Public tenders for architect, architecture in Turku Finland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural Competition

Turun Ylioppilaskyläsäätiö | Published January 18, 2017
cpvs
71230000

Turku Student Village Foundation organizes two student housing blocks of the design of the architectural competition. The competition is organized architecture of an invited competition in accordance with the principles of the construction design competition in which participants of competition are selected from among the minimum requirements to eligible registered. Design solutions will be the urban landscape, architecturally and functionally high-quality and viable. The design of the solution must meet the technical and economic, energy-saving and life-cycle financial goals in a fair, appropriate and feasible. The final amount of the construction takes shape further planning and change the formula of competition. assessed the extent of the competition new construction projects shall not exceed: 1. of 8 000 - 12 000 m² October 2 000 20 000kem² area 2 is pending before the town plan change / 9/2010 formula ID "Silence of the hill," diario number 13664-2009. The results of the contest will serve as the basis for the status change in the formula are prepared. Architecture complain about the competition, participants are invited to participate in the contest in the two regions, but the restoration of areas design competitions are held and settled in parallel separate competition. Turku Student Village Foundation organizes two student housing blocks of the design of the architectural competition. The competition is organized architecture of an invited competition in accordance with the principles of the construction design competition in which participants of competition are selected from among the minimum requirements to eligible registered.

Correction of Ilpoiset School 2018, Architectural Design

Turun Kaupunki | Published November 1, 2017  -  Deadline November 10, 2017
cpvs
71200000

The renovation of Ilpoiset School in 2018 will be used to correct the school's administrative premises (Rector, School Secretary, Teacher's Room, Health Care) and computer class. Architect designer will prepare the necessary workspaces for the competition with the building demarcation The repair of the Ilpoisten School 2018 will be used to correct the school's administrative premises (Rector, School Secretary, Teacher's Room, Health Care) and computer class. Architect designer creates the necessary worksheets for the competition with the building demos

A13325 Hämeenlinna women's prison, Project Planning, architect and principal

Senaatti-kiinteistöt | Published January 18, 2017  -  Deadline February 17, 2017
cpvs
71000000

The requirements in the contract documents in accordance with the specified Hämeenlinna women's prison new building project planning (planning and stock options) and the main architectural design of the Hämeenlinna prison campus. The extent of the building is approx. 6,500 gross m2, the project design will start immediately after the selection of designers. Completion of the project v. Towards the end of 2019. Hämeenlinna women's prison new building project planning (planning and stock options) and the main architectural design of the Hämeenlinna prison campus. The extent of the building is approx. 6,500 gross m2, the project design will start immediately after the selection of designers. Completion of the project v. Towards the end of 2019. Variants will be accepted (alternative tenders): no requirements in the contract documents in accordance with the specified

Organisation of architectural design contests

Turun Ylioppilaskyläsäätiö | Published January 19, 2017
cpvs
71230000

Turku Student Village Foundation organizes two student housing blocks of the design of the architectural competition.

The competition is organized architecture of an invited competition in accordance with the principles of the construction design competition in which participants of competition are selected from among the minimum requirements to eligible registered.

Design solutions will be the urban landscape, architecturally and functionally high-quality and viable. The design of the solution must meet the technical and economic, energy-saving and life-cycle financial goals in a fair, appropriate and feasible.

The final amount of the construction takes shape further planning and change the formula of competition. assessed the extent of the competition new construction projects shall not exceed:

August 1 000 - 12 000 m²;

October 2 000 and 20 000 m².

The region 2 is pending before the town plan change / 9/2010 formula ID "Silence of the hill," diario number 13664-2009.

The results of the contest will serve as the basis for the status change in the formula are prepared. Architecture complain about the competition, participants are invited to participate in the contest in the two regions, but the restoration of areas design competitions are held and settled in parallel separate competition.

