Call +44 800 9755 164

Public tenders for architect, architecture in France

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

advisory mission in architecture and urbanism

Ville de caen | Published November 12, 2016
The contractor will perform an architect and urban planner Mission Board comprises the following tasks: -conseil in architecture from the Directorate of -conseil architectural and urban planning, upstream on the developed projects and studies préalablesAccord -Frame with mini and maxi and a total économique.La operator commands the framework agreement is between a minimum and a maximum, defined as follows: minimum amount 47 69 j j maximum amount. These amounts will be identical to the renewal terms. The framework agreement is concluded for a period of 1 year as of 01/01/2017 or the date on which it will be made enforceable (notification) if it is later, on 31/12/2017

advisory mission in architecture and urbanism

Mairie de Caen | Published November 10, 2016  -  Deadline December 13, 2016
advisory mission in architecture and urbanism

Advisory architectural services

Ville de Caen | Published November 15, 2016  -  Deadline December 13, 2016

The contractor will perform an architect and urban planner Mission Board comprises the following tasks: -conseil architecture with the architectural and urban -conseil Planning Branch, upstream on the developed projects and feasibility studies framework agreement with a minimum and maximum and operator économique.la total orders of the framework agreement is between a minimum and a maximum, defined as follows: minimum amount 47 69 j j maximum amount. These amounts will be identical to the renewal terms. The Framework Agreement is concluded for a period of 1 year as of 01/01/2017 or the date on which it will be made enforceable (notification) if it is later, on 31/12/2017.

Framework Agreement with mini and maxi and an operator économique.la total amount of orders of the framework agreement is between a minimum and a maximum, defined as follows: Minimum amount 47 69 j j maximum amount. These amounts will be identical to the renewal terms. The Framework Agreement is concluded for a period of 1 year as of 01/01/2017 or the date on which it will be made enforceable (notification) if it is later, on 31/12/2017.

Modernization of the IT architecture colleges of Indre

Département de l'Indre Direction des Routes, des Transports, du Patrimoine et de l' Education | Published July 25, 2016
Modernization of the IT architecture colleges of Indre

Technical control mission on the partial restructuring and renovation of the Museum of Orleans for Biodiversity and the Environment - Architecture and Design

VILLE D'ORLÉANS M. le Maire Place de l'Etape 45040 Orléans - Cedex 1 Tél : 02 38 78 40 30 | Published April 29, 2016  -  Deadline December 20, 2016
This consultation is to fulfill the mission of technical control on the partial restructuring and renovation of the Museum of Orleans for Biodiversity and the Environment - Architecture and Design and will lead to a common market and divided into slices phases, non-extendable and non alloti.

Technical control mission on the partial restructuring and renovation of the Museum of Orleans for Biodiversity and the Environment - Architecture and Design

VILLE D'ORLÉANS M. le Maire Place de l'Etape 45040 Orléans - Cedex 1 Tél : 02 38 78 40 30 | Published April 29, 2016
This consultation is to fulfill the mission of technical control on the partial restructuring and renovation of the Museum of Orleans for Biodiversity and the Environment - Architecture and Design and will lead to a common market and divided into slices phases, non-extendable and non alloti.

centralized backup architecture

Universite de corse | Published December 6, 2016  -  Deadline January 3, 2017

Advisory architectural services

Centre national d'études spatiales — centre spatial Guyanais | Published November 18, 2016  -  Deadline January 10, 2017

Mastery of work in the framework of the renovation of the building EUROPE.

The Europe building, originally designed as the first museum of the Guiana Space Centre, is structural rather singular manner in relation to other buildings of the Technical Centre with structural elements perimeter, four central posts and a secondary structure made entirely of metal. These origins offer oddities such as a large double door 5.00 m wide and 6.00 m high. Quickly, the museum approach the heart of the technical center has been abandoned in favor of a new space museum building leans against the Jupiter 2, out of area controlled strictly.

