork (416 m span rail, 23 KPE pipe joints) built with ductile cast iron piping system (BLUTOP type or equivalent).

Retaining wall.

Existing stone and reinforced concrete (vb.). the retaining wall and its bases are demolished 47 m3.

Vb support wall 15 - 50 cm vg C30 min. concrete with base 87 m3.

Wall covering of 2 cm vtg with anti-freezing sludge hard-limestone tiles 17 m2.

Further details on the above amounts are set out in the technical specification forming part of the procurement documents.

Depending on the negotiation, the Bidder may deviate from the specified parameters.

The contracting authority is 321/2015. (X.30.) Korm. Ordinance, Section 46 (3), accepts an equivalent product.

The contracting authority draws attention to the fact that, in the case of offering an equivalent, equivalence must be verified by the tenderer in his tender.

Road construction works

Sopron Megyei Jogú Város Önkormányzata | Published November 22, 2017
cpvs
45233120, 45111290, 77300000, 34928400, 45232120, 45232410, 45262300, 45262310, 45110000, 45315300, 45233228, 45233220

Completion of the construction project of the project called "Kisvárkerület and Várkerület" in Sopron.

The 1st District of the Várkerület was completed, and the reconstruction of the remaining districts of the District District will be completed, touching the area between Kisvárkerület and Ötvös street - Széchenyi tér.

The contracting authority determines the magnitude of the tasks as follows:

Main job:

Public Space Architecture.

Green surfaces.

Planting 2 234 pcs.

Grassland 382 m2.

Delivery of land 350 m3.

Installation of street furniture.

Installation of street furniture and wooden gratings 130 pieces.

Faveremrácsos resin filling 5-7 cm vtg 84 m2.

1.3. natural stone and / or pavement construction in pedestrian (3 665 m2) and mixed-use (service) areas (1,387 m2), transport areas (400 m2), parking (730 m2), grassland (400 m2).

Line drainage.

Preparation of drainage ducts with prefabricated elements, with fittings, shaft 53 fm.

laying drainage pipe with earthwork, with gravel filling, with 6 shafts 232 fm.

2. Creation of irrigation system with 1 400 fm pressure-compensated drip pipe laying.

Surface rainwater - drainage, sewage and water connections, sewage, network, demolition and construction.

Drilling and demolition of working boats with two-sided drilling 500 m2.

The pavement of concrete, asphalt pavement is demolished 108 m2.

Ground clearance of working hours with transport 150 m3.

Preparation of soil improvement layer with compression 108 m3.

Ø150-200 mm BUILDING of a KÖA coated tubing with fittings 133 fm.

Ø160mm PP SN10 pipe construction with fittings 36 fm.

Ø 32-40 mm Construction of KPE pipe with fittings 13 fm.

Construction of a water canal with complete fittings 22 pcs.

Public lighting and power grid works (0,4kV public lighting ground cable network (construction)).

5. Road construction, traffic engineering, traffic management (6,464 m2).

5.1 Road Construction in the Quarry (Demolition, Construction Works).

Asphalt paving, border demolition with transport 527 m3.

Concrete pavement, covering, edges, pavement concrete demolition with delivery 3 448 m3.

Preparation of frost protection layer with compression 854 m3.

Creating a Ckt base is 1 022 m3.

5.2 Traffic Engineering (demolition, construction works).

Breakdown of road signs, signal lanterns, construction of 161 pcs.

Creating signs of 232 m2.

Cable protection pipe 960 m.

Equipment programming 4 pcs.

Waterworks Reconstruction.

Sewage and rainfall pipelines, construction of pipelines with fittings, mines construction, earthwork (DN200, DN250, DN300 Dissolve 650.7 fm; DN150 Wastewater, erosion and rainfall total 50, 367.8 m).

Construction of 416 m drinking water piping and connections with earthwork (416 m span rail, 23 KPE pipe joints) built with ductile cast iron piping system (BLUTOP type or equivalent).

Retaining wall.

Existing stone and reinforced concrete (vb.). the retaining wall and its bases are demolished 47 m3.

Vb support wall 15 - 50 cm vg C30 min. concrete with base 87 m3.