Ilpoinen school, classroom renovations in 2017, the architectural design

Turun Kaupunki | Published December 21, 2016  -  Deadline January 3, 2017
cpvs
71200000

Ilpoinen the school will continue v.2015 and 2016, began a series of renovations class areas. the surfaces of facilities, equipment, furniture and new electrical systems in the documents submitted by the extent. The renovation work was carried out during the summer of 2017. The architect makes the chore pictures and historical documents, applying of special premises (warehouses, technical work in classrooms, IP-club) completely new plans Ilpoinen the school will continue v.2015 and 2016, began a series of renovations class areas. the surfaces of facilities, equipment, furniture and new electrical systems in the documents submitted by the extent. The renovation work was carried out during the summer of 2017. The architect makes the chore pictures and historical documents, applying of special premises (warehouses, technical work in classrooms, IP-club) completely new plans

Architectural, construction, engineering and inspection services

Turun Suomalaisen Yhteiskoulun kannatusyhdistys ry | Published May 20, 2015  -  Deadline June 16, 2015
cpvs
71000000, 71200000

Turku of the Finnish Yhteiskoulu Support Association to ask the applications of the Finnish Turku Yhteiskoulu the renovation of the main architect and designer tasks. The project will be renovated mainly built in 1929, this 6-storey school building, and in 1962 built, 2-storey new part of the interior, the house technology as well as the older wing of the roof astronomical observatories, with the exception of. Property floor area is 5 752 m2 and a volume of 27 900 m3. Planning Tasks will start in August 2015, the construction works will start in 2017.

Puro Pello school part C repair and repair of the facades, the architect (head) design

Turun Kaupunki | Published November 28, 2014  -  Deadline December 5, 2014
cpvs
71200000

Puro Pello C of the technical renovation. In 1958, the school was completed last uncorrected wing structure will be corrected. Wing is located mainly in special classes (technical and textile, music, visual arts) The premises of the new faces, as well as electrification technology. Renewal of the technology is to be implemented in two phases (summers 2015 and 2016), the entire building facades remediation planning a purchase. The facades are mainly red brick and eternit. The roof and windows have been renovated in the past. Facade Repair probably take place in 2017.

Organisation of architectural design contests

Turun Ylioppilaskyläsäätiö | Published February 24, 2017  -  Deadline March 14, 2017
cpvs
71230000

The competition is organized by the Turku Student Village Foundation. Architect Invited competition will be held two separate student housing property, enrolled in the competition for those selected. The competition is carried out in cooperation with the City of Turku.

The organizer invites proposals are the subject of competition, the block sets the architectural design. The competition used to find the personal touch, with the built environment are compatible, complementary to the environment, the urban landscape of high-quality, functional and deliverable both in terms of quality and cost-balanced design solutions to neighborhoods role in planning and construction.

The plans focus is on the coordination of infill with the old environment, reasonably priced housing and the improvement of services in the regions.

Items will be implemented in the ARA-funded affordability of student residences.

Additional information on the acquisition of the acquisition documents.

Architectural, construction, engineering and inspection services

Varsinais-Suomen sairaanhoitopiirin ky | Published August 19, 2015
Winner
Granlund Oy
cpvs
71000000

This is the second announcement. Southwest Finland Health Care District to request an offer T3 new building project, architectural, structural, HEVAC, electrical, GEO, rail and tiealuesuunnittelusta, fire technical design, sprinkler system design as well as the design of fixed hospital equipment (KSL) In accordance with the invitation to tender and the accompanying documents. The new building will be located after the completion of the management of Southwest Finland hospital paediatrics, obstetrics and gynecology, ear, nose and throat diseases, as well as oral and maxillofacial diseases and in medical support functions (imaging, laboratory sampling and Clinical Neurophysiology). The main objective of the project is to build a substitute healthy, safe and functional facilities of the current U-hospital functions and thus safeguard the hospital operating activities in the future. The project includes hospital operations benefited squares of 21 446 m2. The new building has a total area of ​​about 53 600 m2 and the construction of the cover a surface area of ​​approximately 9 010 m2. Project planning is carried out data modeling. Choose an architect to work in the principal designer with the exception of road and railway zone plan, for which the main designer is rail and road area designer. The architect responsible for the coordination of tasks between chief designer. Architect brings the above-mentioned other planning tasks of partners with which to give a joint bid in accordance with the design of the invitation to tender.

