Public tenders for architect, architecture in Oulu Finland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural, construction, engineering and inspection services

Liikelaitos Oulun Tilakeskus | Published April 20, 2016
Winner
Vauhtiviiva Oy
cpvs
71000000

State Enterprise Centre of Oulu State applied to consultants (PS / ARK) Framework partners in public refurbishment, maintenance and replacement investment projects pääsuunnittelijajohtoisesti KVS-service design, including architectural, structural, electrification and landscaping design.

In addition, the tasks may be associated with kitchen, geo- and transport planning, as well as acoustic and audio-visual design.

Architectural, construction, engineering and inspection services

Pohjois-Pohjanmaan elinkeino-, liikenne- ja ympäristökeskus | Published May 20, 2016  -  Deadline June 22, 2016
cpvs

Architectural, construction, engineering and inspection services

University of Oulu main and architectural design

Oulun yliopisto | Published February 29, 2016  -  Deadline March 21, 2016
cpvs
71200000

University of Oulu main and architectural design services under this invitation to tender

NOTE! Notification information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. Direct link to the notification of additional information can be found here Hilma-notification.

Architectural, construction, engineering and inspection services

Pohjois-Pohjanmaan elinkeino-, liikenne- ja ympäristökeskus – Liikenne ja infrastruktuuri -vastuualue | Published January 15, 2016  -  Deadline February 15, 2016
cpvs
71000000

The design task is to draw up a road law referred to in the final engineering plan (TS) of the highway between 4 road section Clock Räinänperä the necessary information, yksityistie- and liittymäjärjestelyineen. The plan must meet the requirements of the road at road plan. The design property is located in Haukipudas at Oulu and Ii municipalities in the region. Current expressway converted into a motorway of about 8 km trip, and with median ohituskaistieksi approximately 10 km trip. This task also includes a telematics master plan update. Terrain model and preliminary ground surveys have been made and are available in addition to the earlier construction phase ground surveys. For the selected designer include any additional measurements and -pohjatutkimusten programming. The project includes. the design of bridges, off-road model-based noise calculation, noise reduction measures, road lighting, as well as telematics planning.

Architectural, construction, engineering and inspection services

Liikelaitos Oulun Tilakeskus | Published October 29, 2015  -  Deadline December 16, 2015
cpvs
71000000

State Enterprise Centre of Oulu State owns, maintains and acquires the City of Oulu in different administrative sectors premises. State Enterprise Centre of Oulu State seeking consulting firms (PS / ARK) Framework Agreement partners in public refurbishment, maintenance and replacement investment projects pääsuunnittelijajohtoisesti KVS-design service, including architectural, structural, electrification and green design.

Architectural, construction, engineering and inspection services

Pohjois-Pohjanmaan elinkeino-, liikenne- ja ympäristökeskus – Liikenne ja infrastruktuuri -vastuualue | Published November 18, 2015  -  Deadline December 17, 2015
cpvs
71000000

The contract includes the design of new bridges, repair design, bridge inspection plans, other unspecified expert services related to bridges, bridges, special audits, inspections and diving jetty structures planning during the period 2016-2018. The candidate's participation relates to all of the above types of plans and tasks. In addition, the Framework Agreement is one (1) year from the stock options the opportunity (1.1.2019-31.12.2019). The use of stock options of the year requires the written consent of both parties. The use of stock options of the year shall be adopted 09.30.2018. During the term of the framework agreement in respect of individual orders may also be funded by the provincial ELY Centres territories unions, cities and municipalities. Framework agreement for three (3) with the consultant. The contract area is the Northern Ostrobothnia ELY Centre area. The content of the Framework Agreement is defined in more detail in the tender documents.

Architectural, construction, engineering and inspection services

Pohjois-Pohjanmaan elinkeino-, liikenne- ja ympäristökeskus – Ympäristö ja luonnonvarat -vastuualue | Published November 20, 2015  -  Deadline December 21, 2015
cpvs
71000000

The contract includes the design of water constructions and -kunnosten during the years 2016-2018. The framework agreement includes. The following sub-plans preparation: 1) The water structures design. - The bottom dams, - regulation of dams, - earth dams - water conservation structures (wetlands, overland flow fields, etc.). 2) the development by better regulation. - Modeling. 3) permit application design. 4) Vesistökunnostusten design. - Lake renovations - renovations to the power of water. 5) The functions of environmental assessments of infrastructure projects related to spatial data and literature, as well as the small field work related. 6) studies and their design related to flood risk management. 7) Impact Evaluations. Em. Planning to excercised measurements. The services provided by the operator Framework agreement must cover all of the above. Areas. This framework does not include the extensive nature studies and EIA procedures. In addition, the Framework Agreement is one (1) year from the stock options the opportunity (01.01.2019 - 31.12.2019). The use of stock options of the year requires the written consent of both parties. The use of stock options of the year shall be adopted 09.30.2018. Framework agreement for three (3) with the consultant. The contract area is Northern Ostrobothnia, Kainuu and Lapland ELY Centre area. The content of the Framework Agreement is defined in more detail in the tender documents.

