Call +44 800 9755 164

Public tenders for architect, architecture in Arpajon France

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural, construction, engineering and inspection services

CEA (Commissariat à l'énergie atomique et aux énergies alternatives) | Published March 31, 2017  -  Deadline May 4, 2017
cpvs
71000000

Assistance to the ECA, Project Manager, for monitoring the market "studies and works of civil engineering market, finishing work, handling means," relating to the extension and reconfiguration of buildings EPURE facility.

Benefits include: advisory and expertise, VISA missions, DET, AOR, follow-up mission of raising reserves and overall testing

And especially:

- compliance calculation notes, plans, execution doc

- compliance with the technical notes

- compliance of studies tests, convenience and control of materials produced

- monitoring of safety evidence

- compliance of electrical diagrams; executed projects and works, related to the contractual specifications

- manufacturing control, appros and assembly work on the site

- control of work for compliance breakpoints and info CEA

- tests on-site control and landings

- compliance doc studies related to the contractual specifications.

The set is about 150 local.

The support contract involves civil construction and finishing work, handling and special doors, including:

carcass work (earthworks, embankments, reinforced concrete and structural steel), the second work (metalwork, locksmithing, coatings, paint, resin, partitions, false floors, false ceilings, interior carpentry, plumbing, signage), lifting means , elevators, overhead cranes, VRD, doors, specific radiological doors, casing, sealing, cladding, drainage blanket and drainage under slab, the synthesis of TCE implementation studies (ventilation, electricity. ..) and the execution of studies of the work described above.

steelwork structures are also included in the market.

The volume of concrete to deconstruct the block is to reconfigure the order of a few hundred tonnes.

The contract includes:

a firm hand on VISA missions, DET, AOR blocks G and H

an optional hand on VISA missions, DET, AOR for the block E and monitoring levees reserves and overall testing.

Architectural, construction, engineering and inspection services

Mairie d'Arpajon | Published April 20, 2016  -  Deadline April 29, 2016
cpvs

Services d'architecture, services de construction, services d'ingénierie et services d'inspection

Architectural, engineering and planning services

Centre hospitalier général d'Arpajon | Published June 7, 2016  -  Deadline July 11, 2016
cpvs

architectural, engineering and planning

Architectural, construction, engineering and inspection services

Commissariat à l'énergie atomique et aux énergies alternatives | Published January 14, 2016  -  Deadline February 24, 2016
cpvs
71000000

Services d'architecture, services de construction, services d'ingénierie et services d'inspection

Architectural, construction, engineering and inspection services

Mairie d'Arpajon | Published March 19, 2016  -  Deadline April 22, 2016
cpvs
71000000

Redevelopment of public spaces from the heart of city of Arpajon.

Architectural, construction, engineering and inspection services

Commissariat à l'énergie atomique et aux énergies alternatives | Published December 22, 2015  -  Deadline February 24, 2016
cpvs
71000000

On the sites of the Directorate of Military Applications Commission in atomic energy and alternative energy as well as some military bases carry out tasks for the benefit of nuclear defense, renovation or creation of technical facilities are needed . These facilities may be: nuclear facilities subject to French regulations on nuclear safety and environmental protection or technical installations necessary for the operation thereof and subject therefore to high availability requirements.

Architectural, engineering and surveying services

Commissariat a l'énergie atomique et aux énergies alternatives | Published April 26, 2017
cpvs
71250000, 71510000

Design and realization of a network of topometry for the positioning and alignment of the radiographic chains Epure.

The benefits are broken down into:

- preliminary study and functional analysis of the need (firm),

- study and design (condition),

- realization, implementation and assistance to the operation of the topometry network for 3 blocks (each block corresponds to an optional additional service);

- realization, implementation and assistance to the operation of the topometry network for 2 additional blocks (additional services if necessary),

- provision of the necessary equipment (controlled expenditure),

- monitoring of the network of topometry in operation for 2 years (in controlled expenditure).

This opinion concerns Phase 2 of the Epure project. Phase 1, already completed, will serve as a basis for this service.

The work required is to carry out the design studies, the realization (including the physical protection of the reflector supports), the implementation and the follow-up of a network of topometry. The characteristics of this network must make it possible to establish the position of each constituent element of the X-ray chains in the experimental block by following requirements and taking into account the uncertainties contributed by each contributor (measurement means, referential transfers, etc.).

The second phase of the study will gather all the product design tasks and establish the specific positioning technical specifications associated with each interface product.

The third and final phase involves the realization, integration, use and monitoring of the topometric measuring device.

Architectural, engineering and surveying services

Commissariat à l'énergie atomique et aux énergies alternatives | Published May 3, 2017  -  Deadline June 2, 2017
cpvs
71250000, 71510000

Design and realization of a topometry network for the positioning and alignment of EPURE radiographic chains.

