Call +44 800 9755 164

Public tenders for architect, architecture in Wetzlar Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Fachplanung "architecture" for the basic exemplary restoration of the 3-field sports hall at the Eichendorff school in 35576 Wetzlar

Kreisausschuss des Lahn-Dill-Kreises | Published January 18, 2017
cpvs
71200000

Architectural Work

Handwerkskammer Wiesbaden | Published December 28, 2016
cpvs
71320000

Architectural and related services

Kreisausschuss des Lahn-Dill-Kreise_FD Technisches Gebäudemanagement-Schulen | Published March 30, 2017
Winner
Schmees Wagner Architekten BDA
cpvs
71200000

The number of students is a school year, on average, 1,050 students in up to 45 classes.

Due to the successful destination planning, ENTIRE provision of LPH 1-3 is not required.

The central complex of the Johannes Gutenberg (Gesamtschule) in Ehringhausen consists of the 3-class gechossigen building with the 1-tailed storey natural science and Polytechnik- / Administration tracts.

625 m 2 BGF done.

The number of students at the Johannes Gutenberg School is a school year, on average, 1,050 students in up to 45 classes.

The science wing was refurbished in 2012 found.

In 2016, the replacement of heating Central took place.

However, the class buildings and Polytechnik- / administrative wing are still fully structurally, home technology, fire protection and energy renovation.

The rehabilitation needs and take place under sensitive consideration of the current school operation in financing and construction phases.

The ground floor is to be adjusted by reorganizing and restructuring of classrooms, workshops, administration and an extension of the assembly hall the revised organizational needs of the school.

For the Disabled tapping the installation of an elevator is planned.

This amount for the next phase of construction EUR 3 000 000 gross and includes the following measures:

2017 planning and construction planning application Gesamtsanierung

2017/2018 renovation roof areas and cultivation Aula

2018/2019 renovation EC Polytechnic

In the other phases following measures are planned:

2019/2020 EC remediation management

2020/2023 redevelopment ground, 1st, 2nd floor class building

EUR 10 million gross.

Due to the previously announced target planning an ENTIRE provision of the power image from the work phases 1-3 will not be necessary.

For budgetary reasons, a gradual, or sections commissioning of services is carried out.

Architectural and related services

Kreisausschuss des Lahn-Dill-Kreise – FD Technisches Gebäudemanagement-Schulen | Published November 26, 2016  -  Deadline December 23, 2016
cpvs
71200000

The number of students is 1050 students in up to 45 classes per school year on average.

Due to the successful destination planning, an ENTIRE provision of LPH 1-3 is not required.

The central building complex of Johannes Gutenberg (Gesamtschule) in Ehringshausen consists of the 3-gechossigen class building with the connected 1-storey natural science and Polytechnik- / administrative districts.

625 m 2 BGF done.

The number of pupils at the Johannes Gutenberg School has 1050 students in up to 45 classes per school year on average.

The science wing was refurbished in 2012 Design.

In 2016, the renovation of the heating headquarters took place.

However, the class of the building and Polytechnik- / administrative offices are still comprising structurally, technically house, fire protection and energy renovation.

The restoration must be carried out under and sensitive consideration of the current school operation in financing and construction phases.

The ground floor is to be adjusted by reorganizing and restructuring of the classrooms, the workshops, the management and cultivation of the Aula the amended organizational needs of the school.

For the disabled develop the installation of an elevator is planned.

This amount for the next phase of construction 3 million EUR gross and includes the following measures:

2017 planning and construction planning application total renovation;

2017/2018 Restoration roof areas and cultivation hall;

2018/2019 Restoration EC Polytechnic.

In the other phases following measures are planned:

2019/2020 Restoration EC management;

2020/2023 Restoration ground, 1st, 2nd floor class building.

10 million EUR gross.

Due to the previously announced target planning an ENTIRE provision of the power of the image of the work phases 1-3 will not be required.

For budgetary reasons, there is a gradual, or sections, commissioning of services.

