Public tenders for architect, architecture in Miskolc Hungary

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

"Labor-Foldes Francis High School renovation" No.1 contract modification

Miskolc Megyei Jogú Város Önkormányzata | Published December 1, 2014
Winner
ORNAMENT 2000 Építőipari, Kereskedelmi és Szolgáltató Kft.
cpvs
45210000

The existing two-classroom building permit is not required internal transformations of the following functional areas to be converted architect and engineering plans and specifications as part of the tender documents by:

Architectural, engineering and planning services

Miskolc Megyei Jogú Város Önkormányzata | Published March 18, 2017
cpvs
71240000, 71245000

The Miskolctapolcai Bath II. within the framework of the provision related to the rate design contract design services.

Preparation of detailed design documentation relating to procurement procedures set out in the published program design basis (2352 square meters of water surface bath) + + optional participation in the execution of works in the designer's leadership kivielezés.

Understanding Basic Concepts based on the licensee's design documentation:

Bath Building.

The roof of the pool house to be opened in order to solve the natural ventilation.

Ground floor.

The connection design and design concept based on linking the two buildings in other places contractor is responsible.

First floor.

If the room will darken the columns and the edge of the gallery, projectors megvetíthetjük the inside of the glass curtain wall gave canvas.

II. floor.

The goal is to give the top level view of the swimmers not only of the valley, but the direction of the surrounding hills.

III. floor.

These spaces are only available for staff and artists.

The licensee plans on the basis of the following spa pools will be established

Indoor spa, swimming pool open all year round:

Paddling pool.

Great pool.

Slide Pool.

Sauna plunge pool.

Outdoors, year-round swimming pools:

Jacuzzi.

Drifting pool.

Water Lily Pool.

Fairy Rose. Pool.

Outdoors, in a summer-season pools:

Wellness pool.

Parental pool.

Child & baby pool.

Outdoor swimming pool.

The capacity of these basins and the exact parameters of the surface of the water contained in the technical lire.

develop solutions to ensure a barrier-free transportation within the installation, barrier-free routes.

The Client is a full export plan expects the contractor to which all the engineering plans for implementation include the full responsibility of disciplines agreed between the way the conciliation coated and related materials attached to it has designed specialized companies from product designs as well.

The investment is positive in terms of mandatory elbírálású specialized authorities and service providers to conduct negotiations, the negotiation protocols are part of the detailed design documentation, design documentation without a receipt will not be part of Customer.

The contractor will water rights based on the completed design plan construction plans dossier, the acquisition of water rights permit.

Architectural, engineering and planning services

Miskolc Megyei Jogú Város Önkormányzata | Published January 9, 2016  -  Deadline January 29, 2016
cpvs
71240000, 71245000

Architectural, engineering and planning services

Architectural, engineering and planning services

Miskolc Megyei Jogú Város Önkormányzata | Published November 20, 2015  -  Deadline December 14, 2015
cpvs
71240000, 71245000

Építészeti, mérnöki és tervezési szolgáltatások

Architectural, engineering and planning services

Miskolc Megyei Jogú Város Önkormányzata | Published December 16, 2015  -  Deadline January 8, 2016
cpvs
71240000, 71245000

Architectural, engineering and planning services

Architectural, engineering and planning services

Miskolc Megyei Jogú Város Önkormányzata | Published October 31, 2015  -  Deadline December 14, 2015
cpvs
71240000, 71245000

The Miskolctapolcai Lido II. within the framework of the performance-related design services camel pace of life of the contract.

