Public tenders for architect, architecture in Vantaa Finland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

The sun stone school 2nd phase of expansion, HVAC design

Vantaan kaupunki | Published May 12, 2016  -  Deadline May 26, 2016
cpvs
71320000

The sun stone school 2nd phase of expansion, HVAC design procurement is also an art school and a music school operating in the building. The sun stone's 2nd phase involves the expansion of the building of school facilities in respect of secondary school classes yhtenäiskoulu. Extension modules will be joining integrally the first phase of building the frame. 1st and 2nd phase will form a coherent whole, so that the structural and technical systems are compatible with each other. Spatial design and technical solutions related to education-oriented culture change and a new curriculum. This phenomenon-based learning, yhteisopettajuus, the effective use of information technology, as well as interactive collaboration of teachers and student groups are part of the changing learning environment. The facilities are designed flexible and versatile. the first stone construction of solar construction will be completed in June 2016. The clinic, kindergarten and primary school construction work included in the first construction phase, as well as kindergarten and school yard work. The second phase two expansion parts, whose location and massing comply with the architect of the winning and the actual proposal for a solution. The building phase 1 facilities are in operation 2.vaiheen construction period. Rake-build- ing work since August 2016, health clinics, youth health point, kindergarten, primary school, an art school and a music school. The project cost estimate is 14.3 million. €. The solution district heating energy produced and the site of the renewable energy requirement is applied in the roof with solar panels installed on. BIM design is carried out in accordance with the Helsinki Metropolitan Area Council 2012 guidelines (see http://buildingsmart.fi.) TATE-demand model in accordance with the Level 2 and its complementary Annex Building Services Engineering modeling requirements and in accordance with the general policies in the City of Vantaa Health Centre BIM - instruction. The modeling is performed so that the data models of the 1st and 2nd stage of forming the converging unit, formed by the two phases of the data model can be examined and worked with the same software. Planning Tasks will be a clearer definition of the technical design of the invitation to tender house-do list, according TATE12. The project will be carried out if the city council approves the project plan in the autumn of 2016. The extension will be introduced in August 2019. The project's working language is Finnish, and all the documents drawn up in the Finnish language. The client acquires the object structure, - HVAC and electrical engineers a competitive process separately.

Direct link to the notification of additional information can be found here Hilma-notification.

The sun stone school 2.vaihe, expansion, electrical engineering

Vantaan kaupunki | Published May 12, 2016  -  Deadline May 27, 2016
cpvs
71321000

The sun stone school 2.vaihe, expansion, acquisition of electrical design is also an art school and a music kiopisto work in the building. The sun stone's 2nd phase involves the expansion of the building school premises middle school luok-banks with regard to the comprehensive model. Extension modules will be joining integrally the first phase of building the frame. 1st and 2nd phase will form a coherent whole, so that the structural and technical systems are compatible with each other. Spatial design and technical solutions related to education-oriented culture changes, and the new curriculum. This phenomenon-based learning, yhteisopettajuus, the effective use of information technology as well as teachers and student groups in an interactive by cooperating are part of the changing learning environment. The facilities are designed flexible and versatile. The sun stone first construction works will be completed in June-October clinic, kindergarten and primary school construction work were included in 2016. The first construction phase, as well as kindergarten and school yard work. The second phase two expansion parts, whose location and massing comply with the architect of the winning and the actual proposal for a solution. The building phase 1 facilities are in operation 2.vaiheen construction period. Rake-build- ing work since August 2016, health clinics, youth health point, kindergarten, primary school, an art school and a music school. 5240 gross m2. The project cost forecast of 14.3 million. €. Energy solution district heating and uu-newable energy requirement to be produced on the spot carried out on the attitude of the roof with solar panels. TATE-demand model in accordance with the Level 2 and its complementary busi-compound Technical Building modeling requirements and in accordance with the general operating principles of BIM City of Vantaa Health Centre - advice. The modeling is performed so that the data models of the 1st and 2nd stage of forming the converging unit, formed by the two phases of the data model can be examined and worked with the same software. Planning Tasks will be a clearer definition of the technical design of the invitation to tender house-do list, according TATE12. The project will be carried out if the city council approves the project plan in the autumn of 2016. The extension will be introduced in August 2019. The project's working language is Finnish, and all the documents drawn up in the Finnish language. The client acquires the object structure, - HVAC and electrical engineers a competitive process separately.