Architectural and related services

Lahn-Dill-Kreis, vertreten durch den Kreisausschuss | Published November 4, 2015
Winner
Bewerbergemeinschaft Keul + Müller Architekten/Bergmann + Müller Architketen + Ing.
cpvs
71200000

The Alexander von Humboldt School (Secondary School) in Asslar was built in the 70s in reinforced concrete frame construction with curtain-aggregate concrete façade. The school covers a gross floor area of ​​approximately 13 500 m3 on 3 floors. The number of pupils at the Alexander von Humboldt-school is on average about 650 Pupil / school year. In summer 2009, extensive studies have been conducted with respect to the static, energy, functional and fire protection state of the building. These deficiencies have been identified that required immediate implementation of rehabilitation and modernization measures mandatory. In 2010, a planning application was submitted for the fire protection renovation. Since up to now the following measures were implemented: - laying of the staff room; - Setting up of teachers bases; - Fire wall retrofit EC; - Restoration of the natural sciences; - BMZ EC; - Cultivation escape staircase West; - Construction flight Steg East; - Rehabilitation of the student and teacher-toilet facilities on the ground floor; - Restoration entrance facade; - Rehabilitation staircase North. To date, there are in accordance with the present building permit. The construction work has not yet been completed and is now to be carried out further during the school operation. For under the announced measure to be planned areas are about 3 million EUR net available for the continuation of the overall measure. Object of the contract are benefits in the form of: - Building design, service phases 2-9 (§§ 33 ff HOAI 2013 i conjunction with Annex 10...). Due to the previously announced plan an ENTIRE provision of power image from the power phases 2 + 3 will not be necessary.

Architectural and related services

Lahn-Dill-Kreis, vertreten durch den Kreisausschuss | Published March 11, 2015  -  Deadline April 7, 2015
cpvs
71200000

The Alexander von Humboldt (Gesamtschule) in Asslar was built in the 70's in reinforced concrete frame construction with curtain-washed concrete facade. The school extends with a gross floor area of ​​approximately 13,500 m3 over 3 floors. The number of students at the Alexander-von-Humboldt school is on average about 650 Pupil / school year. In summer 2009, extensive studies have been carried out with respect to the static, energetic, functional and fire safety condition of the building. Here, deficiencies were identified that required the immediate implementation of rehabilitation and modernization measures mandatory. In 2010, a planning application was submitted for the fire protection renovation. Since today following measures were taken: - installation of the staff room - Setting teachers bases - fire wall retrofit EC - Restoration of natural sciences - BMZ EC - Cultivation escape staircase West - Construction escape bridge East - Renovation of pupil and teacher-toilets on ground floor - renovation entrance façade - Renovation stairwell North To date, there are in accordance with the present building permit. The construction project is not yet completed and will now continue to be listed during the school operation. For the within the advertised measure to be planned areas are approximately EUR 3.0 million net available for the continuation of the overall measure. Object of the contract benefits in the form of: - (.. §§ 33 ff i HOAI 2013 in conjunction with Annex 10) Building design, performance phases 2-9 Due to the previously announced plan is an ENTIRE provision of the service image from the phases 2+ 3 not be required.

Architectural, engineering and planning services

Lahn-Dill-Kliniken GmbH | Published November 29, 2016  -  Deadline December 28, 2016
cpvs
71240000

This includes all necessary for a hospital operating technical extensions (nurse call, AV / SV etc.).

It was therefore decided to increase the west wing.

The exact conditions must be agreed construction planning with the operator in the course.

The general planner assumes Objektplanung performance, structural engineering and design services for the technical equipment of all plant groups and building physics consulting services.

The cost is according to rough cost estimate:

Cost group 300 - Construction: 1.5 million EUR net;

Cost group 400 - Equipment: 700 000 EUR net.

The planning and execution times of activities are planned for the following period:

Planning performance (LPh 1-7): January 2017-November 2017;

Execution (LPh 8): November 2017 to December 2018.

The responsible construction manager is the general contractor.

First, an instruction to the TO with the listed basic services of service phases 1 to 4, the amounts allocated for these Phases special services is provided.

From derstufenweisen mandating the AN may not derive any increase of their fees or other claims.

The levels are:

Project planning:

Power Phase 1 - 4 concerning the special services;

Power Phase 5 (reference details), 6 and 7 with special services;

Performance phase 8 with special services;

Performance stages 9 with special services.

Structural engineering:

Performance Phase 1 - 3, with special performances;

Power Phase 4 with special services.

Technical equipment and building physics, all ALG:

Power Phase 1 - 4 concerning the special services;

Performance stages 6 and 7 with special services;

Performance phase 8 with special services;

Performance stages 9 with special services.

Architectural, engineering and planning services

Der Kreisausschuss des Lahn-Dill-Kreises | Published November 17, 2016
Winner
Keul und Müller Architekten
cpvs
71240000

It is envisaged that the school building administration, classroom wing and "Old" to rehabilitate basic way and to toughen the energy and fire safety deficiencies in this course. At the same time accessibility is produce.