"A contract of Miskolc Greek Catholic cathedral church building environment for organizing" adopted by the outcome of the proceedings

Miskolci Apostoli Exarchátus | Published March 18, 2015
Winner
NOVIENT Kft.
cpvs
45000000, 45112700

Subject: "a contract of Miskolc Greek Catholic cathedral church building environment for organizing" Quantity: 3526 Miskolc, Wheat Background 4090/1. Sort hrsz. can be accessed on real property consisting of the church environment, muffler slope and retaining wall design, landscape architecture development of the area, in addition to the existing car park surface modification, on the basis of the call for proposals and documentation, as well as the technical specifications and unpriced budget, the provisions of the relevant laws in force in accordance with . The call for proposals, the documentation or the technical specifications and materials described unpriced budget brand, Contracting equivalent product also adopt other products instead. The designations are shown only to a clear definition of the nature of the object. For the sake of comparability of offers meaningful, corresponding unpriced budget Tender for Procurement subject matter made available to the Bidders, which should not change the content of any form, either! Unpriced change the budget (expansion, leaving items etc) may result in the tender invalid!

"Miskolc, Petofi street. 1-3. - Interior architectural works "- Part 5, No. 2. Information regarding contract modification

Miskolc Holding Önkormányzati Vagyonkezelő Zrt. | Published November 7, 2014
Winner
Alarm Elektronika Kft.
cpvs
45200000, 45210000, 31625000

Subject: "Miskolc, Petofi street. 1-3. - Interior architectural works "- Part 5 Brief Description of the building: The building consists of two parts, the so-called. head of buildings and associated side buildings. The annex was built earlier, the building later became the head or side. have built a small brick building, the World Cup. slab structure, part basement, ground floor and two levels of pitch, high roof section. The Petofi street parallel to part of a building facade of plaster, plaster stone powder, which is most in need of repair, roofing slate, final ceiling of the building is not insulated. The building is 480 m2. The ground and first floors of offices, corridors, toilets, and their rooms are serving, mix. The building is equipped with age-appropriate at the time windows, and heating system. The energy is just renovated outbuilding, the only building in the head and front windows, renovation of the heating system is off. Part 5: High-security alarm, vaccines, cameras and servers conditioning information center: 1 system

"Miskolc, Petofi street. 1-3. - Interior architectural works "- Part 4, No. 2. Information regarding contract modification

Miskolc Holding Önkormányzati Vagyonkezelő Zrt. | Published November 7, 2014
Winner
LANEXPERT Kft.
cpvs
45200000, 45210000

Subject: "Miskolc, Petofi street. 1-3. - Interior architectural works "- Part 4 Brief Description of the building: The building consists of two parts, the so-called. head of buildings and associated side buildings. The annex was built earlier, the building later became the head or side. have built a small brick building, the World Cup. slab structure, part basement, ground floor and two levels of pitch, high roof section. The Petofi street parallel to part of a building facade of plaster, plaster stone powder, which is most in need of repair, roofing slate, final ceiling of the building is not insulated. The building is 480 m2. The ground and first floors of offices, corridors, toilets, and their rooms are serving, mix. The building is equipped with age-appropriate at the time windows, and heating system. The energy is just renovated outbuilding, the only building in the head and front windows, renovation of the heating system is off. Part 4: design, construction CAT6 computer network: 1

"Miskolc, Petofi street. 1-3. - Interior architectural works "- Part 2, No. 2. Information regarding contract modification

Miskolc Holding Önkormányzati Vagyonkezelő Zrt. | Published November 7, 2014
Winner
VJB Magyarország Kft.
cpvs
45200000, 45210000, 45320000, 45331100

Subject: "Miskolc, Petofi street. 1-3. - Interior architectural works "- Part 2 Brief Description of the building: The building consists of two parts, the so-called. head of buildings and associated side buildings. The annex was built earlier, the building later became the head or side. have built a small brick building, the World Cup. slab structure, part basement, ground floor and two levels of pitch, high roof section. The Petofi street parallel to part of a building facade of plaster, plaster stone powder, which is most in need of repair, roofing slate, final ceiling of the building is not insulated. The building is 480 m2. The ground and first floors of offices, corridors, toilets, and their rooms are serving, mix. The building is equipped with age-appropriate at the time windows, and heating system. The energy is just renovated outbuilding, the only building in the head and front windows, renovation of the heating system is off. Part 2: Office building interior renovation work & office building plumbing works: 338.84 m2

"In carrying out full-scale reconstruction TOP 5.5.0-09-11. Owl building construction?" No. 2 contract modification

