Project management on sketch with more anonymity for the construction of the center fire and rescue Bordeaux Rive Droite, fallback local Treatment Centre alert - departmental operational center of fire and rescue (CTA - CODIS) and computer equipment rooms.
General contractors for the construction of 10 social housing
Route de Maison Rouge in Fargues-Saint-Hilaire.
This consultation will lead to the signing of a project management contract (basic mission MOP Act) with optional OPC.
The award procedure is used: the competitive procedure with negotiation. It is subject to Articles 25-i.2 ° and 71 to 73 of no2016-360 Decree of 25 March 2016. The market will result in the award of a contract for project management. The market is broken down into a firm phase (AVP on the entire perimeter and network synthesis plan) and 5 optional phases, each corresponding to one area of the park and includes the following mission elements: pro, act, visa, det , aor, UCI and consultation.
Reflections on the Grand Parc Urban Development began in 2007 and was formalized in 2012 and 2014 by an urban and landscape composition guide map and conducting preliminary studies on public spaces including the park and provide: 1 detailed sketch map with 1/200, sections, details & Amp; an estimate of the projected cost of the work. The consultation aims to implement the guidelines defined in the sketches proposed by amo to the context. The area to be developed is about 9 hectares. The share of the financial envelope allocated to works by the MOA of 3200 000euro (s) (HT) .By application of Article 2 of the Law of 12/07/1985 called MOP law, program development and the determination of the provisional budget may continue for the preliminary studies. The consequences of the evolution of the program and the provisional budget are taken into account by amendment.
Mission diagnosis and sketch + basic mission MOP law.
Designation of a project management team consisting of an architect at minimum, a thermal BET, BET of a structure and an economist for the realization of rehabilitation in inhabited areas and densification by new construction.
This consultation provides a full mission with project supervision, allowed to develop, fund and complementary mission Surveyor mission:
- the design and construction of a subdivision, avenue de la Belle Etoile in Bouliac, Mission consistent with the MOP law;
- the implementation and monitoring of all administrative records for the project (including the license request file to arrange).
Mission complete project supervision with additional Surveyor missions, and OPC.
This contract is awarded by competitive procedure with negotiation. This is the first phase consisting of a call for applications.
Urban Community of Bordeaux, developer of the BIA and the City of Floirac and seeking a multidisciplinary creative team that will occur through two complementary and concurrent tasks:
- animation mission to test and foreshadow future uses of these places (on the basis of prior programming) through the development of micro developments in the study of public spaces phase;
- a mission of control of classical work for the definition of these public spaces involving multidisciplinary skills: a planner, a consulting firm VRD, forester, ecologist ..
Pool restructuring Galin - mastery of mission work The program includes, in addition to asbestos, the complete renovation of the closed-covered rehabilitation of the structure, modernization of technical equipment and upgraded to contemporary standards, including the accessibility to all public. The share of projected budget assigned to the work by the master of the book is set at 8.6 million euros HT, value December 2016. Pursuant to Article 2 of the Law of 07.12.1985 called MOP law, the program development and the determination of the provisional budget may continue for the preliminary studies. The consequences of the evolution of the program and the provisional budget are taken into account by amendment.
The market consists of the following basic elements: aps, apd, pro, act, visa, det, aor; and the following additional tasks: synth, UCI, diag (additional diagnostics phase design), HQE (dynamic thermal simulation, energy feasibility, justification of choice overall cost, assistance to commissioning (operating service file)) exploit (operating tracking analysis over 2 years), tds, qces. The contract period extends from the notification of the contract until the end of the last mission element. The complementary mission operation will start at startup and will last 2 years. A informative overall projected duration of the contract is 5 years and 4 months.
Project management for the acquisition and improvement of 5 units in a building - 23 rue des Bouviers - Bordeaux.
This consultation will lead to the signing of a project management contract (basic mission MOP Act) with optional OPC.
Master contractor for the renovation of the area hotel building and restaurant extension comprising a core mission with VISA, complementary missions: Environmental approach (Env), Mission iff (ss) i, the type of treatment (Tds), Assistance to the insertion of furniture (Mob) and realization of an information or communication board (Plq) and another mission: OPC.
Master contractor for the renovation of the area hotel building and restaurant extension comprising a core mission with VISA, complementary missions: Environmental approach (Env), Mission iff (ss) i, the type of treatment (Tds), Assistance to the insertion of furniture (Mob) and realization of an information or communication board (Plq) and other mission Opc.
The surface to be rehabilitated is approximately 4300 m2 and one to create about 300 m2.
This competition aims to choose the project management team for the realization of a project to build a dormitory for 208 seats on the site of the Ensavt in Champs-sur-Marne.
Prime contractor for the rehabilitation of the agency's website Pelleport decentralized primary health insurance fund of the Gironde.
The contract comprises the following tasks as defined by Law No 85-704 of 12/07/1985:
- Basic mission project management and performance studies for some work packages and compliance review to the project and visa for the other lots, synthetic studies being borne holder and coordination mission for fire safety system is deemed to be included in the basic mission.
Scheduling, management and coordination of the site. It includes, in addition, two complementary missions:
- Establishment of a decomposition part of the overall price indicating the estimated quantities on the basis of quantity take-offs, that for each work package,
- Coordination of external interventions.
This contract is a work management contract concerning the development of an urban boulevard called & Amp; Quot; technological Boulevard & Amp; Quot; (Towns of Hailsham and Merignac) between the tram terminus at the Hailsham line A to junction 12, parallel to the Bordeaux ring road to party, and integrating the realization of a transit high level of service. In view of the estimated budget of estimated transaction to 38.5 Million EUR (TTC), the Holder will be responsible for proposing a comprehensive development & Amp; Quot; facade to facade & Amp; Quot; for the entire route, and an operational schedule to optimize both the expected results and work costs for thinning traffic and TCHNS achieving future objectives in terms of commercial speed.