Call +44 800 9755 164

Public tenders for architect, architecture in...

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!
ArchitectureFrancevaulnaveys-le-haut

Implementation and monitoring of technical, architectural and environmental program for the construction of a university building said "first stone val d'Europe" on the site of Serris (

Universite paris est marne-la-vallee | Published November 8, 2016  -  Deadline December 5, 2016

Architectural and related services

Smitom du Centre Ouest Seine et Marnais | Published November 11, 2016  -  Deadline December 7, 2016

Recast - conception - realization of the scenography of an educational tour circuit on sorting, prevention and treatment of household waste, integrated with energy plant and sorting center worth-the-pénil (77) creation - conception - realization of the scenography of an educational tour circuit réau on the site (77), comprising a composting platform of green waste, transfer dock and a recycling center.

Circuit visit Vaux-Pénil: overhaul of the scenography of the current educational visits Course Unit Value Energy (Uve) and sorting center SMITOM-FLIES of Vaux-le-Pénil (77)

Reau tour circuit: design and realization of the scenography of a learning path for SMITOM-FLIES site based in Reau (77) composed of a green waste composting platform, a transfer dock of a recycling center and macrophyte ponds.

Architectural, construction, engineering and inspection services

EHPAD Mer et Pins | Published November 9, 2016  -  Deadline December 16, 2016
Construction of a new building housing a nursing home with 82 beds Alzheimer units. The new building will not host for preparation kitchen or laundry room, these functions being centralized at the level of the institution.

Architectural, construction, engineering and inspection services

Tunnel Euralpin Lyon Turin SAS | Published October 12, 2016  -  Deadline December 2, 2016
Lot 3 concerns the excavation of about 2 to 2.5 km of underground structures to the axis of the tubes, ancillary works such as rooms, niches, twigs, ... as well as associated external works for the management of excavated materials, transportation, and logistics sites.
  • 1