Public tenders for architect, architecture in Fort-de-france France

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!
ArchitectureFrancefort-de-france

advisory mission in architecture and built heritage restoration

Ville de talmont saint hilaire | Published December 21, 2016  -  Deadline January 17, 2017
cpvs

advisory mission in architecture and built heritage restoration

Redesign of the computer system architecture of the Mairie de Saint-André-de-Cubzac

Mairie de saint andre de cubzac | Published November 7, 2017  -  Deadline November 30, 2017
cpvs

The purpose of this contract is to redesign the technical architecture of the Saint-André-de-Cubzac Mairie's computer system by implementing a centralized infrastructure. The new IS architecture will enable the reinforcement of collaborative and the logical and physical IS security. This market is not about the renewal of the workstation fleet.

Architectural services for outdoor areas

Commune de Pont-de-Claix | Published January 9, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>MG-AU (Michel Guthmann, architecture et urbanisme)</OFFICIALNAME></ORGANISATION><ADDRESS>10 bis rue des Bissons</ADDRESS><TOWN>Paris</TOWN><POSTAL_CODE>75020</POSTAL_CODE><E_MAILS><E_MAIL>agence@mg-au.fr</E_MAIL></E_MAILS><PHONE>+33 3147971153</PHONE><URL>http://www.mg-au.fr</URL></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
71222000

Landscape architect planner market.

Advisory architectural services

Centre hospitalier de Mont-de-Marsan | Published July 26, 2016  -  Deadline September 1, 2016
cpvs

Advisory architectural services

Advisory architectural services

Ville de Saint-Jean de-la-Ruelle | Published March 28, 2017  -  Deadline April 5, 2017
cpvs
71210000

The Salle des Fêtes (SDF) from Saint-Jean de la Ruelle, built in 1977, is a versatile space accommodating throughout the year in various shows, events and meetings. Despite the still high life of this equipment, it should be noted, after several decades of use, technical and functional obsolescence of it. Thus the municipal team wants to achieve by the end of his term (2014-2020) deep renovation of the hall, incorporating a modern show, either in the existing volumes or by extension.

In the other main objectives of the operation, we must mention the following:

- To better meet the expectations of the population, with the possibility of providing rooms for about 150 people for families;

- Optional: Open the equipment to the adjacent football fields, which should in the medium term be transformed into an urban park.

Architectural, engineering and planning services

SAS Bon Air | Published August 26, 2016  -  Deadline September 23, 2016
cpvs

As part of the development of eco-neighborhood "Bon Air", the overall project is the urban renewal district including demolition of existing buildings, housing construction and site development. The operation is integrated PNRU.

Architectural, engineering and planning services

Agence des 50 pas géométriques 972 | Published August 4, 2016  -  Deadline September 19, 2016
cpvs

architectural, engineering and planning

Architectural, engineering and planning services

Communauté d'agglomération du Centre de la Martinique | Published May 4, 2017  -  Deadline June 8, 2017
cpvs
71240000

The aim of this contract is to carry out a project management mission for the extension of the Z'abricots basin of the marina of the pond Z'abricots on the territory of the City of Fort-de-France (Martinique) .

Architectural, engineering and planning services

Communauté d'agglomération du Centre de la Martinique | Published May 23, 2017  -  Deadline June 19, 2017
cpvs
71240000

The aim of this contract is to carry out a project management mission for the extension of the Z'Abricots basin of the Port de Plaisance of Etang Z'Abricots in the territory of the City of Fort-de-France (Martinique) .

Architectural, construction, engineering and inspection services

Collectivite Territoriale Martinique | Published November 23, 2017
Winner
Safege (mandataire)/AEI SARL
cpvs
71000000

Project management relating to the swell protection of the national road 2 at Carbet. This involves the design and monitoring of the RN 2 to Carbet wave protection works between PR 26 + 539 and 27 + 252. The estimated budget allocated to the works is EUR 3,906,000 excluding VAT (November 2014 value).

The operation includes:

- the realization of a device intended for the protection of the carriageway of the RN 2 and,

- the integration of a sidewalk contiguous to the RN 2 and the subsequent safety devices,

- a breakdown of the market into 3 tranches is planned: - a firm tranche: EP,

- a conditional tranche n o 1: AVP and the specific services,

- a conditional tranche n o 2: PRO, ACT, VISA, DET, OPC, AOR.

Architectural, construction, engineering and inspection services

SA Aéroport de Martinique Aimé Cesaire | Published January 15, 2016  -  Deadline January 28, 2016
cpvs
71000000

This touch is to the following mission: technical assistance mission to the book Masters (atmo) associated with a mission of program definition, technical, contractual and financial, the project owner is the airport company samac- Martinique loved césaire. The design-build operations concern the extension of the passenger terminal for the creation of a regional terminal and the western extension of the building up to standard with 3 standards.

Architectural, construction, engineering and inspection services

Conseil régional de la Martinique | Published July 31, 2015  -  Deadline September 14, 2015
cpvs
71000000, 71311300, 71322000, 71320000

Project management for the protection against the swell of National Highway 2 in Carbet. This is to ensure the design and monitoring of protection works against the swell of National Highway 2 in Carbet between the PR 26 + 539 and 27 + 252. The share of projected budget allocated to the work is € 3,906,000 VAT (value in November 2014).

Architectural services for buildings

Commune de l'Île-d'Yeu | Published November 15, 2017  -  Deadline December 18, 2017
cpvs
71221000

Award procedure: restricted competition on "sketch plus" carried out pursuant to Articles 88, 89, 90 and 30.i.6 of Decree No o 2016-360 of 25.3.2016 and Article 8 of Ordinance No o 2015-899 of 23.7.2015.

