Call +44 800 9755 164

Public tenders for architect, architecture in Eger Hungary

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Results of "delivery contract furniture procurement section 3" adopted procedure

Egri Főegyházmegye | Published June 10, 2015
Winner
DuoLine Kereskedőház és Bútorgyártó Bt.;Kiss-Iskolabútor Kft.;Kiss-Iskolabútor Kft.
cpvs
39160000

Supply contract furniture purchase 3 Part 1: flat, 54 types of products, a total of 431 items Part 2: furniture, 8 types of products, a total of 120 items Part 3: furniture, 29 types of products, a total of 884 items of the contractor's duties the following are all part of: - the scene of the delivery of the products defined technical specifications - in fuvareszközről unloading at the delivery site positioning - Unpack the means - the means assembling their own work tools - to the appropriate location positioning devices - devices architect in line with plan installation and commissioning - Hungarian-language instruction manual and technical documents; - removal of packaging - providing quality certificates - warranty and guarantee, as defined in the contract. according to the technical specifications and the draft contract be maintained.

TEE ÉMOP-4.2.1 / B No. 12-2013-0001 "Infrastructure development Egerben- Cecey Eve nursery Nursery design"

Eger Megyei Jogú Város Önkormányzata | Published February 18, 2015
cpvs
45000000, 45200000, 45210000, 43325000, 45112723

No. ÉMOP-4.2.1 / B-12-2013-0001 "Infrastructure development Egerben- Cecey Eve nursery Nursery design" the volume of purchases: nursery and part of a complete renovation and transformation of the institution épületburkának as follows: • Thermal insulation of facades and roof • nursery yard renewal, replacement fencing and renovation • patio cover, restoration of housing • some internal doors and cupboards exchange • Establishment of Sofala in group rooms • the entrance, 1 toilet and 1 group room accessibility of • complete replacement of lighting equipment group rooms housed • entrances with access control system • Installing building cooking kitchen ventilation system • Discipline playground renovation work areas: • architecture • building engineering structures • • • electrical engineering equipment, packing, utilities • gardening • accessibility of detailed technical description of the documentation.

Information on "a contract to St. Elizabeth's Catholic Primary School in partial renovation and partial accessibility of" Law amending the Treaty

Egri Főegyházmegye | Published February 11, 2015
Winner
FK-Raszter Építő Zrt.
cpvs
45453100, 45300000, 71221000, 45330000, 45232440, 45331000

A contract to St. Elizabeth's Catholic Primary School in partial renovation and partial accessibility of the subject "The Muddy Creek, Bartók Béla u. No. 2. St. under Elizabeth Catholic Primary School in partial renovation and partial removal of obstacles in connection with the performance of the following tasks: ,, A "(other than tornatermen) boiler related building (classroom wing) Architecture Engineering accessibility HVAC Jobs New internal heating system, creating a new internal heating system (other than tornatermen) Without boiler Boiler internal gas supply mounting external hydrant repairs Electricity Electricity ,, construction of the '' building fire alarm system ,, building B "(gym wing) Architecture Engineering Gymnasium locker room inside for water and sewage installation Gymnasium dressing heating installation Gymnasium dressing room ventilation installation Gymnasium central heating Installation Gymnasium air heating-ventilation installation of heat and smoke extraction fire air supply installation works of external gas supply pipeline construction Solar Kitchen air supply - ventilation ,, B '' exterior drainage Restaurant balanced ventilation Kitchen heat recovery air heating ,, B 'breakdown' building existing boiler house wiring and equipment Electricity Electricity related ,, B '' building electrical Solar cells Yard Architectural enhancements Park, covers, ramps, Member neck reconstruction artificial grass courts Runway and related tasks in accordance with the documentation and the export plan and the budget unpriced defined.