Miskolc Megyei Jogú Város Önkormányzata | Published January 6, 2016
Winner
Gerixon Tervező és Kivitelező Kft.
cpvs
45223200, 45110000, 45262600, 45421110, 45430000, 45231100, 45233251

Within the framework of a contract to a "Miskolc, Upper Majláth-terminus of an elevated level of service development in place to stop the building of the rehabilitation of the Owl" called, TOP 5.5.0-09-11. related to projects under construction are performing Owl building during construction works full-scale reconstruction. The contractor responsible for the Owl building in a complete reconstruction - complete demolition of 700 m2 building ground floor - Strengthening 138 m2 of basement slab, construction material and reinforcement of foundations, thermal insulation, windows and doors, building associated with geothermal heating mechanical and electrical systems - 485 m2 at ground floor: new load-bearing structure and interior partitions construction, skilled labor, complete building engineering and electrical design, barrier-free elevator installation - 373 m2 floor level: a new architecture and interior partitions construction, skilled labor, complete building engineering and electrical design - interior finishes, joinery (built-in counters, kitchenette), painting and decorating contractor shall, in addition: - in the full implementation of the investment to ensure the smooth operation of electric traffic, electric transport maintenance - The bus stop locations of temporary relocation / outsourcing, of which Bidder shall be provided at its own expense -. the operation of ticket offices during the construction period of the current container provided to maintain and, where ticket scheme locality located in the building operation of the container shipment from the Miskolc Municipal Transport Company's site - housed in the building ticket scheme village (external access option by passengers) no later than 11/30/2015 up to ensure that the absence of contractor's expense, other means should be allowed to ticket sales.

"In carrying out full-scale reconstruction-related projects under the TOP-5.5.0-09-11. No Owl construction building construction works" contract amendment -Tájékoztató

Miskolc Megyei Jogú Város Önkormányzata | Published November 27, 2015
Winner
Gerixon Tervező és Kivitelező Kft.
cpvs
45223200, 45110000, 45262500, 45262600, 45421110, 45430000, 45231100, 45233251

Within the framework of a contract to a "Miskolc, Upper Majláth-terminus of an elevated level of service development in place to stop the building of the rehabilitation of the Owl" called, TOP 5.5.0-09-11. related to projects under construction are performing Owl building during construction works full-scale reconstruction. The contractor responsible for the Owl building in a complete reconstruction - complete demolition of 700 m2 building ground floor - Strengthening 138 m2 of basement slab, construction material and reinforcement of foundations, thermal insulation, windows and doors, building associated with geothermal heating mechanical and electrical systems - 485 m2 at ground floor: new load-bearing structure and interior partitions construction, skilled labor, complete building engineering and electrical design, barrier-free elevator installation - 373 m2 floor level: a new architecture and interior partitions construction, skilled labor, complete building engineering and electrical design - interior finishes, joinery (built-in counters, kitchenette), painting and decorating contractor shall, in addition: - in the full implementation of the investment to ensure the smooth operation of electric traffic, electric transport maintenance - The bus stop locations of temporary relocation / outsourcing, of which Bidder shall be provided at its own expense -. the operation of ticket offices during the construction period of the current container provided to maintain and, where ticket scheme locality located in the building operation of the container shipment from the Miskolc Municipal Transport Company's site - housed in the building ticket scheme village (external access option by passengers) no later than 11/30/2015 up to ensure that the absence of contractor's expense, other means should be allowed to ticket sales.