Main characteristics: estimated cost of the works: EUR 2,616,000 (value November 2017) for an area of ​​1,090 m 2 .

Team composition / Required skills: participation reserved for a particular profession.

Composition of the team: architect, economist, BET Structure, BET Fluids and Acoustician.

Architectural, construction, engineering and inspection services

Mairie de Salon-de-Provence | Published October 1, 2015
Winner
SARL A+architecture Consulting, mandataire du groupement SARL A+architecture Consulting / BETEM PACAS SAS
cpvs
71000000

This support concerns the expansion work necessary for the central kitchen located 780 Avenue Street BIA Gandonne Ventadouïro in Salon-de-Provence. For this operation, the prime contractor of the project will be done by an architect of the City, assisted by the present holder of the contract, the distribution of tasks between each speaker is specified in the transaction program.

Architectural, construction, engineering and inspection services

Mairie de Salon-de-Provence | Published November 10, 2015
Winner
BET Battier
cpvs
71000000

This support concerns the compliance work of the Office of the kindergarten Jean Moulin Avenue of Brittany in Salon-de-Provence For this operation, the prime contractor of the project will be done by an architect of the City, assisted by the present holder of the contract, the distribution of tasks between each speaker is specified in the transaction program.

Architectural and related services

Ville de Fenouillet | Published July 7, 2015  -  Deadline August 5, 2015
cpvs
71200000

The project consists of building a school combining a kindergarten in 4 classes, elementary school 7 classrooms, a dining room and a leisure home associated with the school on land in the ZAC Piquepeyre. The useful area for the project is estimated at about 1 950 m2. The total amount of work is estimated at 3.5 million euros (HT). - Content of the mission: the holder will be given a basic mission within the meaning of Article 15-1 of the Decree of 29.11.1993, without execution study. This mission will be completed by the following: coordination of fire safety systems (ISS), dynamic thermal simulation (STD), the APS and APD stages. Optionally, the coordination task scheduling control (OPC) is requested. The Contractor shall further proceed with energy feasibility studies required by the legislation in force and all necessary steps for obtaining building permits and other administrative authorizations - Provisional commencement of the contract: fourth quarter 2015 - skills of the candidates: minimum capacity required: the project manager or project management team will necessarily have the skills in the following areas: architecture, engineering structure, HVAC / plumbing, electrical engineering, VRD, OPC and economy construction. The project management will be sensitive to the compactness of the teams as well as common candidates previous experience of team members. Applications which do not warrant all of these skills will be eliminated. Note: An entity may carry several skills. The teams taking part in the contest will be notified in September 2015, they have a period of approximately ten (10) weeks to submit their bids after the date of dispatch of competition file.

Survey services

Ville de Saint-Pierre | Published October 29, 2015  -  Deadline December 7, 2015
cpvs
79311000

Creating a valuation range of the Architecture and Heritage (AVAP) to the Municipality of Saint-Pierre.

Architectural and related services

Communauté d'agglomération Roissy Porte de France | Published May 7, 2015  -  Deadline June 11, 2015
cpvs
71200000, 45212222

Marché public de maîtrise d'oeuvre - construction d'un gymnase.

Records management

Centre du CEA de Cadarache | Published December 1, 2015
Winner
Euroscript
cpvs
79996100

In parallel to this entry in the GED, paper documents should be archived in the same document architecture. Besides the "catch of liabilities," the SRJH must ensure: - the original documents in document management and management of current archives, management of the database Electronic Document (GED). The service provider must implement a global organization of documentary type office (BDOC) or grouping the stakeholders in one place; demands SRJH must go through the local driver set up by the provider who will interface with the users; in this context, services, objects of these specifications include: -the document management of original paper documents and managing current records of documents SRJH, - management of the electronic database of SRJH (EDM), including the integration of documents in the database PR concerned, and documents issued / received by the SRJH, - management of the service by the documentary office BDOC, including tracking and tracing applications, providing dashboards for monitoring the provision and associated performance.

Project management on sketch for the demolition and reconstruction of the kindergarten to Rocks Condrieu

commune des roches de condrieu | Published March 25, 2015  -  Deadline May 13, 2015
cpvs
71230000

restricts competition on project management sketch for the demolition and reconstruction of the kindergarten to Roches de Condrieu. Realization of a nursery school to accommodate four kindergarten classes, teaching rooms combined (motor skills, nap room) and local teachers and staff. Also, for school groups (elementary and kindergarten) a dining area (2 services 65 meals) with reheat Office, an extracurricular room and library. Work will be performed in occupied site. Elementary school work during construction and use part of the playground, which is common to the two schools. A temporary school for "mother" will be implemented during the construction period. The floor area of ​​all is about 1112 square meters also including suitable sanitary facilities, equipment rooms ... The town playground at the school will be the order of 1100sqm and 100sqm yard (4 kindergarten and elementary classes 4) The total amount of work is estimated at 1.9 million eurosHt. This amount is given for guidance only and included the cost of the temporary school. The work of mastering tasks in particular will integrate the following aspects: - Architecture - TCE technical studies including demolition / removal of asbestos - construction economy - Kitchen Mission Basic Law MOP-type and complementary missions: - task scheduling, management and construction coordination. - Ssi - exe and Synthesis The work is considered in separate state body The notification of the prime contract work is scheduled for November 2015. Scheduled start of work: July 2016.