The plot of the school complex is located in a central location on the outskirts of Greifenstein, district Beilstein. Of the 4 freestanding buildings only the administrative and classroom wing are connected by a portico. Between the two buildings is a 1-storey toilet wing, which has already undergone interior renovation in the year of 2008. The adjoining gym has been renovated basal 2 years ago and is not part of this action. The grounds of the entire school ensemble has also been rehabilitated.

Architectural services for buildings and interiors for the basic exemplary rehabilitation of administrative, classroom wing and old buildings on the Orange-Nassau-Beilstein school.

Architectural, engineering and planning services

Der Kreisausschuss des Lahn-Dill-Kreises | Published March 22, 2016
Winner
Freischlad + Partner GmbH & Co. KG
cpvs
71240000

These documents shall be provided to the selected candidates in other procedures.

Architectural, engineering and planning services

Der Kreisausschuss des Lahn-Dill-Kreises | Published September 26, 2015  -  Deadline October 22, 2015
cpvs
71240000

The vocational courses include specializations economic (focus on Business Administration with the subjects economics, accounting and computer science) and technology (focus on Data Processing Technology / Electrical Engineering with the subjects engineering science, technology and technical communication). Energetically the commercial schools are supplied via a district heating network, led by the trade schools. After obtaining permission, the continuation of the project is intended in phases, a compensation for discontinuance deleted explicitly.

Architectural, engineering and planning services

Der Kreisausschuss des Lahn-Dill-Kreises | Published April 6, 2016  -  Deadline May 3, 2016
cpvs
71240000

After obtaining permission, the continuation of the project is intended in phases, compensation from discontinuance deleted explicitly.

The responsible body, the stock plan, as well as the fire protection concept from the year 2010 to the selected candidates in other procedures.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Wetzlar | Published November 11, 2015
Winner
Ing. – Büro Krebs und Kiefer
cpvs
71000000, 71300000

The abutment bar in the area of ​​the fixed bearing has to be renewed, and it must be done a minimum concrete repair the bridge to such an extent that any use of the building is ensured over the next 10 years. At the building 2 stair towers are grown in an easterly direction and 4 in a westerly direction. The following services come for execution: a) Project planning / civil engineering structures for the rehabilitation planning: Work phases 1-3 + 5 in accordance with § 43 HOAI from eligible construction costs of 650 000 EUR. b) Project planning / civil engineering structures for the storage and ÜKO Instandsetzung- and Planning: Work phases 6-8 according to § 43 HOAI from eligible construction costs 2 500 000 EUR. The work phases 1-5 for the repair of bearings and ÜKO are already provided by the provided by the AG planning documents. c) technical planning / structural engineering for the rehabilitation planning: Work phases 1-3 + 5 in accordance with § 51 HOAI from eligible construction costs of 350 000 EUR. d) technical planning / structural engineering for the repair, storage and ÜKO Planning: Work phases 3 + 6 in accordance with § 51 HOAI from eligible construction costs of 2 200 000 EUR. The Performance Phase 1 to Phase 4 performance for the repair area of ​​the bearing and ÜKO apply through the documentation provided by the AG as already provided.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Wetzlar | Published June 6, 2015  -  Deadline July 13, 2015
cpvs
71000000, 71300000

The abutment bar in the area of ​​the fixed bearing has to be replaced, and it must be done a minimum concrete repair the bridge to such an extent that any use of the building is ensured over the next 10 years. At the building 2 stair towers are grown in the east and 4 west. The following services come to perform: a) Project planning / civil engineering structures for the rehabilitation planning: Work phases 1-3 + 5 to § 43 HOAI from eligible construction costs of 650 000 EUR. b) Project planning / civil engineering structures for the storage and ÜKO Instandsetzung- and Planning: Work phases 6-8 according to § 43 HOAI from eligible construction costs 2 500 000 EUR. The work phases 1-5 for the repair of bearings and ÜKO are already provided by the provided by the AG planning documents. c) technical planning / Structural planning for the rehabilitation planning: Work phases 1-3 + 5 in accordance with § 51 HOAI from eligible construction costs of 350 000 EUR. d) technical planning / structural engineering for the repair, storage and ÜKO Planning: Work phases 3 + 6 in accordance with § 51 HOAI from eligible construction costs of 2 200 000 EUR. The power phase 1 to phase 4 performance for the repair area of ​​the bearing and ÜKO apply through the documentation provided by the AG as already provided.
  • 1