Hepokulla school, abc building repair, architectural and main design

Turun Kaupunki | Published December 21, 2017  -  Deadline January 7, 2018
cpvs
71200000

The abc building used by the Hepokulla School in the former special school is empty and is repaired to the main school. Small classes and 4 basic education groups are located in the premises. In addition, space is required for pre-school and afternoon classes. The partitions of the compartments contain asbestos and are completely dismantled. It is therefore possible to change the status bares, taking into account the boundary conditions (windows). Facilities are planned for a new learning environment, taking into account the need for small class students in a quiet, enclosed space. The building technology is completely renewed. The architect works as the main designer of the object The abc building used by the former school of Hepokoula School is empty and is repaired to the main school. Small classes and 4 basic education groups are located in the premises. In addition, space is required for pre-school and afternoon classes. The partitions of the compartments contain asbestos and are completely dismantled. It is therefore possible to change the status bares, taking into account the boundary conditions (windows). Facilities are planned for a new learning environment, taking into account the need for small class students in a quiet, enclosed space. The building technology is completely renewed. The architect acts as the main designer of the object

Correction Notice: Puro Pello school part C repair and repair of the facades, the architect (head) design

Turun Kaupunki | Published December 3, 2014  -  Deadline December 10, 2014
cpvs
71200000

Puro Pello C of the technical renovation. In 1958, the school was completed last uncorrected wing structure will be corrected. Wing is located mainly in special classes (technical and textile, music, visual arts) The premises of the new faces, as well as electrification technology. Renewal of the technology is to be implemented in two phases (summers 2015 and 2016), the entire building facades remediation planning a purchase. The facades are mainly red brick and eternit. The roof and windows have been renovated in the past. Facade Repair probably take place in 2017. The correction applies to the tender submission period, it has been extended to 10.12 until 12

Turku of the Finnish Yhteiskoulu the renovation of the main and architectural design tasks PARTICIPATION APPLICATION

Turun Suomalaisen Yhteiskoulun kannatusyhdistys ry | Published May 15, 2015  -  Deadline June 16, 2015
cpvs
71000000, 71200000

Turku of the Finnish Yhteiskoulu Support Association to ask the applications of the Finnish Turku Yhteiskoulu the renovation of the main architect and designer tasks. The project will be renovated mainly built in 1929, this 6-storey school building, and in 1962 built, 2-storey new part of the interior, the house technology as well as the older wing of the roof astronomical observatories, with the exception of. Property floor area is 5 752 m2 and a volume of 27 900 m3. Planning Tasks will start in August 2015, the construction works will start in 2017.

Architectural, construction, engineering and inspection services

Varsinais-Suomen sairaanhoitopiirin ky | Published March 12, 2015  -  Deadline April 24, 2015
cpvs
71000000

Southwest Finland Hospital District may request a bid T3 new building for the architectural, structural, HEVAC, electrical, GEO, rail and road area design, technical design of the fire, sprinkler system design, as well as the fixed hospital equipment (KSL), the design of the invitation to tender and the accompanying accordance with the documentation. The new building will be located after the completion of the Southwest Finland hospital pediatrics, obstetrics and gynecology, ear, nose and throat diseases, as well as oral and maxillofacial diseases in medical care and support services activities (imaging, laboratory sampling and Clinical Neurophysiology). The main objective of the project is to build a substitute healthy, safe and functional facilities of the current U-hospital activities, and thus to safeguard the hospital operating activities in the future. The project includes a hospital activities benefit the squares of 21 446 m2. The new building has a total area of ​​about 53 600 m2 and the construction of the cover a surface area of ​​approximately 9 010 m2 The project is being developed in the BIM. To select an architect to work in the principal designer with the exception of the road and rail-planning of the area for which the principal designer of the rail and road area designer. The architect is responsible for the coordination of responsibilities between Specifiers. Architect brings together the above-mentioned other design tasks partners with which to give a joint bid in accordance with the design of the invitation to tender. Note. Participation messages by e-mail to: kiinteistopalvelut@tyks.fi participation notice shall inform the tenderer company name and address, and a contact name, email address and phone number. The tender documents can be downloaded from the project by electronic means from the bank, to which the provider designated contact person supplied the necessary rights. Contact Real Estate Manager Timo Seppälä, tel. +358 407 390 173.