Urban planning and landscape architectural services

Oulun kaupunki | Published December 12, 2015
Winner
WSP Finland Oy
cpvs
71400000

Municipal general and building a framework agreement. The Framework Agreement contains the following tasks: traffic and transport infrastructure and general construction planning; environment, general and building design; drainage design; bridge design; lighting design and lighting, electrical engineering; off-road measurements and soil surveys the work of design; geotechnical engineering; transport, environment, nature, landscape and cultural environmental studies; construction services design and other design expert tasks. The framework agreement applies to the entire city of Oulu but the bulk of the orders will be competitions path to unit.

Urban planning and landscape architectural services

Oulun kaupunki | Published September 23, 2015  -  Deadline October 20, 2015
cpvs
71400000

General and town planning framework includes land use planning, consultancy services, such as: - general and layout-level land-use planning, - the preparation of land use sketches and development plans, - local master plans and kaavarunkotarkasteluja, - master plans and detailed plan changes - block and area plans - visualization of plans and 3D modeling - the design that serve surveys and land-use planning expert missions. The framework agreement applies to the entire city of Oulu, but the bulk of the orders comes to bid entities.

Architectural, construction, engineering and inspection services

Pohjois-Pohjanmaan elinkeino-, liikenne- ja ympäristökeskus – Liikenne ja infrastruktuuri -vastuualue | Published June 3, 2015  -  Deadline July 2, 2015
cpvs
71000000

The framework agreement is a role player in road safety work. The operator provides information and guidance to provincial level municipalities, as well as feedback from the municipalities at the provincial level. Toimijatyö are the cities and municipalities in Northern Ostrobothnia and Kainuu region. The main goal of traffic safety work actor job is to support road safety work of local and regional actors so that the municipalities have to work actively to achieve the road safety objectives. In addition, the Framework Agreement is one (1) year from the stock options the opportunity (1.1.2019-31.12.2019). The use of stock options of the year requires the written consent of both parties. The use of stock options of the year deciding on 09/30/2018. Framework agreement for three (3) with the service provider. The contract area is the Northern Ostrobothnia and Kainuu provincial area. The content of the Framework Agreement is defined in more detail in the tender documents.

Architectural, construction, engineering and inspection services

Senaatti-kiinteistöt | Published June 17, 2015  -  Deadline September 30, 2015
cpvs
71000000

Senate Properties in Northern Finland selects Construction Services Framework partners for the period 2016-2019 consultants: construction consultant, architectural design, structural design, HVAC design, electrical design.

Urban planning and landscape architectural services

Oulun kaupunki | Published May 20, 2015  -  Deadline June 17, 2015
cpvs
71400000

Municipal general and building a framework agreement contains the following tasks: - transport and transport infrastructure and general construction planning, - environmental and general engineering, - drainage design, - bridge design - lighting design and lighting, electrical engineering, - off-road measurements and soil studies, job design, - geotechnical engineering - transport, environment, nature, landscape and cultural environmental studies, - construction service designer and - other expert on the design tasks. The framework agreement applies to the entire city of Oulu but the bulk of the orders will be competitions path to unit.

Architectural, construction, engineering and inspection services

Liikennevirasto | Published May 16, 2015  -  Deadline June 15, 2015
cpvs
71000000

The task is to Highway 8 road investments necessary to Pyhäjoen nuclear power plant quality control of the construction of structures, implemented under the project, as well as participation in the project construction management. The assignment is mostly covered by the Finnish Transport Agency and partly by the municipalities destinations. Highway 8 to the improvement of provisionally included, inter alia, Pyhäjoen the main subscription and the Holy River south branch and north branch of the river bridges, restoration, improvement of the level of subscriptions Raahe paragraph, as well as highway and railway overpass widening, with median lane pairs between Pattijoki-Revonlahti and the Revonlahti Lapland Fabric, Lapland fabric into the national highway and railway overpass widening and 86 kb interface multiplexer. In addition, the project includes road lighting and game fences, as well as built-up areas the improvement of access and non-motorized traffic arrangements. The project consists of several separate objects that initially tendered in a matter of a separate contract package. The measures have been drawn up ready for road and building plans. The project may involve the construction of buildings of measures including a separate authority to the project "Fennovoima road links to" related to highway 8 and a new Hanhikivi a link from the interface and the vicinity of the interface. The assignment includes: - preparation of the construction of cooperation with the customer, - the quality control and quality reporting of the project, - Participation in co-operation with the client of the project construction management, - contract preparation reception - guarantee simultaneous operation (if any).

