Public tenders for architect, architecture in Karvia Finland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Design Offer architectural and main design, Karvian comprehensive school renovation and extension

Karvian kunta | Published June 26, 2015  -  Deadline August 31, 2015
cpvs
71200000

Municipal Karvian Technical Board asks the design offer the architect drawing up plans for serving as chief designer Karvian comprehensive school renovation and extension concerned. This project aims to design a connection with the current middle school expansion, which allows for pre-primary and primary school education in connection with the transition to the current middle school and thereby provide the comprehensive formed, which serves the entire municipality Karvian educational activities. The extension comes in addition to the current middle school facilities to plan the necessary status changes in order to obtain their holdings of the future level of comprehensive and functionally effective. Also, the required yard and landscaping design includes design task. The entire construction project total cost estimate of about 3.4 million. EUR (VAT 0%) furniture and its surrounding land. The estimated area of ​​the project is new construction of about 800 brm² and undergoing reorganization in respect of the premises around 1200 brm².

Invitation to tender in architectural design, main and structural design, Karvia performing arts stadium

Karvian kunta | Published November 26, 2015  -  Deadline December 10, 2015
cpvs
71200000

The acquired: Overall Design of the Tender Offer are requested following the design of: - Architectural and main design, - structure planning. Background information on the project: a condition for the final implementation of the project the municipal government ordered the obtaining investment subsidy. Design of Phase 2 is implemented investment financing if the project has been received and Karvia city council has approved an investment decision. Content of the project design in general: Project engineering jaettaan the following parts: - Architectural design - main design (Architect acts as the main designer), - Structural design - Geosuunnittelu (ordered separately if the project is implemented), - HVAC design (ordered separately if the project takes place). The project is the design of Kant's primary school environment covered performing arts stadium construction 450 to the viewer as well as a partially covered (n.6 * 10m) scene mode + dressing performers in the vicinity of the stage space. The customer is hoped that the stadium could be possible to design / build Skanssi fortress resembling (or, at least partly) if it is possible economically, functionally and structurally. Grandstands and näyttämörakennelmissa will allocate the sound and lighting technology, as well as to their use / management. 120 to the parking lot) and the rest of the traffic arrangement design. Spectator planning should particularly take into consideration the following issues: - Would you believe the project buildings must be suitable for the environment of the area - Designer should be aware that the existing building / facilities are easily planned exploitable auditorium / performance space activities, - Cardinal points: The sun does not disturb viewers and performers, - Noise: stadium should be located so that no external noise to disturb performances. Throughout the initial total cost estimate for the construction project is around EUR 250 000 (VAT 0%)

CORRECTION NOTICE: gooseberry yhtenäiskoulu RENOVATION AND EXPANSION, Design RFQ (structural, HEVAC and electrical engineering)

Karvian kunta | Published January 5, 2016  -  Deadline January 12, 2016
cpvs
71320000

The offer period for submission: the following changes have been made 22.12.2015 published in the invitation to tender allocates more time for the delivery period and the offer of a new deal last delivery date is Tuesday, 12/01/2016 klo.15.00 Additional questions: All questions and answers shall be communicated to all bidders by e-mail no later than 01/08/2016 klo.10.00 date . Design of the Tender Offer are requested following the design of: 1. Architecture 2. From design to HVAC planning (including cooling) 3. Electrical planning takes place for each of the foregoing design of its own tender. Provider may request the tender documents to the municipality Karvia municipal building master by e-mail at: jaakko.kallioniemi@karvia.fi provider receives the response message a web link and password for the project to the bank from which the tender documents can be downloaded to their computers. If the bidder wishes to tender the documents in paper form, they can be ordered independently it uses a copy of the plant. Background information about the project: On the basis of Karvia In 2014 the network of schools report it was decided that the existing four elementary schools will be closed in 2017 and the current middle school building undergoes expansion, which allows primary schools - pre-school education and the transition to lower secondary school (comprehensive school) premises. To allow for play and exercise to be built comprehensive school courtyard area and a playground in the nearby sports facilities, which will also serve the residents outside during the school activities. The school building was completed in 1967 and it has undergone extensive renovation in 1995-1997. The project is carried out in the municipality as a normal investment project. Design-sector task definitions: Structural design: structural designer must have at least the qualifications for demanding structural engineering tasks. The structural engineer task included RAK12 RT 10-11128 entries DK-do list tasks not included in the agreement strikeout. The remaining (non-marking) shall be equipped with E-marking is carried out, if necessary, on unit or in a separate offer based on. In addition to the above electrical design included the following tasks: --term construction work starting authorities and participation in follow-up meetings, - the structural design of buildings outside the building, - a maintenance manual with regard to the fulfillment of their own design in the field of information, - taking into account occupational safety of the design of Government Decree 205/2009. in accordance with: - the transfer of changes made to the construction site implementation plan documents, - the recording of the final documents by electronic means to the subscriber, - consideration of the issues presented in the project plan design. 2. HVAC Design: HVAC designer should have at least the qualifications for demanding HVAC design tasks. Tasks HVAC designer included TATE12 RT 10-11129 DK lines Task list includes tasks not included in the agreement is crossed out, and with the task list, E-marked separately on-demand tasks are performed when the unit rate or a separate offer based on. Designed the system scope is shown in TATE12 RT 10-11129 attachments paragraph 1, H511 elementary schools and high schools default extent described in the following mutatis mutandis: - Rainwater systems (courtyard) are excluded HVAC design tasks - Ventilation systems include HVAC -suunnittelutehtäviin, - Air conditioning, refrigeration (G5400) includes HVAC -suunnittelutehtäviin - Refrigerating systems include HVAC design tasks (kitchen refrigeration equipment). In addition to the above HVAC design included the following tasks: --term construction work starting authorities and participation in follow-up meetings,