T3 project architectural, structural, HEVAC, electrical, GEO, rail and road area design, fire engineering, sprinkler system design for both fixed and hospital equipment design

Varsinais-Suomen sairaanhoitopiirin ky | Published August 14, 2015
Winner
Granlund Oy
cpvs
71000000

THIS IS A LATE NOTICE! Southwest Finland Health Care District to request an offer T3 new building project, architectural, structural, HEVAC, electrical, GEO, rail and road area planning, fire technical design, the design of the sprinkler system, as well as the design of fixed hospital equipment (KSL), the invitation to tender and the accompanying of the According to documents. The new building will be located after the completion of the management of Southwest Finland hospital paediatrics, obstetrics and gynecology, ear, nose and throat diseases, as well as oral and maxillofacial diseases and in medical support functions (imaging, laboratory sampling and Clinical Neurophysiology). The main objective of the project is to build a substitute healthy, safe and functional facilities of the current U-hospital functions and thus safeguard the hospital operating activities in the future. The project includes hospital operations benefited squares 21.446 m². The new building has a total area of ​​about 53.600 square meters and the construction of the deck covers an area of ​​approximately 9.010 m² Project planning is carried out data modeling. Choose an architect to work in the principal designer with the exception of road and rail planning area for which the principal designer of the rail and road area designer. The architect responsible for the coordination of tasks between chief designer. Architect brings the above-mentioned other design tasks partners with which to give a joint bid in accordance with the design of the invitation to tender.

Raunistula the school's after-school facilities, as well as surfaces and electricity categories

Turun Kaupunki | Published March 9, 2017  -  Deadline March 20, 2017
cpvs

Raunistula school is placed in the former house man's dwelling-minding facilities for approximately 50 children. For the architect and pääsuunnittelutehtävät. This portion of the contract as soon as pictures are required in the summer to carry out the work. Category corrections made in 2018 and 2019. Raunistula school is placed in the former house man's dwelling-minding facilities for approximately 50 children. For the architect and pääsuunnittelutehtävät. This portion of the contract as soon as pictures are required in the summer to carry out the work. Category corrections made in 2018 and 2019.

VHSSP pharmaceutical service väistöparakkien rental contract

Varsinais-Suomen sairaanhoitopiirin ky | Published February 3, 2017  -  Deadline March 10, 2017
cpvs

The construction works must VSSHP Pharmacy, at Old Littoistentie 6, 20540 Turku. Barracks placed in front of the main entrance of the investment according to the drawing of the architect. Access väistöparakkeihin medicinal products to the building's main entrance door should be covered. Väistöparakkien preliminary rental schedule is the beginning of April 2017 for a period of 18 months. The construction works must VSSHP Pharmacy, at Old Littoistentie 6, 20540 Turku. Barracks placed in front of the main entrance of the investment according to the drawing of the architect. Access väistöparakkeihin medicinal products to the building's main entrance door should be covered. Väistöparakkien preliminary rental schedule is the beginning of April 2017 for a period of 18 months.

Consultancy and expert services for 1 November 2018 (target) - 31.10.2021 - one year option

Turun kaupunki | Published June 5, 2018  -  Deadline July 6, 2018
cpvs
79400000

References should show the implementations: - The role and experience of a specialist in public demanding supplies (exceeding the EU threshold, Section 25 Procurement Procurement). - Expert role and experience in public demanding service purchases (exceeding the EU threshold, Section 25 Procurement Procurement). Attachments, etc., are not included in the evaluation. References should show the implementation: - Describe the problem to be investigated - Collect and clean the data needed to solve the problem - Explainable and predictable data analysis - Visualization of the data - Describing, simulating, and testing solving changes Attachments and other material are not included in the evaluation. The references must show the implementations: - definition of machine learning problems based on business requirements. References should show the implementations: - in a multipurpose environment with other Drupal vendors - Drupal 7 - Drupal8 - Migration of online services - Accessibility - - change communication - communication between national and international lobbying and other city activities - event messaging References should show implementations: - firewall environments - network active devices (HP, Cisco, Huawei) - network security implementations Attachments, etc., are not included in the evaluation. The references must show the implementations: Provider must demonstrate experience of at least three service-related deliverables over the last three years in accordance with ITIL processes. References must show the implementations: - The service management experience of extensive service management tasks The appendices, etc., are not included in the evaluation. The references must show the implementations: - an independent insurance broker The references must show the implementation: The references must include the following: - project financing calculations, budgeting, cost accounting - profitability analyzes and economic impact assessments - valuation, VAT advice References should show the implementations: Implementation Projects References should include the implementation of: - SOA Implementation - MSA Implementation - JHS179 Implementation - Service Bus / Integration Platform - Technology Architecture References should demonstrate implementations: - Development of functions and structures - Service structure analyzes and design - Planning of operation and process architectures - analysis and development - development of multichannel customer service and its processes References should include the implementation of: - service production process - Implementation of business strategies - Measurement of the effectiveness of the objectives of the strategy - Planning and implementation of the strategy implementation The references should include the implementation of: - the mandate, its purpose, content and scope, - the date of implementation and the stages of the project, (managers) and project management (agile or traditional) References should show the implementations: - Definition work - Test design - Creating and driving the test - Reporting the results - Analyzing the errors References should show the implementations : - Withdrawing total projects with a large IT share. - Understanding IT technologies and integrations, as well as understanding the technology architecture. References should show implementations: - Withdrawing total projects with a large IT share and using a project model based on the Prince2 method - Withdrawing total projects with a large IT share. - The IT project manager must understand what the overall architecture means and know how to apply it - Understanding IT technologies and integrations, and understanding the technology architecture must become one. - Implementation of Java implementations - Implementation of the SOA (Service-Oriented Architecture) implementation - Java Implementations Implementation: - Data Vault 2.0 Implementation - Data warehouse and Concept Design Implementation References should show the implementations: - Successful development and use projects of the overall architecture - SOA Implementation - MSA Implementation - Implementation based on JHS179 Attachments, etc., are not included in the evaluation. The references must show the implementations: - Implementation projects for systems based on micro-service architecture or References must include implementation, consultancy or training activities: • Expert work on administrative security