Architectural, construction, engineering and inspection services

Oulun kaupunki | Published February 12, 2015
Winner
WSP Finland Oy
cpvs
71000000, 73000000

State Enterprise Centre of Oulu Status tenders for the partners in the project development and / or control offices in the city's investment and modernization programs as well as maintenance repair projects.

Architectural, construction, engineering and inspection services

Liikennevirasto | Published May 16, 2015  -  Deadline June 15, 2015
cpvs
71000000

The task is to Highway 22 Oulu and Kajaani Vartius quality control of the construction of structures, implemented under the project, as well as participation in the project construction management. The assignment is mostly covered by the Finnish Transport Agency and partly by the City of Oulu and other municipalities to. The project actions will focus on the connection interval of Oulu side of the head, which improves the highway between 22 Joutsentie-Iinatti. In addition, the size of the connection can be made between the small-scale improvement measures the number of different locations. The most important measures included in the project include. - Current highway will be widened with median 2 + 2 road Joutsentie-Crotch fabric interchange bridge. - Branch Fabric crossing the bridge will be built at highway ramps and ramps at the ends of the drop in the roundabouts. - Branch of fabric between the intersection of the bridge and the highway to improve access Sääskensuontien 1 + 1 lanes median road. - Improving the interfaces and built kääntymiskaistoja. - Build bridges and widening of existing bridges. - Implementation of noise protection measures. The assignment includes: - preparation of the construction of cooperation with the customer, - the quality control and quality reporting of the project, - Participation in co-operation with the client of the project construction management, - contract preparation reception - guarantee simultaneous operation (if any).

Future Hospital 2030 Intellectual and Developmental Disabilities Service Expertise - Architectural Design

Pohjois-Pohjanmaan sairaanhoitopiirin kuntayhtymä | Published March 2, 2017  -  Deadline March 20, 2017
cpvs
71000000

Normal head and in addition to the execution of tasks related to architectural design of subscribers' expectations provider are: - experience and professionalism - commitment - reliability - flexibility - innovation and continuous improvement - the interaction and cooperative Subscriber objectives of the design are: - the functionality of the design - the subscriber targets implement plans - feasible and correct subscriber acquisition plans is the Northern Ostrobothnia Hospital District Federation of Municipalities. Normal head and in addition to the execution of tasks related to architectural design of subscribers' expectations provider are: - experience and professionalism - commitment - reliability - flexibility - innovation and continuous improvement - the interaction and cooperative Subscriber objectives of the design are: - the functionality of the design - the subscriber targets implement plans - feasible and correct plans - the use of modeling a wide range of

Rovaniemi Hallituskatu modification; The main design (PS) and the architectural design (ARK)

Senaatti-kiinteistöt | Published April 7, 2017
cpvs
71000000

Board tender Rovaniemi Street modification (A13414) including a master engineering design (PS) and the architectural design (ARK). From 2 has been prepared project plan that are completed 06.06.2016 and 25.11.2016. The property is located in the center of Rovaniemi, Hallituskatu 1-5, 96100 Rovaniemi. The building consists of a plurality of structural elements at different times. Parts 11 and 12 have been completed in 1950. Agency The house is made renovations on several occasions between 1999 -2010. Parts 11 and 12 are harvested mainly in 2006. The project carried out a thorough renovation and alteration near building parts 11 and 12. The aim is to build a modern working environment for the National Land Survey, the Tax Administration, debt recovery and the Criminal Sanctions Agency. The project plan 06/06/2016 acclimatised to the NLS, PTO and the Criminal Sanctions Agency projects. Tax Administration Project Plan dated 25/11/2016. Board tender Rovaniemi Street modification (A13414) including a master engineering design (PS) and the architectural design (ARK). From 2 has been prepared project plan that are completed 06.06.2016 and 25.11.2016. The property is located in the center of Rovaniemi, Hallituskatu 1-5, 96100 Rovaniemi. The building consists of a plurality of structural elements at different times. Parts 11 and 12 have been completed in 1950. Agency The house is made renovations on several occasions between 1999 -2010. Parts 11 and 12 are harvested mainly in 2006. The project carried out a thorough renovation and alteration near building parts 11 and 12. The aim is to build a modern working environment for the National Land Survey, the Tax Administration, debt recovery and the Criminal Sanctions Agency. The project plan 06/06/2016 acclimatised to the NLS, PTO and the Criminal Sanctions Agency projects. Tax Administration Project Plan dated 25/11/2016.