"In carrying out full-scale reconstruction of the building construction works Owl" result prospectus

Miskolc Megyei Jogú Város Önkormányzata | Published October 7, 2015
Winner
Gerixon Tervező és Kivitelező Kft.
cpvs
45223200, 45110000, 45262500, 45421110, 45430000, 45231100, 45233251, 45262600

Within the framework of a contract to a "Miskolc, Upper Majláth-terminus of an elevated level of service development in place to stop the building of the rehabilitation of the Owl" called, TOP 5.5.0-09-11. related to projects under construction are performing Owl building during construction works full-scale reconstruction. The contractor responsible for the Owl building in a complete reconstruction - complete demolition of 700 m2 building ground floor - Strengthening 138 m2 of basement slab, construction material and reinforcement of foundations, thermal insulation, windows and doors, building associated with geothermal heating mechanical and electrical systems - 485 m2 at ground floor: new load-bearing structure and interior partitions construction, skilled labor, complete building engineering and electrical design, barrier-free elevator installation - 373 m2 floor level: a new architecture and interior partitions construction, skilled labor, complete building engineering and electrical design - interior finishes, joinery (built-in counters, kitchenette), painting and decorating contractor shall, in addition: - in the full implementation of the investment to ensure the smooth operation of electric traffic, electric transport maintenance - The bus stop locations of temporary relocation / outsourcing, of which Bidder shall be provided at its own expense -. the operation of ticket offices during the construction period of the current container provided to maintain and, where ticket scheme locality located in the building operation of the container shipment from the Miskolc Municipal Transport Company's site - housed in the building ticket scheme village (external access option by passengers) no later than 11/30/2015 up to ensure that the absence of contractor's expense, other means should be allowed to ticket sales. The deadline for completion (successful technical delivery and acceptance): 12.15.2015. Day.

Complex reconstruction of Miskolc City Hall building complex - No. 4. contract modification

Miskolc Megyei Jogú Város Önkormányzata | Published March 16, 2015
Winner
Kalotherm Zrt.
cpvs
45260000, 45300000, 45310000, 45330000, 45350000, 45400000, 45453000, 45212314, 45213150

During the City Hall Square No. 8 complex reconstruction of the City Hall building complex framework - III. courtyard new customer traffic "hall" construction, the building's overall exterior and interior completion (master builder, skilled, electrical, plumbing), construction works and equipment, the need for all branch connections by building, connecting the existing wings indoor-outdoor complex transformation turnkey (I section). - Hunyadi utca 2. vacant lots under No new wing construction, completion of the building's total external and internal (master builder, skilled, electrical, plumbing), construction works and equipment, the need for all branch connections deployment, turnkey (Phase II). - Existing historic buildings I-II-III. court buildings heating system to standardize, connect to district heating is required for all branch connections, and by completing the existing buildings outside, street facade renovation (master builder, skilled, electric) construction work on the doors and windows repair or internal sash replacement, new entrance gates building (III section) as well as the construction of parking, pavement construction, landscape architecture, construction and utility connections for the operation of the facility within the facility Optional items: -. III. performing yard east side of the historic building interior renovation (master builder, skilled, electrical, plumbing) construction works required for all branch connections, and by ventilation (air conditioned) processed to completion (Section IV). - I and II. partial renovation of the existing building yard, hydrants placement, completion of the building plans specified level builder, crafts, electrical, plumbing), construction works and installation of all the necessary construction of branch connections (V-VI. No ...

Complex reconstruction of Miskolc City Hall building complex - No. 2 contract modification

Miskolc Megyei Jogú Város Önkormányzata | Published March 13, 2015
Winner
Kalotherm Zrt.
cpvs
45260000, 45300000, 45310000, 45330000, 45350000, 45400000, 45453000, 45212314, 45213150

During the City Hall Square No. 8 complex reconstruction of the City Hall building complex framework - III. courtyard new customer traffic "hall" construction, the building's overall exterior and interior completion (master builder, skilled, electrical, plumbing), construction works and equipment, the need for all branch connections by building, connecting the existing wings indoor-outdoor complex transformation turnkey (I section). - Hunyadi utca 2. vacant lots under No new wing construction, completion of the building's total external and internal (master builder, skilled, electrical, plumbing), construction works and equipment, the need for all branch connections deployment, turnkey (Phase II). - Existing historic buildings I-II-III. court buildings heating system to standardize, connect to district heating is required for all branch connections, and by completing the existing buildings outside, street facade renovation (master builder, skilled, electric) construction work on the doors and windows repair or internal sash replacement, new entrance gates building (III section) as well as the construction of parking, pavement construction, landscape architecture, construction and utility connections for the operation of the facility within the facility Optional items: -. III. performing yard east side of the historic building interior renovation (master builder, skilled, electrical, plumbing) construction works required for all branch connections, and by ventilation (air conditioned) processed to completion (Section IV). - I and II. partial renovation of the existing building yard, hydrants placement, completion of the building plans specified level builder, crafts, electrical, plumbing), construction works and installation of all the necessary connection branch out ...