T3 project, architectural, structural, HEVAC, electrical, GEO, rail and road area design, fire engineering, sprinkler system design, as well as the fixed hospital equipment design

Varsinais-Suomen sairaanhoitopiirin ky | Published March 9, 2015  -  Deadline April 24, 2015
cpvs
71000000

Southwest Finland Hospital District may request a bid T3 new building for the architectural, structural, HEVAC, electrical, GEO, rail and road area design, technical design of the fire, sprinkler system design as well as the fixed hospital equipment (KSL), the design of the invitation to tender and the accompanying accordance with the documentation. The new building will be located after the completion of the Southwest Finland hospital pediatrics, obstetrics and gynecology, ear, nose and throat diseases, as well as oral and maxillofacial diseases in medical care and support services activities (imaging, laboratory sampling and Clinical Neurophysiology). The main objective of the project is to build a substitute healthy, safe and functional facilities of the current U-hospital activities, and thus to safeguard the hospital operating activities in the future. The new building has a total area of ​​about 53,600 square meters and the construction of the cover a surface area of ​​about 9,010 sq ft Project planning is carried out data modeling. Architect brings together the above-mentioned other design tasks partners with which to give a joint bid in accordance with the design of the invitation to tender. NOTE !! Participation messages by e-mail to: kiinteistopalvelut@tyks.fi participation notice shall inform the tenderer company name and address, and a contact name, email address and phone number. The tender documents can be downloaded from the project by electronic means from the bank, to which the provider designated contact person supplied the necessary rights.

Architectural, construction, engineering and inspection services

Turun Plalvelutilat Oy | Published June 4, 2015
Winner
Arkkitehtitoimisto Jarmo Saarinen Oy
cpvs
71000000

The project development architectural design.

Architectural, construction, engineering and inspection services

Varsinais-Suomen sairaanhoitopiirin ky | Published April 23, 2015  -  Deadline June 5, 2015
cpvs
71000000

In which the acquisition of the Hospital District of Southwest Finland, as a rule, renovation projects and projects related to construction management, construction supervision tasks, HVAC work control tasks, as well as electrical work monitoring missions. Southwest Finland Health Care District manages projects in construction management and construction project management task list HJR12 (RT 10-11107), the. Hospital District to use tasks aided by the developer consultants, construction supervisors, HVAC work supervisors and electrical work supervisors. The contract is divided into sections (construction consultant / construction supervisor / HVAC work supervisor / electrical work supervisor). Bidders can bid for one, several or all sub-areas. This is a framework agreement, which is elected every part of the area for at least three (3) suppliers of a framework agreement, unless acceptable offers no less, and a maximum of five (5) Framework agreement suppliers. Note. Participation messages by e-mail to: kiinteistopalvelut@tyks.fi participation notice shall inform the tenderer company name and address, and a contact name, email address and phone number. The tender documents will be forwarded by e-mail. Contact Marika transfer, tel. +358 503 831 280.