Rovaniemi Hallituskatu modification; The main design (PS) and the architectural design (ARK)

Senaatti-kiinteistöt | Published April 5, 2017  -  Deadline April 20, 2017
cpvs
71000000

Board tender Rovaniemi Street modification (A13414) including a master engineering design (PS) and the architectural design (ARK). From 2 has been prepared project plan that are completed 06.06.2016 and 25.11.2016. The property is located in the center of Rovaniemi, Hallituskatu 1-5, 96100 Rovaniemi. The building consists of a plurality of structural elements at different times. Parts 11 and 12 have been completed in 1950. Agency The house is made renovations on several occasions between 1999 -2010. Parts 11 and 12 are harvested mainly in 2006. The project carried out a thorough renovation and alteration near building parts 11 and 12. The aim is to build a modern working environment for the National Land Survey, the Tax Administration, debt recovery and the Criminal Sanctions Agency. The project plan 06/06/2016 acclimatised to the NLS, PTO and the Criminal Sanctions Agency projects. Tax Administration Project Plan dated 25/11/2016. Board tender Rovaniemi Street modification (A13414) including a master engineering design (PS) and the architectural design (ARK). From 2 has been prepared project plan that are completed 06.06.2016 and 25.11.2016. The property is located in the center of Rovaniemi, Hallituskatu 1-5, 96100 Rovaniemi. The building consists of a plurality of structural elements at different times. Parts 11 and 12 have been completed in 1950. Agency The house is made renovations on several occasions between 1999 -2010. Parts 11 and 12 are harvested mainly in 2006. The project carried out a thorough renovation and alteration near building parts 11 and 12. The aim is to build a modern working environment for the National Land Survey, the Tax Administration, debt recovery and the Criminal Sanctions Agency. The project plan 06/06/2016 acclimatised to the NLS, PTO and the Criminal Sanctions Agency projects. Tax Administration Project Plan dated 25/11/2016.

Architectural, construction, engineering and inspection services

Pohjois-Pohjanmaan elinkeino-, liikenne- ja ympäristökeskus – Liikenne ja infrastruktuuri -vastuualue | Published November 17, 2015  -  Deadline December 17, 2015
cpvs
71000000

The contract includes civil engineering and construction of small road maintenance projects and the acquisition of professional services related during the years 2016-2018. The framework agreement includes. The following sub-plans of the Finnish Transport Agency's Code of Conduct preparation: - (incl. the subways and siltakaivantojen pumping stations design sähkösuunnitteluineen) tietekninen design, - geotechnical engineering, - - geometric design, drainage design, - traffic planning, - street lighting and electrical engineering design, - environmental planning, - to conduct off-road model-based noise calculations , - noise hedges design (noise barriers, noise handrails) incl. structural design, - retaining walls design mL. The structural design. In addition, the framework includes erillistehtäviä related to road planning mm. geoasiantuntijatehtävät as well as other related to road planning expert missions. The candidate's participation relates to all of the above types of plans and tasks. In addition, the Framework Agreement is one (1) year from the stock options the opportunity (1.1.2019-31.12.2019). The use of stock options of the year requires the written consent of both parties. The use of stock options of the year shall be adopted 09.30.2018. Framework agreement for four (4) with the consultant. During the term of the framework agreement in respect of individual orders may also be funded by the provincial ELY Centres territories unions, cities and municipalities. The content of the Framework Agreement is defined in more detail in the tender documents.

Future Hospital 2030 Center for the Development of Vulnerability - Architectural Design

Pohjois-Pohjanmaan sairaanhoitopiirin kuntayhtymä | Published August 25, 2017
cpvs
71000000

This competition was awarded to the Future Hospital OYS 2030 - Architectural Services for the Center for the Development of Vulnerability. The competition was negotiated. The call for participation and the initial call for tenders were published on 12 April 2017 and the applications for participation had to be submitted by 21.4.2017 at 12:00. By the deadline, two applications for participation were submitted to the project with the eligibility criteria specified, with which they were consulted and who were sent a call for tenders. Bids had to be submitted by 21 April 2017 at 12:00. This competition was awarded to the Future Hospital OYS 2030 - Architectural Services for the Center for the Development of Vulnerability. The competition was negotiated.