To merge the county government of the Alb-Donau district in Ulm, is adjacent to the existing building of the district (Schiller Straße 30, 89077 Ulm) in Hauffstraße 10, a new building with an office area of approximately 3 200 m
To merge the county government of the Alb-Donau district in Ulm, is adjacent to the existing building of the district (Schiller Straße 30, 89077 Ulm) in Hauffstraße 10, a new building with an area of approximately 3 200 m
To merge the county government of the Alb-Donau district in Ulm, is adjacent to the existing building of the district (Schiller Straße 30, 89077 Ulm) in Hauffstraße 10, a new building with an office area of approximately 3 200 m
The airfield is Laupheim site of the German air force and military security. Access to the airport is subject to security clearance (SÜG).
The building is intended to serve the provision and maintenance of medical Evakuierungsrüstsätze aircraft. In building medical components and complete transport units (PTE) to be stored. The climatic requirements for the storage of medical products must be respected in all warehouses. For the refresh of the medical devices, a cleaning space, a workshop for electronics and a workshop for precision mechanics are scheduled. Metrological controls of medical devices with measuring function requiring reference conditions at the ambient temperature and the relative humidity of these workshops, which are defined and followed. For the staff social, preparedness and offices and a classroom are required.
All land (MBF) must be placed at ground level. The air conditioners / -spaces can be placed above the ground floor. A service access is required outside of the building. The connection room for the media and the BWI-IT space can be planned as a partial cellar. These rooms need a separate external access for the Bundeswehr Service Centre (BwDlz) and the IT service provider of the Bundeswehr (BWI-IT).
In a feasibility study concerning. The site for the construction of a building Tacmedevac-4 variants have already been examined. The owner will decide on the basis of an evaluation matrix for one of these variants. This variant is intended to serve as a preliminary for further planning. Commencement of services: 01/02/2016, accompanied by the Bundeswehr: 10/2018. Creation of EW-Bau until 06/2016.
New construction of a heliport on the roof of the existing 8-storey high-rise building of the Military Hospital Ulm with construction of a new stair and elevator tower for connection to the existing emergency room. The upgrading of the existing steel and reinforced concrete supporting structure of the skyscraper is required. The construction work is carried out in the current hospital operations. Focus is on the architecture and the static training in line with the concise inventory building. The total construction costs amounted to about 5,548,000 EUR gross.
The course of action is carried out according to the guidelines for construction of federal (RBBau). The building regulation treatment is in accordance with § 70 para. 3 LBO.
The following deadlines must be met: creating the EW-construction including approval planning. 05/2016 to 01/2017. Implementation planning: 07/2017 to 02/2018. Supervision: 03/2018 to 05/2020.