Gooseberry yhtenäiskoulu RENOVATION AND EXPANSION, Design RFQ (structural, HEVAC and electrical engineering)

Karvian kunta | Published December 22, 2015  -  Deadline January 7, 2016
cpvs
71320000

Design of the Tender Offer are requested following the design of: 1. Architecture 2. From design to HVAC planning (including cooling) 3. Electrical planning takes place for each of the foregoing design of its own tender. Provider may request the tender documents to the municipality Karvia municipal building master by e-mail at: jaakko.kallioniemi@karvia.fi provider receives the response message a web link and password for the project to the bank from which the tender documents can be downloaded to their computers. If the bidder wishes to tender the documents in paper form, they can be ordered independently it uses a copy of the plant. Background information about the project: On the basis of Karvia In 2014 the network of schools report it was decided that the existing four elementary schools will be closed in 2017 and the current middle school building undergoes expansion, which allows primary schools - pre-school education and the transition to lower secondary school (comprehensive school) premises. To allow for play and exercise to be built comprehensive school courtyard area and a playground in the nearby sports facilities, which will also serve the residents outside during the school activities. The school building was completed in 1967 and it has undergone extensive renovation in 1995-1997. The project is carried out in the municipality as a normal investment project. Design-sector task definitions: Structural design: structural designer must have at least the qualifications for demanding structural engineering tasks. The structural engineer task included RAK12 RT 10-11128 entries DK-do list tasks not included in the agreement strikeout. The remaining (non-marking) shall be equipped with E-marking is carried out, if necessary, on unit or in a separate offer based on. In addition to the above electrical design included the following tasks: --term construction work starting authorities and participation in follow-up meetings, - the structural design of buildings outside the building, - a maintenance manual with regard to the fulfillment of their own design in the field of information, - taking into account occupational safety of the design of Government Decree 205/2009. in accordance with: - the transfer of changes made to the construction site implementation plan documents, - the recording of the final documents by electronic means to the subscriber, - consideration of the issues presented in the project plan design. 2. HVAC Design: HVAC designer should have at least the qualifications for demanding HVAC design tasks. Tasks HVAC designer included TATE12 RT 10-11129 DK lines Task list includes tasks not included in the agreement is crossed out, and with the task list, E-marked separately on-demand tasks are performed when the unit rate or a separate offer based on. Designed the system scope is shown in TATE12 RT 10-11129 attachments paragraph 1, H511 elementary schools and high schools default extent described in the following mutatis mutandis: - Rainwater systems (courtyard) are excluded HVAC design tasks - Ventilation systems include HVAC -suunnittelutehtäviin, - Air conditioning, refrigeration (G5400) includes HVAC -suunnittelutehtäviin - Refrigerating systems include HVAC design tasks (kitchen refrigeration equipment). In addition to the above HVAC design included the following tasks: --term construction work starting authorities and participation in follow-up meetings,
  • 1