Information on the amendment of contracts - Part 1 -TIOP surgery Onko-2.2.6

B-A-Z Megyei Kórház és Egyetemi Oktató Kórház | Published November 23, 2015
Winner
FK-Raszter Építő Zrt
cpvs
45215100, 45221000, 45223300, 45232221

The context of SIOP-2.2.6-12 / 1B / 2013-0023 project construction contract for the Borsod-Abaúj-Zemplén County Hospital and University Teaching Hospital to establish onco-surgery offers an array of Borsod-Abaúj-Zemplén County Hospital and University Teaching Hospital onco-surgery design hotel blocks - production under the SIOP-2.2.6-12 / 1B-2013-0023 project. East wedged into a separate road registered (3086/16. U.). Or open-roofed gateways to the building of Internal Medicine - A 80-bed surgical onco-array and related facilities. Surgery enclosed corridor connecting to the operating room to the rooftop level - land conversion to accommodate, which is currently underway. The main parameters of the construction tasks: performing the surgery is still operating unit operating at the top level of the building will be made of Surgery. The closed aisle structure and appearance of the same building was constructed between the surgery and the Star Point building closed corridor's. Roofed open-connection design of the building has already been built and the Star Surgical point between building a similar structure. The barrier-free parking spaces and additional parking space housing 3 is established, while the rest - 16 - Spray park as gravel parking lot will be built. The main entrance on the north side of the building is made of 4-way bicycle storage. Pavement designs for a new road to be built between the wiring and connecting the various buildings of the architect to include utilities and road-work site section drawings. Major volumes, net floor area: - Basement: 158.50 m2 - GROUND FLOOR: 960.55 m2 967.02 m2 FLOOR FLOOR: 950.60 m2 - COVERED OPEN-GATEWAY: 32.91 m Floor: bridge SURGERY OF THE BUILDING CONCERNED 62 73 m2 - Operating Room SURGERY LEVELS THE BUILDING OF CONCERNED: 82.30 m2 Bidder - winner of the event during performance of the contract is bound to follow the necessary legislative changes. Part 1 deals: Basic offer: - a vocational school building, adapting and connecting surgery, vocational schools, construction of the bridge Optional items: - a vocational school, internal medicine Gateway construction - surplus of around vocational school parking developing contracting the entire technical content requests the submission of the offer, but is optional in the full technical content parts identified that the order is carried out only as a function of the available resources. Part 2 deals: building a pneumatic tube system of more than 3,000 m2 onco-surgery building on the existing system rákapcsolással

# 3. modification of the contract - a contract "for the city of Miskolc improve the safety of drinking water supplies by building modern water treatment technology, Miskolctapolca serious danger of water resources" - KEOP-1.3.0 / B / 2F / 09-2010-0001

Miskolc Megyei Jogú Város Önkormányzata | Published August 26, 2015
Winner
MI-DU-HI Közös Ajánlattevő
cpvs
45252126, 45210000, 45233123, 71320000