Direct link to the notification of additional information can be found here Hilma-notification.

The sun stone school 2nd phase of expansion, HVAC design

Vantaan kaupunki | Published May 12, 2016  -  Deadline May 26, 2016
cpvs
71320000

The sun stone school 2nd phase of expansion, HVAC design procurement is also an art school and a music school operating in the building. The sun stone's 2nd phase involves the expansion of the building of school facilities in respect of secondary school classes yhtenäiskoulu. Extension modules will be joining integrally the first phase of building the frame. 1st and 2nd phase will form a coherent whole, so that the structural and technical systems are compatible with each other. Spatial design and technical solutions related to education-oriented culture change and a new curriculum. This phenomenon-based learning, yhteisopettajuus, the effective use of information technology, as well as interactive collaboration of teachers and student groups are part of the changing learning environment. The facilities are designed flexible and versatile. the first stone construction of solar construction will be completed in June 2016. The clinic, kindergarten and primary school construction work included in the first construction phase, as well as kindergarten and school yard work. The second phase two expansion parts, whose location and massing comply with the architect of the winning and the actual proposal for a solution. The building phase 1 facilities are in operation 2.vaiheen construction period. Rake-build- ing work since August 2016, health clinics, youth health point, kindergarten, primary school, an art school and a music school. The project cost estimate is 14.3 million. €. The solution district heating energy produced and the site of the renewable energy requirement is applied in the roof with solar panels installed on. BIM design is carried out in accordance with the Helsinki Metropolitan Area Council 2012 guidelines (see http://buildingsmart.fi.) TATE-demand model in accordance with the Level 2 and its complementary Annex Building Services Engineering modeling requirements and in accordance with the general policies in the City of Vantaa Health Centre BIM - instruction. The modeling is performed so that the data models of the 1st and 2nd stage of forming the converging unit, formed by the two phases of the data model can be examined and worked with the same software. Planning Tasks will be a clearer definition of the technical design of the invitation to tender house-do list, according TATE12. The project will be carried out if the city council approves the project plan in the autumn of 2016. The extension will be introduced in August 2019. The project's working language is Finnish, and all the documents drawn up in the Finnish language. The client acquires the object structure, - HVAC and electrical engineers a competitive process separately.

The sun stone school 2.vaihe, expansion, electrical engineering

Vantaan kaupunki | Published May 12, 2016  -  Deadline May 27, 2016
cpvs
71321000

The sun stone school 2.vaihe, expansion, acquisition of electrical design is also an art school and a music kiopisto work in the building. The sun stone's 2nd phase involves the expansion of the building school premises middle school luok-banks with regard to the comprehensive model. Extension modules will be joining integrally the first phase of building the frame. 1st and 2nd phase will form a coherent whole, so that the structural and technical systems are compatible with each other. Spatial design and technical solutions related to education-oriented culture changes, and the new curriculum. This phenomenon-based learning, yhteisopettajuus, the effective use of information technology as well as teachers and student groups in an interactive by cooperating are part of the changing learning environment. The facilities are designed flexible and versatile. The sun stone first construction works will be completed in June-October clinic, kindergarten and primary school construction work were included in 2016. The first construction phase, as well as kindergarten and school yard work. The second phase two expansion parts, whose location and massing comply with the architect of the winning and the actual proposal for a solution. The building phase 1 facilities are in operation 2.vaiheen construction period. Rake-build- ing work since August 2016, health clinics, youth health point, kindergarten, primary school, an art school and a music school. 5240 gross m2. The project cost forecast of 14.3 million. €. Energy solution district heating and uu-newable energy requirement to be produced on the spot carried out on the attitude of the roof with solar panels. TATE-demand model in accordance with the Level 2 and its complementary busi-compound Technical Building modeling requirements and in accordance with the general operating principles of BIM City of Vantaa Health Centre - advice. The modeling is performed so that the data models of the 1st and 2nd stage of forming the converging unit, formed by the two phases of the data model can be examined and worked with the same software. Planning Tasks will be a clearer definition of the technical design of the invitation to tender house-do list, according TATE12. The project will be carried out if the city council approves the project plan in the autumn of 2016. The extension will be introduced in August 2019. The project's working language is Finnish, and all the documents drawn up in the Finnish language. The client acquires the object structure, - HVAC and electrical engineers a competitive process separately.