The benefits are broken down into:

- preliminary study and functional analysis of the need (firm),

- study and design (condition),

- realization, implementation and assistance to the operation of the topometry network for 3 blocks (each block corresponds to an optional additional service);

- realization, implementation and assistance to the operation of the topometry network for 2 additional blocks (additional services if necessary),

- provision of the necessary equipment (controlled expenditure),

- monitoring of the network of topometry in operation for 2 years (in controlled expenditure).

Phase 1, already completed, will serve as a basis for this service.

The object and sensors will be positioned in a specific block.

The Contractor will be responsible for the design of a product in interface with other products whose contacts will be located in France and in the United Kingdom:

- interface with various blocks for the second and third radiographic chains,

- interface between the machine halls and the experimental hall (reconfiguration phase of the experimental hall, machine set-up and operation),

- interface with X-ray machines from their implementation to commissioning,

- interface with the object to be radiographed,

- interface with detectors for radiographic measurement,

- interface with the halls of the existing installation,

- interface with the control system control.

It will provide the technical elements of interfaces.

The characteristics of this network must make it possible to establish the position of each constituent element of the X-ray chains in the experimental block by following requirements and taking into account the uncertainties contributed by each contributor (measurement means, referential transfers, etc.).

Radiographic axes will be materialized in the same Hall through transfer of reference (s) between the blocks (each block will have its own topometric network).

The future incumbent will assist the CEA during the operations of recipe of the process of positioning and alignment on the CEA site.

The second phase of the study will gather all the product design tasks and establish the specific positioning technical specifications associated with each interface product.

The third and final phase involves the realization, integration, use and monitoring of the topometric measuring device.

Architectural, engineering and planning services

Commissariat à l'énergie atomique et aux énergies alternatives | Published November 27, 2015
Winner
Anteagroup
cpvs
71240000

Project management for the conventional deconstruction of 2 areas (PR1 and PR2) in the northern zone of Moronvilliers CEA site with project optimization and cost control.

Architectural, construction, engineering and inspection services

CEA (Commissariat à l'énergie atomique et aux énergies alternatives) | Published October 13, 2015
Winner
G2 Metrics
cpvs
71000000

The facilities are Industrial control systems typically comprising: - Cable trays - Fluid Networks - Process Equipment The whole has a very high density of equipment. The size of the premises is variable (Ranging from small rooms to rooms of about one hundred meter length) Benefits include establishing these premises the following: - Control of 3D industrial plant by laser scanner FARO property CEA - topometric control - Post data processing - Management of a database scan readings - Precision Studies - Equipment Maintenance FARO property CEA during the market duration Some of the services may involve dust controlled premises ( ISO 7 and ISO 8) and / or classified radiological restricted area.

Architectural, construction, engineering and inspection services

Commissariat à l'énergie atomique et aux énergies alternatives | Published July 8, 2015
Winner
Euroscript Services
cpvs
71000000, 71240000, 79512000, 79996100

The technical scope of services is synthetically recalled below: - call center, data entry of maintenance operations and related operations, - recording and dissemination of Executed Work Records (DOE), - creating and updating plans - special services, including partial checks of the inventory, provision of asset information on demand, surveys and 2D and 3D modeling of parts and / or buildings. The contract will be concluded for a fixed term of 33 months. It may be extended for a maximum period of 22 months. Benefits could start in early 01.09.2015 and end no later than 04.30.2020.

Architectural, engineering and planning services

Commissariat à l'énergie atomique et aux énergies alternatives | Published February 4, 2015  -  Deadline March 6, 2015
cpvs
71240000, 45110000

The services to be provided consists of a project management of conventional deconstruction of two areas (PR1 and PR2) in the northern zone of the site CEA Moronvilliers (51) with project optimization and cost control. Expected result: zones deconstructed guarantees compliance with regulatory obligations to public health, safety and environmental-release of the final file containing in particular the management and traceability of all documentation and the record of executed works. The tasks to be performed are type MOP law suit for decommissioning tasks: basic tasks: - Diagnostic Mission (synthesis of basic data) - Mission APS - APD Mission - Mission PRO achievement of project studies - Mission ACT assistance to the award of works contracts. - EXE missions and VISA monitoring and control of implementing studies - DET Mission Directorate execution of works contracts - OPC mission - AOR mission. Complementary missions: - Operation management mission (including proficiency deadlines), - waste management mission - mission to assist in the formation of synthetic safety record. All services must take into account the regulation purchase of CEA. Firm performance: all above applied to the perimeter PR1 missions. Optional services: - Option 1: all the basic tasks and additional tasks applied to the perimeter PR2 until the end of ODA, - Option 2: all the basic tasks and additional tasks applied to the perimeter PR2 after ODA to the mission.

