Call +44 800 9755 164

Public tenders for architect, architecture in Marseille-02...

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!
ArchitectureFrancemarseille-02

Architectural and related services

Université d'Aix-Marseille | Published April 11, 2017  -  Deadline May 10, 2017
cpvs
71200000

The contract is for the project management services related to the partial rehabilitation operation of the IAE, Institute of Administration of Enterprises in Aix-en-Provence. Work will take place on the site of the IAE, in way of the keel Puyricard, 13540 Aix en Provence. The building concerned by the operation is the main building. This building houses of educational, research and administrative offices.

The contract is for the implementation of control benefits related to the partial rehabilitation operation of the IAE, Institute of Administration of companies Aix-en-Provence. Work will take place on the site of the IAE, in way of the keel Puyricard, 13540 Aix-en-Provence The building concerned by the operation is the main building. This building houses of educational, research and administrative offices. This is a mission under the basic mission MOP law. The contract covers one (1) firm phase (TF) and two (2) optional slices (TB) as specified in section 1 of the SCC. The site visit is not mandatory during this Phase 1 of the procedure.

Architectural and related services

Sud Habitat | Published April 15, 2017  -  Deadline May 15, 2017
cpvs
71200000

Embodiment 74 of 4 new housing real estate programs 74 and parking surface Pertuis (83460):

existing building demolition and / or rehabilitation of some housing

Site 1: Path of Espignon: Construction of 21 individual housing

Site 2: avenue de Verdun: Realization of 12 individual housing

Site 3: Ilot Trouillet-Verdun: Realization of 12 collective housing in R 3

Site 4: St. Paul Arena: Construction of 29 individual housing

Total land take on the 4 sites: 9884 square meters - Estimated total floor area: 5,200 m2 - Estimated total living area: 4 700 m2. The 4 programs will be carried out concurrently.

The expectations of the client: controlling the cost of the operation - integration into the site and architectural quality - quality of use of the external housing and spaces - control of energy consumption and process BDM

More details in the CSLA.

Mission complete project management governed by Law No. 85704 of 12.7.1985 as amended by Act No. 88-1090 of 1.12.1988 and the implementing legislation (Decree No. 93-1268 of 29.11.1993, the order of 21.12.1993). Project management mission will include: 1) sketches Studies (QSE) - 2) pre-project studies (APS ODA) - 3) Project studies (Pro) - 4) Assistance provided to the master of book for the award of contracts or work (ACT) - 5) Visa implementing studies by companies (Visa) - 6) the performance of the Directorate or works contracts (DET) - 7) Support made to the client during acceptance operations and during the completion guarantee period (AOR).

complementary mission firm phase: Support BDM - complementary mission conditional phase: Scheduling, Coordination, Control (OPC).

Architectural, construction, engineering and inspection services

DISP PACA Corse DPE | Published April 12, 2017  -  Deadline May 16, 2017
cpvs
71000000, 71240000, 71300000

mastery of mission work for the redevelopment and extension operation MESS and canteen area, kitchen and laundry room of the penitentiary center of Aix-Luynes.

Mission control overall work - including both the "design" phases "Monitoring Jobs" with OPC complementary missions (Diag missions, AVP, PRO, ACT....) (Visa, DET, AOR..) SSI, Mob. And Sign. - for works whose estimated cost is set at 2.56 million euros before tax. And whose expected duration is 12 months.

For more information, see the other sections of this notice or the tender documents, available for free as provided by this notice.

This contract notice, which launches the application stage of a restricted consultation according to past competitive procedure with negotiation, relates to the award of a public contract for a work of mastery of mission for the redevelopment operation and extension of the MESS and canteen area, kitchen and laundry room of the penitentiary center of Aix-Luynes.

The current kitchen / laundry room / canteen, with a floor space of 800 m 2 some will be redevelopment and extension in a ground floor area of ​​200 m 2 . The current MESS, with a floor space of about 350 m 2 , Will be a redevelopment and extension in a ground floor area of ​​90 m 2 about.

This mission involves work whose estimated cost is 2.56 million euros before tax. And whose expected duration is 12 months.

See more information of this notice for more precision.

Architectural, construction, engineering and inspection services

Logirem | Published April 12, 2017  -  Deadline May 18, 2017
cpvs
71000000

project management contract for the demolition of a building and the construction of approximately 34 320 social housing path of Julian - 543 Avenue Maréchal Juin - Land UNEDIC - 83140 Six-Fours.

project management contract for the demolition of a building and the construction of about 34 social housing.

Architectural services for outdoor areas

La maison familiale de Provence | Published April 15, 2017  -  Deadline May 12, 2017
cpvs
71222000

In firm phase: Full Mission project management (design and implementation) and additional mission support BDM. In slice conditional OPC mission. Program located in arcs sur Argens - Laurons path on a land take of 9000 m 2 about.

- completion of 50 units in social home Psla and 50 surface parking spaces and 30 boxes adjoining the parking lot of the neighboring operation

- Predictive floor area: 3450 m 2 about - forward living area of ​​accommodation: 3200 m 2 .

The expectations of the client are: control of the operation budget - integration into the site and architectural quality - quality of use of accommodation - quality outdoor spaces - control the energy consumption of buildings in operation - mastery BDM approach.

Mission complete project management governed by Law o 85704 of 12.7.1985 as amended by Act No o 88-1090 of 1.12.1988 and the implementing legislation (Decree o 93-1268 of 29.11.1993, the Decree of 21.12.1993).

The project management mission will have the following mission elements:

1) sketches Studies (QSE).

2) preliminary project studies (APS APD)

3) Project studies (PRO).

4) Assistance provided to the Client for the award of contracts or work (ACT).

5) Visa implementing studies by companies (VISA).

6) the performance of the Directorate or works contracts (DET).

7) Assistance provided to the client during acceptance operations and during the completion guarantee period (AOR).

complementary missions:

- support BDM: firm phase,

- scheduling, coordination, control (OPC): conditional phase.

  • 1