This consultation negotiated formalized procedure (under the 2005 Ordinance) follows an initial consultation went unanswered. A minimum of 5 candidates will be selected for the submission of a tender. The consultation is open to architects presenting only if they have internally all the required skills and multidisciplinary teams justifying the following minimum qualifications: Architect (agent), BET structures, fluids BET specialized in thermal studies RT 2012. These skills are mandatory and must be clearly expressed in the application under penalty of exclusion. The architect attorney will eventually outsource the associated skills but should present them as such to surrender his candidacy. The work will be launched in separate trades.
Phase "Application". This consultation negotiated formalized procedure follows an initial consultation made without result. A minimum of 5 candidates will be selected for the submission of a tender. The consultation is open to architects presenting only if they have in-house all the skills required and multidisciplinary teams justifying the following minimum qualifications: Architect (agent), BET structures, specialized in thermal fluids BET RT 2012. These studies are skills mandatory and must be clearly expressed in the application under penalty of exclusion. The architect attorney will eventually outsource the associated skills but should present them as such to surrender his candidacy. Estimated Start of studies: June 2016. Deadline of studies: 14 months. PC Deposit: December 2016. Period of works: 14 months. predictable execution of works: September 2017. Work will be launched in separate trades.
Team consisting of an architect (consortium leader), desk studies of structures, desk MEP engineering specialized in thermal studies RT 2012 and dynamic simulations for the proposed creation of a youth accommodation destination apprentices CFAI (apprentice Training Centre Industry), CESI (Centre for Industrial Higher Studies) and the CMA (chamber of trades and crafts) in conjunction with the creation of a common campus between these partners and implemented within the site. The building consists of 120 studios (T1bis, T2 and ancillary rooms). The level of performance will RT 2012-20%. Estimated Start of studies: January 2016; PC filing late Q1 2016.
A Phase On Call Application
the tasks are defined as follows:
- Basic mission of project management within the meaning of the Act of 07.12.1985 Mop
- Additional Mission ½ Exe
- Optional Range: Opc complementary mission.
Tranche ferme: mission de base étendue à la mission 1/2 EXE.