Call +44 800 9755 164

Public tenders for architect, architecture in Arpajon...

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural, construction, engineering and inspection services

CEA (Commissariat à l'énergie atomique et aux énergies alternatives) | Published March 31, 2017  -  Deadline May 4, 2017
cpvs
71000000

Assistance to the ECA, Project Manager, for monitoring the market "studies and works of civil engineering market, finishing work, handling means," relating to the extension and reconfiguration of buildings EPURE facility.

Benefits include: advisory and expertise, VISA missions, DET, AOR, follow-up mission of raising reserves and overall testing

And especially:

- compliance calculation notes, plans, execution doc

- compliance with the technical notes

- compliance of studies tests, convenience and control of materials produced

- monitoring of safety evidence

- compliance of electrical diagrams; executed projects and works, related to the contractual specifications

- manufacturing control, appros and assembly work on the site

- control of work for compliance breakpoints and info CEA

- tests on-site control and landings

- compliance doc studies related to the contractual specifications.

The set is about 150 local.

The support contract involves civil construction and finishing work, handling and special doors, including:

carcass work (earthworks, embankments, reinforced concrete and structural steel), the second work (metalwork, locksmithing, coatings, paint, resin, partitions, false floors, false ceilings, interior carpentry, plumbing, signage), lifting means , elevators, overhead cranes, VRD, doors, specific radiological doors, casing, sealing, cladding, drainage blanket and drainage under slab, the synthesis of TCE implementation studies (ventilation, electricity. ..) and the execution of studies of the work described above.

steelwork structures are also included in the market.

The volume of concrete to deconstruct the block is to reconfigure the order of a few hundred tonnes.

The contract includes:

a firm hand on VISA missions, DET, AOR blocks G and H

an optional hand on VISA missions, DET, AOR for the block E and monitoring levees reserves and overall testing.

  • 1