Public tenders for architect, architecture in Paks Hungary

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural, construction, engineering and inspection services

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published March 25, 2016
cpvs
71000000

-

Architectural, construction, engineering and inspection services

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published October 13, 2016  -  Deadline November 15, 2016
cpvs
71000000, 71351200, 71600000

Preparation of independence while retaining four blocks the main buildings of the structural and functional adequacy of the framework for capacity-reservation The emerging two blocks munkagödrének continuous dewatering task was made calculation, analysis, documentation review based on expert opinion - Paks Nuclear Power Plant of 500 MW electric power increased performance VVER-440/213 type 1 , control changes made on the basis of the comments, and negotiating improvements to the controls.

Architectural, construction, engineering and inspection services

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published October 13, 2016  -  Deadline November 14, 2016
cpvs
71000000, 71630000, 71351000

The Paks nuclear power plant buildings of the main structural and functional adequacy of impact occurring due to seasonal changes in groundwater levels túlkonszolidációs process, and the uneven building movement involved. The movement and its magvalósult process, verifying the projected end of the extended running time effects occurred in the past decade, and the actual state of the main buildings of movement and control of the consequences is the subject of aging management program. Check the effect of the process and included a description of the soil temporal behavior of the constitutive model creation, groundwater levels, soil-building interaction model for the creation and verification of control, the measured building motion data, the motion prognosis of the extended running time, the main structural model and the strength of conformity to the standard operating and LOCA loads, taking into account the effects caused by the uneven motion building. It was concluded that the structural integrity is maintained to the extent that it provides for the containment required safety function. As a continuation of this work has been included in the safety class (ABOS) buildings, structures and facilities-line monitoring of structural and functional adequacy of the earthquake subsidence impacts.

Architectural, construction, engineering and inspection services

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published May 12, 2017
Winner
Pöyry Erőterv Energetikai Tervező és Vállalkozó Zrt.
cpvs
71000000, 71630000, 71351000

Analysis of a contract for the preparation / Safety functions Buildings structural and functional adequacy.

As a continuation of this work has been included in the monitoring safety class (ABOS) buildings, structures and linear facilities structural and functional adequacy of the earthquake subsidence impacts.

It is therefore necessary to analyze how the Paks NPP block extended 1-4, 2032-2037 holder to affect operation of the impact caused by the dewatering growth on building structures movement.

This requires the following tasks:

1. meet the demands of the above analyzes local hydrogeological model should be established and verified on the basis of the measurement data,

2 shall be carried out to assess the impact of the drainage of groundwater level based on a trench dewatering, erection and technical solutions,

3. You must determine the effect of excavation dewatering and immediate end of battery life based on expected building movement suitable soil building and soil constitutive model,

4. you have to determine which buildings and structures affected by depression, which includes a mandatory basis of the main buildings, and consideration of other buildings under the influence of depression,

5 must be carried out structural and functional control of the main building, as well as in the previous point to the other buildings affected by dewatering the integrity and function of control by the security classification (ABOS)

6. To be specified in the motion for leave to intervene building measure that requires even permitted the integrity and function of the structure point of view, but immediate technical measures to stop or modify the pumping,

7. technical level plan should be developed to monitor the geotechnical, hydrogeological, and the building-time movement monitoring during the construction works and the subsequent proposal

8 proposal should be given to carrying out the dehydration in order to minimize the impact block 1-4.

The job also involves documentation of the methodology and evaluation criteria, which the Customer acceptance of the conditions of implementation.

A detailed technical description feladatspecifikációt include procurement in the procurement documents.

