Public tenders for architect, architecture in Grenaa Denmark

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural, construction, engineering and inspection services

Norddjurs Kommune | Published March 24, 2017  -  Deadline April 21, 2017
cpvs
71000000

Grenada Sports Center has developed steadily and now need more space and roominess. This together with the need to replace the roof on the east side, is the basis for this contest.

Architectural, construction, engineering and inspection services

Grenaa Varmeværk A.m.b.A. | Published November 28, 2015
cpvs
71000000

Totalrådgivning ifm opførelse af nyt biomassefyret fjernvarmeværk i Grenaa.

Architectural, construction, engineering and inspection services

Norddjurs Kommune | Published August 11, 2015
Winner
Arkitektfirmaet Kjaer & Richter A/S
cpvs
71000000

Norddjurs want to contract with one counselor to assume the role of consultant on all projects under planning, design and construction phases of the projects. The assignment includes total advice under ABR89 and performance specifications Building and Planning 2012 and Work Coordination November 2012 and includes the following services: - Building Program, conceptual design, preliminary project, project, detailed design, procurement, project monitoring, technical inspection, construction management and health and safety coordination. - Process management / process advice in connection with involvement of user groups, discussions with management, authorities, etc. In the total budget must be given all the costs associated with the construction, including resettlement, loose fixtures, disability equipment, restoration of outdoor areas, environmental sanitation in connection with the possible degradation. The projects covered by the invitation: Collection of Jutland school's current Fjellerup- and Stenvad departments on Voldby School: The contract includes comprehensive advice in rebuilding / renovation and degradation associated with collection of Jutland school departments in Fjellerup and Stenvad on Voldby School. 3100 m2 premises at Voldby School. There are a total budget of 14.5 million DKK. Project launched in May 2015 - official opening in June 2017. New construction and renovation of Jutland School Department 'Damgården' in Orum: The contract includes complete advice in the extension, modification and degradation of rooms at Damgården in Orum. 9,000,000 DKK. Project launched in May 2015 - official opening in June 2017. New construction and renovation of Jutland School main building Djursvej in Orum: 1 400 m2 and make a conversion of 1 750 m2. 30,250,000 DKK. Project launched in April 2016 - inauguration in August 2018. Construction on Orum School include replacing pavilions: The contract includes total advice for extension and conversion of Orum School. 9.5 million DKK.

Architectural, construction, engineering and inspection services

Grenaa Varmeværk A.m.b.A. | Published July 10, 2015  -  Deadline August 21, 2015
cpvs
71000000

The new CHP plant should be ready for commissioning 31.12.2017. Offering comprises a total of advice in connection with the establishment of a biomass-fired boiler plant of 30 -36 MW consisting of 2 x 15 MW or 2 x 18 MW boiler plants and 2 MW absorp- tion heat pump and common wood chips silo and utilities (electricity, compressed air, ash handling), however, divided as operation of the plants are independent of each other. Based on the preliminary consideration of plant design, expected the district heating system that includes the following elements, the list is not exhaustive and is subject to changes in non-negligible extent in the further planning: Construction prepared for retrofitting SNCR system for NOX reduction . SRO, emission measuring equipment and UPS systems. Transmission Line. Service Building sections with wood laboratory, control, welfare facility with kitchen, meeting room and workshop / warehouse. The current supplier delivered in 2012 106.000 MWh where a normal corresponds to a delivery of 109,000 MWh heat to Grenaa Varmeværk, and fails the delivery must be provided an alternative heat supply. The work must support Grenaa Heating folk objective of flexibility, high security and low production costs.
  • 1