Results of "a contract to St. Elizabeth's Catholic Primary School in partial renovation and partial accessibility of matter" adopted procedure

Egri Főegyházmegye | Published December 1, 2014
Winner
FK-Raszter Építő Zrt.
cpvs
45453100, 45300000, 71221000, 45330000, 45232440, 45331000

A contract to St. Elizabeth's Catholic Primary School in partial renovation and partial accessibility of the subject "The Muddy Creek, Bartók Béla u. No. 2. St. under Elizabeth Catholic Primary School in partial renovation and partial removal of obstacles in connection with the performance of the following tasks: ,, A "(other than tornatermen) boiler related building (classroom wing) Architecture Engineering accessibility HVAC Jobs New internal heating system, creating a new internal heating system (other than tornatermen) Without boiler Boiler internal gas supply mounting external hydrant repairs Electricity Electricity ,, construction of the '' building fire alarm system ,, building B "(gym wing) Architecture Engineering Gymnasium locker room inside for water and sewage installation Gymnasium dressing heating installation Gymnasium dressing room ventilation installation Gymnasium central heating Installation Gymnasium air heating-ventilation installation of heat and smoke extraction fire air supply installation works of external gas supply pipeline construction Solar Kitchen air supply - ventilation ,, B '' exterior drainage Restaurant balanced ventilation Kitchen heat recovery air heating ,, B 'breakdown' building existing boiler house wiring and equipment Electricity Electricity related ,, B '' building electrical Solar cells Yard Architectural enhancements Park, covers, ramps, Member neck reconstruction artificial grass courts Runway and related tasks in accordance with the documentation and the export plan and the budget unpriced defined.

Building within the framework of a contract under the 6th Street Matthias Gerl common social block design

Eger Megyei Jogú Város Önkormányzata | Published November 5, 2015
Winner
J.P. 98 Fűtéstechnika Kft.
cpvs
45000000, 45262600, 45315100, 45350000

Within the framework of a contract for the building at 6th Street Matthias Gerl common social block design based on the completed design plans and cost estimates Contracting hung construction work in two phases: Phase I: Common social development of block II. schedule: Develop Dual Sex dressing group The subject of Phase I of the implementation of public procurement procedures. Of course, the budget must be submitted in aggregate principal priced according to the architect's budget. Phase I: Common social development of Block Demolition work: In addition to the interior and front doors, windows, ceilings and necessary for the creation of a new entrance grilles and slots breakdowns. In connection with the construction work will be carried out the following work: From over a toilet room in which toilet stall 2 and 3 pissoir is installed. The ceramic floor insulation against factory-made water under cover so-called user. "Liquid film" insulating material and the necessary hajlaterősítő tape. Error plaster on the facade and the facade will be corrected to paint. Contracting states that work is not subject to the procurement process building permit. A detailed technical description contained in the Annexes of the documentation. Recorded on the basis of § 7 of 23.) Govt. Are reserved, a margin that does not want to end up the subject of the proceedings.

1 no. authors. mode. No. ÉMOP-4.2.1 / B-12-2013-0001 "infrastructural development of crèches Eve Egerben- Cecey Nursery execution" of a contract

Eger Megyei Jogú Város Önkormányzata | Published January 20, 2016
Winner
TETŐ CENTRUM ’95 Kft.
cpvs
45000000, 45200000, 45210000, 43325000, 45112723

ÉMOP-4.2.1 / B-12-2013-0001 number of "infrastructural development of crèches Eve Egerben- Cecey Nursery execution"
The amount of purchases:
Nursery and part of a complete renovation and transformation of the institution épületburkának as follows:
• thermal insulation of facades and roofs
• nursery garden renovation, refurbishment and replacement of fences
• Terrace covering, renovation of housing
• some internal doors and cupboards exchange
• The establishment of a group of Sofala rooms
• the entrance, 1 toilet and 1 group room accessibility of
• Complete replacement of the lighting devices placed in group rooms
• Installing entrances with access control system
• Building cooking kitchen ventilation system
• playground refurbishment
Particular areas of work:
architecture
• Structures
• Building Technology
• electrical equipment
• civil engineering, packing, utilities
• gardening
• accessibility
A detailed description of the technical documentation.

tájékozatató on contract modification

Eszterházy Károly Főiskola | Published November 27, 2015
Winner
ADEPTUS-H Zrt.
cpvs
45000000