Internet services

Finavia Oyj | Published November 24, 2016  -  Deadline December 13, 2016
cpvs
72400000

the subject of the contract is finavia.fi-network design and implementation, as well as application support and operation services for Drupal 8, Sitecore and EPiServer platform.

Acquired includes:

- Functionalities and integrations described in Annexes 1-3 in focus shooting in cooperation with Finavia and Finavia's system partners, technical feasibility level,

- MVP-network implementation (functionality, integrations, page templates, etc. coding.)

- Cascading described the visual concept (concept delivered to selected providers) look to a new web service,

- Information technology, infrastructure and application architecture design and implementation,

- The introduction and testing of the finished web,

- Collection of website statistics (Google Analytics and TagManager), Dashboard views, as well as metrics

- User support, hosting service, software maintenance and use of the service.

Optional Finavia ask the tenderer to carry out after the introduction of the other functionalities of the site, which is presented as options MVP-definition (see Annex 1).. Finavia to inform the service provider the opportunity to use the option in the first contract.

Online service delivery project will begin after the conclusion of the contract, project design, user interface design and specification refinement.

Finavia's aim is that the project can be launched in February 2017. The new website aims to build during the February-April 2017, so that content can be started in May 2017 and the site can be made immediately release the contents of the production is completed.

The precise timetable for the phasing of the project and agreed with the elected supplier. The supplier must tender to describe a realistic proposal for the project's timetable.

Martinlaakso kindergarten, the statement of participation

Vantaan kaupunki | Published November 26, 2015  -  Deadline December 14, 2015
cpvs
71230000

The City of Vantaa Mode Centre organizes an invitational competition for the limited Martinlaakso kindergarten architectural design Finnish Association of Architects rules. Nursery carried out in 160 children. The project cost estimate is about 3225 € / gross m2 (VAT 0%), which 5,3M € (alv0%) if the scope of the project objectives are met. Martinlaakso kindergarten architecture invitational design competition is in accordance with the Public Procurement Act. Health Centre concludes in the main and with the direct purchase agreement on the basis of the architectural design of the winning architects' office, if the acquisition of the key objectives set out in the procurement documents are realized. Contract notice, the competition appendices and attachments form the contract of acquisition of documentation. Competition takes place 01.12.2015 - 12.4.20162016 and the results will be published in May 2016. The design phase 5/2015 -2/2017. Estimated to be completed, notice is 8/2018. As a result the competition provides the preliminary draft of a new day-care center. Project planning will start immediately the competition is awarded. Major and architectural design mandate includes, in yard design, kitchen design, acoustic design and fire consultancy. After the competition, the design is done by modeling in accordance with the Helsinki Metropolitan Area Council in 2012 in accordance with the guidelines of Vantaa space center public policy rules. The candidate shows the participation declaration attached references for evaluating the quality and the total in further planning. Building design task is "demanding" RT YM1-21638. No electronic registrations and attachments. The Registry shall address: City of Vantaa / Registrar, Station 7, 01300 Vantaa. The envelope should be marked VD / 9148 / 02.08.00.00 / 2015.