Architectural, construction, engineering and inspection services

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published October 31, 2015  -  Deadline December 15, 2015
cpvs
71000000

A contract / non-linear analysis of the impact of Unit 3 and 4 reactor building movement and evaluation.

undertake related MVM Paks. Technological systems for buildings of architectural and maintenance work from 2012 to 2016. years

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published March 8, 2017
Winner
Duna Center Therm Kereskedelmi és Szolgáltató Kft.
cpvs
45000000, 45262500, 45262650, 45262700, 45421160

The object of the contract:
undertake related Paks Nuclear Power Plant Zrt. Technological systems of buildings of architectural and maintenance work from 2012 to 2016. years
quantity:
. Plant located in the area of ​​Paks Nuclear Power Plant technologies for buildings, constructions related master builder maintenance and repair work (including: masonry, building construction, cold, warm covering works) carried out, including:
1. Masonry works (in the range of about 40%.): Floor and wall coverings and PVC cold, repair of plaster; Road, sidewalk repair of concrete and asphalt pavement of; buildings, construction of concrete structures for engraving and repair.
2. building construction (to the extent of about 60%.): Metal structures, doors, repairing locks, replacing; grilles, railings, repairing fences, replenishment; suspended ceilings, false floors to improve, supplementation.

undertake related Paks Nuclear Power Plant Zrt. Technological systems of buildings of architectural and maintenance work from 2012 to 2016. Information-years of the contract amendment

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published August 5, 2016
Winner
Duna Center Therm Üzemi Szolgáltató Kft.
cpvs
45000000, 45262500, 45262650, 45262700, 45421160

The subject of the public procurement:
undertake related Paks Nuclear Power Plant Zrt. Technological systems of buildings of architectural and maintenance work from 2012 to 2016. years
The amount of purchases:
. Plant located in the area of ​​Paks Nuclear Power Plant technologies for buildings, constructions related master builder maintenance and repair work (including: masonry, building construction, cold, warm covering works) carried out, including:
1. Masonry works (in the range of about 40%.): Floor and wall coverings and PVC cold, repair of plaster; Road, sidewalk repair of concrete and asphalt pavement of; buildings, construction of concrete structures for engraving and repair.
2. building construction (to the extent of about 60%.): Metal structures, doors, repairing locks, replacing; grilles, railings, repairing fences, replenishment; suspended ceilings, false floors to improve, supplementation.

Nuclear safety equipment

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published March 7, 2015
Winner
ŠKODA JS a.s.
cpvs
35113210, 45310000, 38810000, 71323100