"Due to improve the safety of the city of Miskolc water supply state of the art water purification technology by building a serious threat Miskolctapolca water base" of a contract related projects export plan preparation and construction works in accordance with FIDIC Yellow Book Requirements - KEOP-1.3.0 / B / 2F / 09-2010- 0001 The main content of the parameters of the project: The planned annual harvestable quota of 9.18 million m³ / year. Major quantities of the following, which are defined and indicative data on the basis of the indicative plan are considered. Existing facilities: Building Manager - Transformation - 291 m². Social part of the building - demolished - 96 sqm. Electric switch compartment - demolished - 250 sqm. Warehouse - demolished - 70 sqm. Wells - Pump Replacement - 48,000 m³ / d. Transformer - is to be moved - 2x1,6 MVA. Aggregator - to be moved - 14 kW. Planned facilities: Controls Building - 914 + 146 m². Reservoir pool - 2x500 m³. Storage Pool architecture - 36 sqm. Underground tanks - 1x35 m³; 1x20 m³; 1x20 m³. Sewage pumping station - 16 m³ / h. Swimming yard lines. Landscaping. Landscaping. Power. Measurement and process control. Quantitative and qualitative requirements for treated water: The treated water hardness does not vary during treatment. The tasks carried out by the contractor, local specifics stemming from the Project taking into account the geographical and sectoral realities must be executed in accordance with a support contract ID number of projects have summed legislation and KEOP for grants! Design requirements for: the acquisition of new licenses - unchanged technical content - is under way. Bidder offer you need to do that based on the supplied design documentation carefully to examine the contents of all standards legislation in force in Hungary for this work, which may affect the execution. Whereas, pursuant to the permit and any obligations to be imposed in the licensing process will be determined on the basis of this legal background, when granting approval, making reference to the provisions under licenses permits additional work, additional work are not eligible. The authorization levels of project documentation and cost of obtaining licenses is not eligible. In either case, the Contractor is also responsible plan based on the licensee (s) and valid license (s) preparing a complete plan to export documentation. The technical delivery conditions for acceptance as well as the preparation of background transfer and activation of the Implementation Plan documentation required documentation (s).

No. 2. Contract amendment - "Improving the safety of drinking water supplies the city of Miskolc - Export plan preparation and construction works

Miskolc Megyei Jogú Város Önkormányzata | Published June 17, 2015
Winner
MI-DU-HI Közös Ajánlattevő
cpvs
45252126, 45210000, 45233123, 71320000

"Because of the city of Miskolc improve the safety of drinking water supplies by building modern water treatment technology, Miskolctapolca serious threat to water resources" of a contract subject to export project plan preparation and construction works in accordance with the requirements of FIDIC Yellow Book - EEOP-1.3.0 / B / 2F / 09-2010- 0001 The main content of the parameters of the project: The planned annual quota of recoverable 9,180,000 m³ / year. Major quantities of the following, which are defined and indicative data on the basis of the indicative plan are considered. Existing facilities: Building Manager - Transformation - 291 sqm. Social part of the building - demolished - 96 sqm. Electric switch Square - demolished - 250 sqm. Warehouse - demolished - 70 sqm. Wells - Pump Replacement - 48,000 m³ / d. Transformer - is to be moved - 2x1,6 MVA. Aggregator - to be moved - 14 kW. Planned facilities: Property Manager - 914 + 146 m². Storage pool - 2x500 m³. Storage Pool architecture - 36 sqm. Underground tanks - 1x35 m³; 1x20 m³; 1x20 m³. Sewage pumping station - 16 m³ / h. Swimming yard lines. Landscaping. Landscaping. Power. Measurement and process control. Quantitative and qualitative requirements for treated water: The treated water hardness does not vary during treatment. The tasks carried out by the contractor, local specifics stemming from the Project taking into account the geographical and sectoral realities must be executed in accordance with a support contract ID number of projects have summed legislation and EEOP for grants! Design requirements for: the acquisition of new licenses - unchanged technical content - is in progress. Bidder offer you need to do that, based on the supplied design documentation must carefully examine all the content standards legislation in force in Hungary for this work, which may affect the execution. Whereas, pursuant to the permit and any obligations to be imposed in the licensing process will be determined on the basis of this legal background, when granting approval, making reference to the provisions under a grant licenses for additional work, additional work are not eligible. The authorization levels of project documentation and cost of obtaining licenses is not eligible. In either case, the Contractor is also responsible plan based on the licensee (s) and valid license (s) preparing a complete plan to export documentation. The technical delivery conditions for reception and transmission of background preparation as well as the activation of the Implementation Plan documentation required documentation (s).
  • 1