Public tenders for architect, architecture in Urrugne France

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural and related services

Agglomération Sud Pays Basque | Published February 10, 2015
cpvs
71200000

Services d'architecture

Architectural, construction, engineering and inspection services

Agglomération Sud Pays Basque | Published October 5, 2016
Winner
Espelia SAS
cpvs
71000000

foreshadowing study for the implementation of the urban community Basque Country.

Architectural, construction, engineering and inspection services

Agglomération Sud Pays Basque | Published July 6, 2016  -  Deadline August 1, 2016
cpvs

Cette consultation a pour but de mener une étude de préfiguration pour la mise en oeuvre de la Communauté d'agglomération Pays Basque.

Architectural and related services

Agglomération Sud Pays Basque | Published December 2, 2015  -  Deadline January 5, 2016
cpvs
71200000

a) Development of a pilot production in a warehouse. Reflection based on the constraints of deliveries / shipments, the connection to the office building, the existing structural elements including DRC: nave, wood workshop, metal workshop, assembly box, 3d printing, ...: 820 square meters floor including: material library, Training and Production space: 430 square meters; b) cutting industrial warehouses cells. Total floor area 4350 square meters: Removal of all existing networks. Length brought facades connection works to networks, sanitary walls ... Creating fire and acoustic treatment. creating openings in front, facades closures after demolition, to painting, cladding, ...; c) Demolition / asbestos removal of part of the warehouses. Floor area 450 square meters; d) Landscaping, access, stream delivery, parking, green spaces, fencing, waste storage ... This market design and implementation involves a mission of project management / reuse or rehabilitation of building work - studies diagnostics (Diag) inform the agglomeration on the condition of buildings, existing structures and feasibility operation - draft studies (aps apd), including records and consultations for obtaining the PCs and other authorizations - Project studies (Pro ), - support given to the chipboard. For awarding works contracts (Act), - compliance review of the project design studies. Made by companies and their visa (Visa), - management of the execution of works contracts (DET) - scheduling, management and coordination of the construction site (OPC).

Architectural and related services

Agglomération Sud Pays Basque | Published February 5, 2015  -  Deadline March 11, 2015
cpvs
71200000

The settlement will be assisted in the early stages of this operation by: - ​​programmiste, responsible for defining the foreshadowing that will be made of the book, by drawing the state needs and defining the plan of life who will preside facilities - a wizard with project management for high environmental quality, in charge of the implementation of the environmental program of the Operation Management System and evaluate and monitor environmental quality and energy efficiency project throughout the design, implementation and during the first two years of operation. In this basic context, this contract covers project management mission consists of a: - basic mission visas - given the above, the candidate must secure during all phases of design and realization that all elements have been combined to ensure the HQE certification of the operation. It will therefore guarantee the environmental quality of this operation which will be defined by its ability to meet: - control of the operation impacts on its immediate environment - creating comfortable and healthy indoor environments for users, - preservation of natural resources by optimizing their use, - HQE as being a project management approach, it requires above all a strengthened dialogue between the partners involved in the project (mo, moe, be, amo, businesses, csps,. ..) in all phases of design and construction with the aim of meeting the targets to be defined in common.
Jun 16
Sep 29

MOE-PISTE-PIETONS-CYCLES | Project management contract for the design and follow-up of a pedestrian-cycling path between Urrugne borough and the Camiéta district. The purpose of this restricted consultation is to retain a master's team, Works within the framework of the design and follow-up of a pedestrian / cycle path between Bourg d'Urrugne and the Camieta neighborhood. This consultation follows an initial study commissioned by EGIS to design a pedestrian / cycle pathway master plan, which defined the itineraries (5 in all) for connecting the different districts of the commune in links sweet. The study is currently underway (AVP level), except for & lt; & lt; Route 1 & gt; & gt; Whose rendering, PRO level, has been anticipated. This & lt; & lt; Itinerary 1 & gt; in the master plan for the organization of pedestrian paths / cycles in the municipality, is divided into 7 sections characterized by specific problems. This study resulted in the start of implementation (section 1) under municipal control, work carried out by the companies COLAS and EUROVIA. On the basis of the design work carried out by the EGIS Design Office, which will have to be partially called into question due to significant changes in land possibilities, the project management team is asked to: 1. Portions 2/3 and 4 of route 1, (REPEAT and ADAPTATION of the design elements of the EGIS design office): - Diagnosis (DIA) - Preliminary design (AVP) - Project (PRO) 2/3/4/5/6 and 7 of route 1, (ON THE BASIS OF EGIS design elements - PRO level): - Knowledge / adaptation of the PRO and preparation of elements to pass In the ACT phase: - Assistance for the award of the Work Contracts (ACT): - Direction for the execution of the Works Contract (DET): - Assistance to the Owner during the Receiving Operations (AOR): Desired team: a. Study bureau VRD (the representative of the consortium) b. Landscape architect: c. Expert surveyor:

Commune d'URRUGNE | Published June 16, 2017  -  Deadline September 29, 2017
cpvs
71000000

  • 1