Instrumentation reconstruction of control and safety systems (SZBVR) and Reactor Power Control System (RTSZ) The reconstruction aims operated by the Contracting Paks Nuclear Power Plant (PAE) SZBVR-in, and the reconstruction of organically related RTSZ-of the age level of adequate and modern - the security and reliability requirements of a satisfactory service life extension (probably 20 years) - the use of tools and solutions. The extent of the reconstruction of equipment, functional units in the scope of the following functional units can be divided into: - SZBVR - Central control logic; I / O interfaces to external systems commands and other signs of receiving / sending, communication interfaces (Reactor System (RVR) Technology Computer Network (MSW) and the connection through blocks of information system - - Rod Motion Controller - Rod-positioning, - Block Computer (BSZG) and Zónamonitorozó system (Verona) - Block control room / Spare control room and service for human-machine interfaces - Power supply system rúdmozgató drives -. Power supply system control logic - RTSZ - control and priority logic - neutron frissgőznyomás power and control - input and output interfaces to send and receive commands and other signs of external systems, communication interfaces - electrical supply system - Block control room / control room and Replacement Service for Human-Machine contact surfaces - Diagnostic systems;. - Dynamometer test configuration - Simulator modification (hardware and software). The transformation of the boundaries of the scale transformation: - located on the E-303 room equipment and the wiring between them - the (room E-306) and control room tartalékvezénylői (E-302-inch spaces) human-machine interface surface display, transformation management tools, as well as the necessary cabling. Not included in the scope of the transformation rúdhajtást moving electric motors and their field wiring (including intermediate boxes, and the hermetic wall tours). It also will not be extinguished with the position transducers and cabling, as well as intermediate boxes, hermetic penetrations. With advanced process control elements may be less sensitive areas in accordance with the environmental parameters (temperature, humidity, dust) so that the selected product requirements needed to convert the ventilation system - especially the direct and risks associated with the currently blowing cabinets cease. Additional conversion must change the scope of a full-scale simulator of PAE functionality, as well as contact surface of the human-computer control room of the extent of the changes. The dynamometer service functions to be implemented for each building (the first and the third block). These should include all the logical unit testing and maintenance of appliances and equipment. (. This design is preferable to mechanical dynamometer service, as well as the test function merge) Additional activities in the scope of the following services and activities include: - the design, manufacture, assembly tasks that the scope of the reconstruction of the overall management and coordination - Subcontracts comprehensive management, - operating risk management process, project risk monitoring, preparation of manufacturing, installation, modification, authorization documents to the requirements of Regulation (NSC) 11.) -. to answer official questions, assistance for an authorization, - the operation of a quality management system - design and documenting - functional analysis (functions, multi-level formal definition) - Development of architecture, allocation of functional responsibilities - Ergonomics of human-machine interface design - technical, export and demolition plans - Amendments to fit control systems related to the design - production and delivery, - product certification, - manufacturer's borrowings (Factory Acceptance Test, FAT) implementation - Establishment of temporaries required and decompose - existing systems equipment for demolition, - installation and assembly - on-site installation (single and operating tests) - test run (support) - Preparation of operating documents: - operating instructions - Technical Specification - Maintenance Instructions - teaching materials - Change Final Safety Analysis Report (Final Safety Report) - simulator makeover: - Introduction of the implemented system functions for the PAE full-scale simulator instructor - for developing during the scheduled over several years to establish certain conditions other than Unit

Grain silos in the context of the construction of TOP 4.7.0-15-2015-0021 identification number of applications under the terms of a contract - 2.sz.szerződésmódosítás

Cereal Agrilogistics Kft | Published January 8, 2016
Winner
HEVESGÉP Kft.
cpvs
45223000, 45112400, 45262310, 45310000, 45331210

Procurement subject: Grain storage silos on the basis of the framework conditions for the construction of SEQ ID NO TOP 4.7.0-15-2015-0021 tender a contract. Public procurement quantity: Substructure: -420 m3 trench excavation -240 m3 of reinforced concrete bar - foot - disc with basic preparation -1 klt deep foundation preparation -2 klt reinforced concrete substructure metal silos install a ventilation system incorporating a complete Body (technology) 2 new - 1321 m3 capacity - metal silo construction, the associated technology, on-site installation or the necessary technological and electrical works. Bidders' attention: a detailed definition of the tasks of the technical and quality requirements imposed on materials, design documentation volumes sent as an attachment to the RFP documentation, technical description, unpriced budgets and construction permit with the reservation number 201500032029 ÉTDR ügyazonosító included. The contractor responsible for carrying out the technical content required under the construction plans and building permits occupied. The investment does not provide a margin Contracting present. The contractor is also responsible for: surveillance of the working area required; Preparing measurable architectures -all temporary construction of water supply and electricity supply and inspection of construction projects required; -all Administrative, technical, or other tasks that transfers the Customer is required to construct plans set out in the state; -the completed facility contract law, proof of authorization conformity, -all preparing a document that the conduct of the operation of the facility, safe operation / use necessary -üzempróbák; and transfer of information and preparation of as-built plans, and the preparation and transmission of necessary occupancy permit submission of documentation to the Customer, shape and number of copies specified by the Customer; -all formed in connection with construction work, demolition debris and construction waste collection and removal, after completion of work orders status before the start of construction staging areas involved in the restoration of proper execution; of the environment, caused environmental damage in buildings, repair the damage and supplying the warranty obligations;

Grain silos in the context of the construction of TOP 4.7.0-15-2015-0021 identification number of applications under the terms of a contract - No. 1. contract modification