Martinlaakso day-care center, new building, HVAC design

Vantaan kaupunki | Published April 1, 2016  -  Deadline April 25, 2016
cpvs
71320000

Martinlaakso kindergarten, new construction, resulting in HVAC design competition, the acquisition provides a preliminary outline of a new day-care center. The design goal of 8.5 m2 / child. The project cost estimate is about 3225 € / gross m2 (VAT 0%), or € 5,3M (alv0%) if the scope of the project objectives are met. Energy Solution is heat dissipation from district heating and solar photovoltaic system. New building information modeling is planned in accordance with the rule, YTV's Public Information Modeling requirements in 2012, part 4 - Help (. See http://buildingsmart.fi) TATE-demand model in accordance with the Level 2 and its complementary Annex Building Services Engineering modeling requirements and in accordance with the general policies in the City of Vantaa Health Centre BIM - instructions. The project's working language is Finnish, and all the documents drawn up in the Finnish language. Object estimated completion date is 8/2018. The client acquires the object main architect and designer architectural competition as well as through structural, and electrical designers HEVAC separately through competition. This acquisition covers Martinlaakso kindergarten new building for the MRL in accordance with § 120 ce HVAC design functions. The design task will be to define more precisely the call for tenders house technical design of the to-do list, according TATE12.

Direct link to the notification of additional information can be found here Hilma-notification.

Kuusela family rehabilitation additional design of the building acquisition

Vantaan kaupunki | Published November 17, 2015  -  Deadline December 11, 2015
cpvs
71000000

Kuusela family rehabilitation annexe is avohuollollinen service center in the city of Vantaa family services, child welfare services. The focus of the new building activities is 6 months - 1 year in length, taking into care and prevention, family rehabilitation. The annexe is placed in with the existing buildings Kuusela family rehabilitation center in the same plot. This will increase the työsuojelullista safety, strengthen the opportunities for cooperation and action is cost-effective. Food - and plant management, waste management and a variety of group activities are conducted jointly with the operations and personnel of the existing family-rehabilitation center. Additional building are six apartments and communal areas. New building of 2-3 storeys. New building information modeling is planned. The data model is done by YTV in 2012 precision level 2 (RT 10-11068), as well as the City of Vantaa Health Centre BIM general operating chine that. The design task is vaativuusluokaltaan demanding. MRL 120 e § (14/2014) Designers eligibility requirements. The project's working language is Finnish, and all the documents drawn up in the Finnish language. Lettable area according to the project plan is 600 HTM2 and the gross 955 gross m2. The target of the project is EUR 2 490 000 (VAT 0%). Planning starts in February 2016 and the contract design will be completed in October 2016. The building will be completed at the end of 2017. The customer is the design of a contractual Lead Designer, which acquires design team. Planning group includes architectural, structural, electrical and HEVAC designer and the BIM Coordinator. Head designer is architect. NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

CORRECTION NOTICE: Vaarala park nursery

Vantaan kaupunki | Published January 20, 2015  -  Deadline February 17, 2015
cpvs
71200000

Vaarala park, a new day care center serving six groups of children, a total of 126 children. The project plan with lettable area is 987 HTM2 and the gross 1460 gross m2. The target of the project is 4 950 000 EUR (VAT 0%). Vantaa City State Centre organizes a narrow invitational competition Vaarala Park kindergarten architectural design of Finnish Association of Architects rules. The project is in Vantaa near-zero energy building a pilot project. Competition stage, almost nollaenergisrakentamista estimated Vantaa nearly zero-energy building concept in accordance with the 'weighted form factor' allows. The task does not include energy accounting. The competition results in a new kindergarten preliminary draft. Competition entry is done by modeling, which is the basis of the actual design of BIM. The competition will take place from March to April / 2015, and the results are published 5 / 2015. The project is estimated for completion in June 2017. The application to participate leavers and suitability qualified candidate from among the three participants in the contract notice indicated criteria. For each paid 15 000 € (VAT 0%) fee. The winner will be selected was directly in the main architect and designer. Planning for the project will start immediately the competition is awarded. The main and architectural design premium ceiling price is competitive premium in addition to 95 000 EUR (alv0%), including kitchen and garden design. Department of kitchen design, as well as the land transport and green design consultant is required to hire professional subconsultants. Laitoskeittiösuunnitteluna not accepted Department of kitchen equipment products for the design. Applicants for the candidate accepts the Annexes in accordance with the mission essential contract and based on them, the ceiling price. NOTE! Notification information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also, the offer / request to participate transmission is made through this. A direct link to the alert information can be found here Hilma notification.