"Construction work performing school property to be developed in the Esterhazy Karoly College Faculty of Comenius" as follows: Architecture: The load-bearing structures are in good condition, the other structures are worn out and need to be replaced. The three-star Instruments for measuring the development will take place at two levels, in - in order to create the desired room structure - all másodlados and complementary to the building structure to be demolished, except for the partitions, they can only partially, the sanitary place. The first and second floors of the actual teaching hotel, the rooms themselves to the desired comfort level design. The development of additional levels will be more tourism, external traffic and to provide intensive courses lodgings collegiate level. Conversion of areas affected Ground Floor space 431.26 m2 floor area 348.32 m2 Floor space 348.32 m2 floor area of ​​5.88 m2 Floor Attic floor area 124.22 m2 1346.51 m2 Total area converted Engineering: An exception to the ground floor boiler room that heat energy It supplies the other buildings in the area of ​​the complex. Electrical works:

Information on the outcome of the proceedings "Networking, registration and application support system construction" adopted procedure

Eszterházy Károly Főiskola | Published October 5, 2015
Winner
UNINET Stúdió Kft.
cpvs
72211000, 72212210, 72212222

A contract within the framework of "Networking, Building filing applications and support systems' technical specifications annexed to the documentation, in accordance. - A web-based application supporting IT system development - system design to develop a piece - a piece of software user information content of the system The system must be based on a client-server architecture. In contrast to the software are expected to be used via Internet browser, and not request additional installation of special software. The development of PHP, MySQL database to be implemented. The modular design of the structure beyond the application, follow the MVC design pattern, which also is necessary because of the simple ease of modification and improvement. Within the application of database queries and connect to implement must be conducted so as to be able addition to the MySQL database to another database managers function, ie the connection data and the database manager by entering another database managers (PostgreSQL MSSQL, Oracle) can get together work with the system. We wish you set for 6-month period after the transfer of support system. The program provides the customer access to its server. Tasks include: - regular professional reconciliation with the customer. - The creation of a piece of system design - Design System based on the development of Web-based software components - Software Testing - The development of a piece of software user manual - Profit Transfer Products

For publicity on the outcome, "school property to be developed to carry out the works Execution of the Esterhazy Karoly College Faculty of Comenius"

Eszterházy Károly Főiskola | Published September 23, 2015
Winner
ADEPTUS-H Zrt.
cpvs
45000000

"Construction work performing school property to be developed in the Esterhazy Karoly College Faculty of Comenius" as follows: Architecture: The load-bearing structures are in good condition, the other structures are worn out and need to be replaced. The three-star Instruments for measuring the development will take place at two levels, in - in order to create the desired room structure - all másodlados and complementary to the building structure to be demolished, except for the partitions, they can only partially, the sanitary place. The first and second floors of the actual teaching hotel, the rooms themselves to the desired comfort level design. The development of additional levels will be more tourism, external traffic and to provide intensive courses lodgings collegiate level. Conversion of areas affected Ground Floor space 431.26 m2 floor area 348.32 m2 Floor space 348.32 m2 floor area of ​​5.88 m2 Floor Attic floor area 124.22 m2 1346.51 m2 Total area converted Engineering: An exception to the ground floor boiler room that heat energy It supplies the other buildings in the area of ​​the complex. Electrical works:

Information on the contract No. I. amendment - "Dobo Square - Eger stream - Downtown térsor function expansion Rehabilitation (ÉMOP-3.1.2 / C 09-2f-2011-0001.) - Development of City Hall"

Eger Megyei Jogú Város Önkormányzata | Published November 7, 2014
Winner
Imola Konstrukt Kft., Imola Építő Kft., EURO CAMPUS Kft., mint közös ajánlattevők
cpvs
45210000, 45212100, 45237000

Development of City Hall Architecture courtyard facade renovation of the one-layer tree structure, a square mesh windows looking out to be broken, instead of the inner courtyard, almost all of which dominate gerébtokos looking, modern, insulated hole closing time changed. The main entrance of the building portion west wing on the ground floor - the doorway terjedő- will be right section of the window function is configured (door and window location), but the appearance is identical to renovate gerébtokos nyílászárókéval. New multi-functional space: a multi-purpose building will expand the Town Hall, which is the lobby and the courtyard of the building extensions as a meeting room, conference hall, major retail interest area behind the main staircase is a direct result of the land and the installation of endowments created simple-looking-glass building, which is trying to integrate into the Town Hall épületegyüttesébe in such a way that the glass walls of the existing A plugin is closed communicatively connected to the main crowd in addition to the multi-functional space is housed in a Gym and a normal operation at WC, the flat-roofed building on extensive green roof to get that nice visuals for the upper
  • 1