Call +44 800 9755 164

Public tenders for architect, architecture in Strasbourg...

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural, construction, engineering and inspection services

Département du Bas-Rhin | Published February 15, 2017  -  Deadline March 13, 2017
cpvs
71000000

This transaction involves the building renovation works decommissioned F (about 2500 m 2 Su) of former Foch college in Haguenau to house the services territorially Department, currently spread over several sites.

The cost of works is estimated at 3.3 million euros before tax.

project management basic mission MOP law: basic mission with complementary missions dia + CSSI.

In addition to the heart of the intervention that is the interior refurbishment of the building to house the headquarters of the northern delegation of the Department, the operation will also include the work required to upgrade the technical facilities, making safe and compliance of the building (fire safety and handicapped accessibility) as well as up to standard compared to thermal and acoustic regulations.

project management basic mission MOP law: basic mission with complementary missions dia + CSSI.

Moe representative group with architect.

Required Skills: architecture, construction economy, structural engineering, fluid engineering, thermal and acoustic.

Architectural services for buildings

SERS | Published February 3, 2017  -  Deadline March 2, 2017
cpvs
71221000

Reconvertion the manufacture of tobacco Strasbourg

Creation Of A hostel (tourist accommodation for young people)

270 BEDS - mastery walk lumber

The market consists of a firm phase and an optional slice broken down as follows:

1. Firm phase:

Dia, which will help to identify the feasibility of the program within the given volume, and the budget.

2. Optional slice: APS - oDA - pro / Dce - aCT - Visa / partial Exe (*) - Retail - aOR subject to the following additional tasks:

- Coordination Ssi

- Regulatory Safety

- Task scheduling - Control - coordination

(*) It is stated that the partial assignment includes EXE quantity surveying stage DCE for entrepreneurs to engage without ambiguity, the details of execution of architectural prizes and synthesis of all items (Syn) and VISA exe on plans prepared by contractors.

The market consists of a firm phase and an optional slice broken down as follows:

1. Firm phase:

Dia, which will help to identify the feasibility of the program within the given volume, and the budget.

2. Optional slice: APS - oDA - pro / Dce - aCT - Visa / partial Exe (*) - Retail - aOR subject to the following additional tasks:

- Coordination Ssi

- Regulatory signage

- Task scheduling - Control - coordination

(*) It is stated that the partial assignment includes EXE quantity surveying stage DCE for entrepreneurs to engage without ambiguity, the details of execution of architectural prizes and synthesis of all items (Syn) and VISA exe on plans prepared by contractors.

Architectural, engineering and planning services

DRAC ACAL | Published February 17, 2017  -  Deadline March 13, 2017
cpvs
71240000

This contract is for the progressive implementation and finalization of the study on the backup plan and development (PSMV) of outstanding heritage sector (Spr) in Strasbourg.

The mission of responsible study is to formalize, in connection with all the services of the state (Prefecture of the Greater East region, East Grand DRAC) and the Strasbourg Eurometropolis, an urban strategy to preserve and development of the remarkable heritage area Strasbourg-based framework documents and integrating the issues and objectives targeted by the project.

urban and heritage study is not to start from the beginning: it is finalizing the field study on the rest of the review-extension area North of Great Island and the Neustadt (or subsectors 7-10). After these field tests, the benefit will be, firstly, to finalize the presentation of the report, the written settlement and the polychrome map, and secondly, to support the contracting authority until approval PSMV the final.

Architectural, construction, engineering and inspection services

Habitation Moderne | Published February 1, 2017  -  Deadline February 27, 2017
cpvs
71000000

Modern housing is planning the realization of a housing complex in Strasbourg Robertsau.

To this end, a framework agreement will be signed with a prime contractor to entrust all project management tasks relating to these operations, in particular:

- A feasibility study (spatial organization of the site as required by the building owner, the study of volumes and interfaces with the public space ...);

- Possibly a core mission Law "MOP" with visa or performance studies for each lot;

- Possibly an OPC mission

- Possibly any other tasks useful to the project.

Eurométropole The Strasbourg wants to make this program a copy operation in the field of social housing. A collaborative work will be required in the form of workshops conducted with the participation of a sociologist and Eurometropole Strasbourg (it is not excluded that other external actors are solicited).

The required thermal performance will be at minimum RT 2012 to 15%. A certification to minimum NF Habitat will also be sought.

Architectural, construction, engineering and inspection services

Habitation Moderne | Published February 1, 2017  -  Deadline February 27, 2017
cpvs
71000000

Modern Residential considering conducting a property lying within the ZAC Bohrie of Rives in Ostwald, block D1. The tax base should allow the production of about 80 homes. To meet the need of social diversity, it might be possible to achieve within the same block, housing for the assisted rental and other social accession. This program is not stopped to this day.

To this end, a framework agreement will be signed with a prime contractor to entrust all project management tasks associated with this operation, namely:

- A feasibility study in connection with the planner of the developer (spatial organization of the site as required by the building owner, the study of volumes and interfaces with the public space ...)

- Possibly a core mission Law "MOP" with visa or performance studies,

- Possibly an OPC mission

- Possibly any other tasks useful to the project.

The required thermal performance will be minimally RT 2012 to 15%. A minimum NF certification Habitat will also be sought.

  • 1