Vaarala park nursery

Vantaan kaupunki | Published January 20, 2015  -  Deadline February 17, 2015
cpvs
71200000

Vaarala park, a new day care center serving six groups of children, a total of 126 children. The project plan with lettable area is 987 HTM2 and the gross 1460 gross m2. The target of the project is 4 950 000 EUR (VAT 0%). Vantaa City State Centre organizes a narrow invitational competition Vaarala Park kindergarten architectural design of Finnish Association of Architects rules. The project is in Vantaa near-zero energy building a pilot project. Competition stage, almost nollaenergisrakentamista estimated Vantaa nearly zero-energy building concept in accordance with the 'weighted form factor' allows. The task does not include energy accounting. The competition results in a new kindergarten preliminary draft. Competition entry is done by modeling, which is the basis of the actual design of BIM. The competition will take place from March to April / 2015, and the results are published 5 / 2015. The project is estimated for completion in June 2017. The application to participate leavers and suitability qualified candidate from among the three participants in the contract notice indicated criteria. For each paid 15 000 € (VAT 0%) fee. The winner will be selected was directly in the main architect and designer. Planning for the project will start immediately the competition is awarded. The main and architectural design premium ceiling price is competitive premium in addition to 95 000 EUR (alv0%), including kitchen and garden design. Department of kitchen design, as well as the land transport and green design consultant is required to hire professional subconsultants. Laitoskeittiösuunnitteluna not accepted Department of kitchen equipment products for the design. Applicants for the candidate accepts the Annexes in accordance with the mission essential contract and based on them, the ceiling price. NOTE! Notification information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also, the offer / request to participate transmission is made through this. A direct link to the alert information can be found here Hilma notification.

Aviapolis Urban Blocks -arkkitehtuurikilpailu

Vantaan kaupunki | Published December 14, 2016  -  Deadline April 28, 2017
cpvs
71230000

Open international arkkitehtuurikipailu. Competition in Finnish and English. The City of Vantaa organized in conjunction with private landowners in an open international ideas competition Veromies district are placed in the area Aviapolis block areas planning. The competition is planned in the area housing, jobs and public and private services. Architecture purpose of the competition is to produce a range of land use and town planning as a basis for the idea-level plan that supports Aviapolis vision and creates a distinctive image and identity. The organizers are the City of Vantaa, as well as private landowners, YIT Construction Ltd, Real Estate Company Rälssitie 16, Property Oy Vantaa Paavo's house, L-House Oy and Oy DBCSystems. Competition carried out in cooperation with the Finnish Association of Architects (SAFA) in accordance with the Guiding Architects' Association as a competition date is 16.1-26.4.2017. The competition is open to all and the nature of idea competition, which does not result in the assignment. However, the competition organizers reserve the option to subscribe to our award-winning design work or redeemed from the makers of the proposals. Open international arkkitehtuurikipailu. Competition in Finnish and English.

Vantaa Hakunilan kaavarunkotyö

Vantaan kaupunki | Published February 26, 2016  -  Deadline March 31, 2016
cpvs
71200000

City of Vantaa, land use, construction and environmental sector will invite bids Hakunilan the area of ​​land use planning idea-tier formula for body work. Vantaa architecture program in 2015 is defined in the general urban development objectives. Centers to ensure a continuous and diverse housing, access to services, public transport, good cycling and walking routes, high-quality public outdoor spaces and great connections with the wider green areas. The aim is that in the future Hakunila is a vibrant and attractive residential environment of different ages and different walks of life for residents. diversified development center and a varied housing lisäämi¬nen is important to the region attractiveness and the preservation of services. the preservation and the development of services aimed at supporting complementary construction. Vantaa 94. Hakunilan district covers an area of ​​about 3,1km2. The district was the turn of the year 2014-2015 a total population of 11 300. The Area Planning are presented in Annex 2. Most of the map position of the formulas date back to the 1970s.