Its organic nature of the building resulted in a conversion to restore purposes to all users of the site. Indeed, the large volume any height, occupying half the volume was legitimately transformed into a dining room, the other half volume focuses:

- The Ground floor technical space restoration and local agents, a significant number of sanitary and technical rooms,

- Upstairs, the half plate was invested in eight nine commercial spaces more or less easily organized and seeking natural light.

In terms of architectural design, the new redevelopment projects of the CNES Technical Centre are the subject of special attention on three points:

- The image of the site,

- Registration in the urban environment,

- Landscaped environment, while transcending the recurring image of the architecture of the 60s.

Advisory architectural services

Métropole de Lyon | Published November 9, 2016  -  Deadline December 12, 2016
This contract is for an urban planner Mission chief landscape architect of the ZAC Mermoz South / management assistance work urban environmental quality / environmental quality of buildings in Lyon 8th.

Mission Architect habitat coordinator

SEBL (SOCIETE D'EQUIPEMENT DU BASSIN LORRAIN) | Published November 23, 2016  -  Deadline December 15, 2016
Mission coordinator architect of the sector habitat of marine recreational base Lower Ham (21 lots of individual houses)

Mission Architect habitat coordinator

SEBL (SOCIETE D'EQUIPEMENT DU BASSIN LORRAIN) | Published November 23, 2016  -  Deadline December 15, 2016
Mission coordinator architect of the sector habitat of marine recreational base Lower Ham (21 lots of individual houses)

Area setting value of the architecture and heritage of Dunkirk

Communaute urbaine de dunkerque | Published December 3, 2016
Area setting value of the architecture and heritage of Dunkirk (slices market)

Mission Architect Advisor

Ville de bourg-les-valence | Published November 10, 2016  -  Deadline December 2, 2016

Villeurbanne - urbanist Mission landscape architect in chief amo zac and urban environmental quality / environmental quality of the building to the Saint Jean area

Metropole de lyon | Published November 16, 2016
This contract is for an assignment planner landscape architect in chief of the BIA and assistance to project management urban environmental quality / environmental quality of the building to the Saint Jean Villeurbanne.

Technical control mission on the partial restructuring and renovation of the Museum of Orleans for Biodiversity and the Environment - Architecture and Design

Ville d'orleans | Published November 29, 2016  -  Deadline December 20, 2016

Restricted competition of architecture and engineering on "Sketch +" to designate a prime contractor for sports facilities construction project

Mairie de Port Saint Louis du Rhone | Published November 8, 2016
The market aims to appoint a project manager for sports facilities construction project

Advisory architectural services

Immobilière 3F | Published November 30, 2016

project management services.

Advisory architectural services

Atlantic Aménagement | Published November 24, 2016

project management contract for the implementation of a program RT 2012-10% certified Habitat and Environment profile 80 social housing for SDP 5200 m 2 , 61-63 Peyronnet street, 9 rue Dom Devienne and 16-18 Lentillac street in Bordeaux (33800).

The contract includes a project management basic mission.

Advisory architectural services

Mairie de Saint-Paul | Published December 2, 2016  -  Deadline January 23, 2017

The project involves the construction of a 850 m library 2 of floor space on the plot EO 494 (over 280 m 2 external) on the part at the back of the building occupied by the Mascarene Food Bank. It is a population base of 15,000 people that is waiting for a structure that may match their expectations. This is an area that will see its population increase with delivery to come from Tournan Carly operation.

The estimated amount of the works is € 2.6 million before tax.

project management contract within the meaning of the law Law No 85-704 of 12.7.1985 on the public project contracting and its relationship with the private project of the decree and the effect on 29.11.1993 the areas of building (new construction).

Advisory architectural services

Logirem | Published December 2, 2016  -  Deadline January 18, 2017

project management contract for the rehabilitation of five homes of the BIA Finosello in Ajaccio (496 units).

Firm phase: DIA mission elements.

Optional slice: mission elements AVP-PRO-DCE-VISA-DET-AOR.