Architectural, construction, engineering and inspection services

Commissariat à l'énergie atomique et aux énergies alternatives | Published April 18, 2015
Winner
Euroscript services
cpvs
71000000, 71240000, 79512000

Réalisation de prestations de centre d'appels et de mise à jour d'informations (maintenance, DOE, plans, données patrimoniales, inventaires), par le « Bureau technique », pour le CEA/DAM du Ripault. Cette prestation, exécutée sur le site CEA/DAM du Ripault (site principal) à Monts (37) et éventuellement sur le Terrain Expérimental du Ruchard situé à 25 km du site principal, concerne les activités suivantes: - un centre d'appels et de saisie informatique des interventions de maintenance consistant à recueillir par téléphone les demandes de maintien en condition opérationnelle (à titre indicatif, 6 000 demandes/an), à éditer des ordres de travail planifiés de maintenance préventive (à titre indicatif, 28 000 OT/an) et à enregistrer des non-conformités ainsi que l'édition des rapports pré-formatés d'indicateurs de suivi de maintenance. - l'enregistrement et la diffusion des Dossiers d'Ouvrages Exécutés (DOE), ainsi que la vérification de la complétude du DOE, l'archivage physique et numérique du DOE selon un plan de classement par domaine technique (à titre indicatif, 40 à 50 DOE/an). - la réception et le suivi en GMAO des anomalies sur les données patrimoniales et la fourniture d'informations patrimoniales, l'extraction d'historiques ou des vérifications de cohérence d'informations. - la création, la mise à jour et l'intégration dans les outils du CEA des plans du référentiel patrimonial suite aux travaux ou aux anomalies constatées (à titre indicatif, 1 500 créations et mises à jour de plans/an - plans de réseau, câblages électriques, synoptiques, plans d'implantation…). - le contrôle de cohérence de l'inventaire afin de vérifier la bonne application des règles d'identification des actifs dans la GMAO, de réaliser des contrôles d'inventaire physique par échantillonnage (sur un parc de 24 500 actifs) et de suivre informatiquement les OT d'écarts d'inventaires déclarés lors des vérifications règlementaires (à titre indicatif, 2 000 créations d'actifs/an, 1 500 modifications/an et 1 000 écarts d'inventaires/ an). - la coordination de planification de la maintenance annuelle de certains bâtiments (18, à titre indicatif), l'impression de fiches inventaires pré-formatées suivant le planning de maintenance planifiée.

Purchase and maintenance of subscription licenses BlueCielo Meridian under the GIPS project.

Commissariat à l'énergie atomique et aux énergies alternatives | Published October 9, 2014  -  Deadline November 12, 2014
cpvs
48000000, 48613000

Under the GIPS project, the CEA wishes to redefine its range of tools for wealth management. The definition of an Electronic Document Management Techniques EGTD included in the scope of the new target system. The chosen after consideration for electronic technical document management solution is the Meridian system BlueCielo. CEA / DAM wishes to acquire in 2014 and 2015 all Meridian licenses necessary for the development of its future wealth management tool. The architecture is oriented towards the following solution: - A centralized database server at the central site data (also used as fillers) - 4 file servers for locating fillers at each remote site - 210 users in production (customer heavy) with 30% of concurrent users - 1,200 users in consultation (thin client) with 30% of concurrent users The estimated need in terms of licenses is as follows: - 5 Server Licenses BC Meridian - 5 Server Licenses BC Publisher - 210 Meridian Licenses (fat clients) - 1 Unlimited license for an intranet portal application providing a link to the Meridian EGTD component. The duration of the contract according to the phases is estimated at: - Purchase of licenses BlueCielo Meridian 24 months - Subscription maintenance licenses: 36 months

Architectural, construction, engineering and inspection services

Commissariat à l'Energie Atomique — CEA | Published February 17, 2015  -  Deadline March 29, 2015
cpvs
71000000, 71240000, 71300000

On the site of CEA CESTA, some works are to be carried out either to accommodate equipment or additional functionality Megajoule Laser, or to adapt to new stresses and / or renovate some existing or related facilities megajoule laser. Project management of these works is provided by the CEA. The benefits of providing a work at CEA management assistance for studies, follow-up work and testing of these structures. These services may concern all construction techniques and equipment industrial buildings housing complex process controlled atmosphere (ISO 8, ISO 7) and radiological restricted area.

Architectural, construction, engineering and inspection services

Commissariat à l'énergie atomique et aux énergies alternatives | Published May 8, 2015  -  Deadline June 19, 2015
cpvs
71000000, 71200000, 71300000, 71520000

Concours relatif à la conception et au suivi de réalisation d'un ou de bâtiments constituant l'installation BISC sur le centre CEA de Valduc.
  • 1