Direct link to the notification of additional information can be found here Hilma-notification.

Architectural, construction, engineering and inspection services

Vantaan kaupunki | Published January 19, 2016
Winner
WSP Finland Oy
cpvs
71000000

City of Vantaa, design and expert services Framework 2016-2017 and + 2 year option period with the following areas: transport, roads, water services, green areas, sports areas, courtyards, skill structures and geotechnical design and construction of municipal infrastructure. The notice involves a framework agreement. Note. Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. A direct link to the notification the additional information can be found here Hilma notification: https://tarjouspalvelu.fi/vantaa/?id=51747&tpk=8ef1dd47-8167-43e1-82cd-214de0eb3076

Architectural, construction, engineering and inspection services

Vantaan kaupunki | Published August 14, 2015  -  Deadline September 7, 2015
cpvs
71000000

City of Vantaa, design and expert services framework agreement (2016-2017 and two-year option period), which includes the following areas: transport, roads, water supply, parks, sports areas, courtyards, skill structures and geotechnical engineering and municipal infrastructure construction. The notice involves a framework agreement. Note. Ad information can be found Tarjouspalvelu.fi supplier portal. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification: https://tarjouspalvelu.fi/vantaa/?id=32571&tpk=ebe9320b-0b94-40c6-a6da-177f3831bb9c

Architectural, construction, engineering and inspection services

Vantaan kaupunki | Published April 16, 2015
cpvs
71000000

Vantaan kaupungin teknisen infran suunnittelu- ja asiantuntijapalveluiden puitesopimuskonsulttien hankinta 2016–2017 (ja + 2 vuoden optiokausi).

SUSPENSION NOTICE: Aviapolis Urban Blocks -arkkitehtuurikilpailu

Vantaan kaupunki | Published December 23, 2016
cpvs
71230000

Open international arkkitehtuurikipailu. Competition in Finnish and English. The City of Vantaa organized in conjunction with private landowners open ideas competition Veromies district are placed in the area Aviapolis block areas planning. The competition is planned in the area housing, jobs and public and private services. Architecture purpose of the competition is to produce a range of land use and town planning as a basis for the idea-level plan that supports Aviapolis vision and creates a distinctive image and identity. The organizers are the City of Vantaa, as well as private landowners, YIT Construction Ltd, Real Estate Company Rälssitie 16, Property Oy Vantaa Paavo's house, L-House Oy and Oy DBCSystems. Competition carried out in cooperation with the Finnish Association of Architects (SAFA) in accordance with the Architects' Association of the competition. Estimated time of the competition is 16.1-26.4.2017. The competition is open to all and the nature of idea competition, which does not result in the assignment. Open international arkkitehtuurikipailu. Competition in Finnish and English.

Martinlaakso kindergarten, the acquisition of the BIM coordinator

Vantaan kaupunki | Published August 23, 2016  -  Deadline September 16, 2016
cpvs
71600000

Tasks BIM coordinator in the project "Martinlaakso kindergarten". Tasks are described in tasks 4 BIM coordinator in the invitation to tender annexed. Object lettable area of ​​1,200 hym2, gross area approx. 1645 m2 and cost forecast 5, 3 million. €. Kindergarten carried out in 160 children. Target is carried out in accordance with the Vantaa almost 0-energy concept. The project has provided a concise architecture invitational 12.1. - 04.12.2016. The project schedule is described in the invitation to tender in paragraph 5 of Schedule. Offer asked to tuntiveloitusperusteisena a ceiling price. the content of the Offer are described in the content of the invitation to tender in the offer of 8 annexed. NOTE! Notification of additional information can be found on Offer Service -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. Direct link to the notification of additional information can be found here Hilma-notification.