Cereal Agrilogistics Kft | Published December 18, 2015
Winner
HEVESGÉP Kft.
cpvs
45223000, 45112400, 45262310, 45310000, 45331210

Procurement subject: Grain storage silos on the basis of the framework conditions for the construction of SEQ ID NO TOP 4.7.0-15-2015-0021 tender a contract. Public procurement quantity: Substructure: -420 m3 trench excavation -240 m3 of reinforced concrete bar - foot - disc with basic preparation -1 klt deep foundation preparation -2 klt reinforced concrete substructure metal silos install a ventilation system incorporating a complete Body (technology) 2 new - 1321 m3 capacity - metal silo construction, the associated technology, on-site installation or the necessary technological and electrical works. Bidders' attention: a detailed definition of the tasks of the technical and quality requirements imposed on materials, design documentation volumes sent as an attachment to the RFP documentation, technical description, unpriced budgets and construction permit with the reservation number 201500032029 ÉTDR ügyazonosító included. The contractor responsible for carrying out the technical content required under the construction plans and building permits occupied. The investment does not provide a margin Contracting present. The contractor is also responsible for: surveillance of the working area required; Preparing measurable architectures -all temporary construction of water supply and electricity supply and inspection of construction projects required; -all Administrative, technical, or other tasks that transfers the Customer is required to construct plans set out in the state; -the completed facility contract law, proof of authorization conformity, -all preparing a document that the conduct of the operation of the facility, safe operation / use necessary -üzempróbák; and transfer of information and preparation of as-built plans, and the preparation and transmission of necessary occupancy permit submission of documentation to the Customer, shape and number of copies specified by the Customer; -all formed in connection with construction work, demolition debris and construction waste collection and removal, after completion of work orders status before the start of construction staging areas involved in the restoration of proper execution; of the environment, caused environmental damage in buildings, repair the damage and supplying the warranty obligations;

Grain silos in the context of the construction of TOP 4.7.0-15-2015-0021 identification number of applications under the terms of a contract - results

Cereal Agrilogistics Kft | Published December 21, 2015
Winner
HEVESGÉP Kft.
cpvs
45223000, 45112400, 45262310, 45310000, 45331210

Procurement subject: Grain storage silos on the basis of the framework conditions for the construction of SEQ ID NO TOP 4.7.0-15-2015-0021 tender a contract. Public procurement quantity: Substructure: -420 m3 trench excavation -240 m3 of reinforced concrete bar - foot - disc with basic preparation -1 klt deep foundation preparation -2 klt reinforced concrete substructure metal silos install a ventilation system incorporating a complete Body (technology) 2 new - 1321 m3 capacity - metal silo construction, the associated technology, on-site installation or the necessary technological and electrical works. Bidders' attention: a detailed definition of the tasks of the technical and quality requirements imposed on materials, design documentation volumes sent as an attachment to the RFP documentation, technical description, unpriced budgets and construction permit with the reservation number 201500032029 ÉTDR ügyazonosító included. The contractor responsible for carrying out the technical content required under the construction plans and building permits occupied. The investment does not provide a margin Contracting present. The contractor is also responsible for: surveillance of the working area required; Preparing measurable architectures -all temporary construction of water supply and electricity supply and inspection of construction projects required; -all Administrative, technical, or other tasks that transfers the Customer is required to construct plans set out in the state; -the completed facility contract law, proof of authorization conformity, -all preparing a document that the conduct of the operation of the facility, safe operation / use necessary -üzempróbák; and transfer of information and preparation of as-built plans, and the preparation and transmission of necessary occupancy permit submission of documentation to the Customer, shape and number of copies specified by the Customer; -all formed in connection with construction work, demolition debris and construction waste collection and removal, after completion of work orders status before the start of construction staging areas involved in the restoration of proper execution; of the environment, caused environmental damage in buildings, repair the damage and supplying the warranty obligations;
  • 1