Wall covering of 2 cm vtg with anti-freezing sludge hard-limestone tiles 17 m2.

Further details on the above amounts are set out in the technical specification forming part of the procurement documents.

Depending on the negotiation, the Contracting Authority may deviate from the specified parameters.

The contracting authority is 321/2015. (X.30.) Korm. Ordinance, Section 46 (3), accepts an equivalent product.

The contracting authority draws attention to the fact that, in the case of offering an equivalent, equivalence must be verified by the tenderer in his tender.

Road construction works

Sopron Megyei Jogú Város Önkormányzata | Published November 22, 2017  -  Deadline December 27, 2017
cpvs
45233120, 45111290, 77300000, 34928400, 77314100, 45232120, 45232410, 45262300, 45262310, 45110000, 45315300, 45233228, 45233220

Completion of the construction project of the project called "Kisvárkerület and Várkerület" in Sopron.

The 1st District of the Várkerület was completed, and the reconstruction of the remaining districts of the District District will be completed, touching the area between Kisvárkerület and Ötvös street - Széchenyi tér.

The contracting authority determines the magnitude of the tasks as follows:

Main job:

Public Space Architecture

green surfaces

Planting 2 234 pcs

Grassland 382 m2

Delivery of land 350 m3

Installation of street furniture

Installation of street furniture and wooden gratings 130 pieces

Faver grilles resin filling 5-7 cm vtg 84 m2

1.3. (400 m2), parking lot (730 m2), masonry (400 m2), natural stone and / or pavement construction in pedestrian (3 665 m2) and mixed use

Line drainage

Preparation of drainage ducts with prefabricated elements, with fittings, shaft 53 fm

laying drainage pipe with earthwork, with gravel filling, with 6 shafts 232 fm

2. Creation of irrigation system with 1 400 fm pressure-compensated drip pipe laying

Surface rainwater - drainage, sewage and water connections, sewage, network, demolition and construction

Drilling and demolition of working boats with two-sided drilling 500 m2

The pavement of concrete, asphalt pavement is demolished 108 m2

Ground clearance of working hours with transport 150 m3

Preparation of soil improvement layer with compression 108 m3

Ø150-200 mm BUILDING of a KÖA coated tubing with fittings 133 fm

Ø160mm PP SN10 pipe construction with fittings 36 fm

Ø 32-40 mm Construction of KPE pipe with fittings 13 fm

Construction of a water canal with complete fittings 22 pcs

Public lighting and power grid works (0,4 kV public lighting ground cable network (construction))

5. Road construction, traffic engineering, traffic management (6,464 m2)

5.1 Road Construction at the Quarry (Demolition, Construction Works)

Asphalt paving, border demolition with transport 527 m3

Concrete pavement, covering, edges, pavement concrete demolition with delivery 3 448 m3

Preparation of frost protection layer with compression 854 m3

Creating a Ckt base is 1 022 m3

5.2 Traffic Engineering (Demolition, Construction Works)

Breakdown of road signs, signal lanterns, construction of 161 pcs

Creating signs of 232 m2

Cable protection pipe 960 m

Equipment programming 4 pcs

Waterworks Reconstruction

(DN200, DN250, DN300, DN250, DN350, DN150, DN150, DN150, Wastewater, Eaves and Precipitation Connections total 50 pieces, 367.8 m), Sewage and Soil Canal Grounds,

Construction of 416 m drinking water piping and connections with earthwork (416 m span cable, 23 KPE pipe connections) with ductile cast iron piping system (BLUTOP type or equivalent)

retaining wall

Existing stone and reinforced concrete (vb.). the retaining wall and its bases are demolished 47 m3

Vb support wall 15 - 50 cm vg C30 min. concrete with base 87 m3

Wall covering of 2 cm vtg with anti-freezing sludge hard-limestone tiles 17 m2

Further details on the above amounts are set out in the technical specification forming part of the procurement documents.

Depending on the negotiation, the Bidder may deviate from the specified parameters.

The contracting authority is 321/2015. (X.30.) Korm. Ordinance, Section 46 (3), accepts an equivalent product.

The contracting authority draws attention to the fact that, in the case of offering an equivalent, equivalence must be verified by the tenderer in his tender.