Martinlaakso Path 3 / Total Design, requests to participate in the bidding

VAV Asunnot Oy | Published December 19, 2014  -  Deadline January 20, 2015
cpvs
71220000

Contract comprises a single design contract by the successful bidder architecture firms responsible for the design team (including erikoissuunittelun) Formation and plans will also be a special design. It is a district in the city of Vantaa Martinlaakso Quarter 17566 block of flats on a plot of 6 take the target. Apartments alustavati 51 pcs of which 15 pieces are directed to specific groups. The project scope is approximately 3150 m2. The aim is to build on the plot one of the eight-storey residential building. The plot of the LPA area, the design is included in the mandate. The project is funded by ARA loan interest subsidy. The town plan and zoning regulations are attached to the contract notice. Preliminary schedule subject to change: - enrollments tender 19.12. - 20.01.2015. - The tender 26.1. - 10.03.2015. - The purchasing decision 04.07.2015. Procurement decision shall be communicated to providers to notify the e-mail address: - the design starting in April 2015. - contract calculation fall 2015 / winter 2016.

The sun stone school 2nd phase of expansion, structural and geotechnical design

Vantaan kaupunki | Published June 3, 2016  -  Deadline June 17, 2016
cpvs
71320000

The sun stone school 2nd phase of the expansion, the acquisition of structural and geotechnical design of phase 1 construction is completed 06/2016. The second phase two expansion parts, whose location and massing comply with the architect of the winning and the actual proposal for a solution. Extension modules will be joining integrally the first phase of building the frame. 1st and 2nd phase will form a coherent whole, so that the structural and technical systems are compatible with each other. Spatial design and technical solutions related to education-oriented culture change and a new curriculum. This phenomenon-based learning, yhteisopettajuus, the effective use of information technology, as well as interactive collaboration of teachers and student groups are part of the changing learning environment. The facilities are designed flexible and versatile. The building phase 1 facilities are in operation 2.vaiheen construction period. The project cost estimate is 14.3 million. €. The solution district heating energy produced and the site of the renewable energy requirement is applied in the roof with solar panels installed on. BIM design is carried out as a rule in accordance with the Helsinki Metropolitan Area Council 2012 guidelines (see http://buildingsmart.fi.) RAK-demand model in accordance with the Level 2 and its complementary appendices structural design, modeling accuracy, as well as in accordance with the general policies in the City of Vantaa Health Centre BIM - instruction. The modeling is performed so that the data models of the 1st and 2nd stage of forming the converging unit, formed by the two phases of the data model can be examined and worked with the same software. The project is a demanding with regard to load-bearing structures, building physics and geotechnical demanding demanding. Structural Engineering Task shall be specified in the invitation to tender in accordance with the structural and geotechnical design task lists RAK12 and GEO12. The project will be carried out if the city council approves the project plan in the autumn of 2016. The extension will be introduced in August 2019. The project's working language is Finnish, and all the documents drawn up in the Finnish language. Pääsuunnittelijana- and the consulting architect to continue the first phase.

Myyrmäki sports building facades renovation

Vantaan kaupunki | Published March 18, 2015  -  Deadline April 7, 2015
cpvs
45000000, 45111300, 45453100

Repairs to a Myyrmäki in the sports building facades lining the corrective action plans to the extent indicated. Repairs inside the concrete shell is mounted on top of the new insulation and alumiinikasettiverhous plans to the extent indicated. Old outer shells and thermal insulation materials unloaded before the curtain to open repair. Landed in the outer shell of the extent shown in the architect plans. It concrete plinths are made of concrete patch repair and maintenance of painting in those areas on the facade, which is made lining the repair. Façade renovation in the context of making the necessary räystäskorjaukset. In addition, make all penetrations and windows necessary seals swimming pool rebuilt the outer wall areas. Steel entrance doors to the new architectural plans to the extent indicated. From the inner sealing repairs are asked to enter the offer separate price.