The approval area is the EU or the European Economic Area EEA.
The language in which the calls are routed and the job must be executed is German.
Procurement of Oracle Services for follow-architecture servers.
70599 Stuttgart, Ersatzneubau Small Animal House, University of Hohenheim, Hohenheim campus, architectural services under Part 3 section 1 HOAI, Phases 5-8.
The Stuttgart Regional Council has committed 2013/2014 the small animal house of the University of Hohenheim due to compliance with the Animal Welfare Act and the Regulation on the protection of animals used for experimental purposes out.
The legal changes in laboratory animals (Directive 2010/63 / EU of the European Parliament and of the Council, recast TierSchG, TierSchVersV) and the resulting regulatory requirements by the Regierungspräsidium Stuttgart, can not be realized in the existing building.
A retrofit of the existing building would be uneconomic and technically impossible.
The replacement building should serve to improve the animal husbandry conditions and compliance with all requirements of the Animal Welfare Act. The terrain is sloping to the south. Utility room, social room, sanitary areas. The reduced form results in both a favorable A / V ratio, as well as a favorable ratio of NF to BGF. To avoid cavities is dispensed with drywall. To avoid cavities no suspended ceilings are used throughout the building.The service phases 1-4 after HOAI were conducted by Universitätsbauamt S + H in-house planning.
There are to provide the service phases 5-8 according to Part 3, Section 1 HOAI.
The relevant eligible costs total is approx .: 3.1 million EUR gross.
Bidders and their demand and rental business owners have with tender the relevant commitments under § 5 LTMG, available at "https://rp.baden-wuerttemberg.de/Themen/Wirtschaft/Tariftreue/Seiten/Mustererklaerungen.aspx" express.
17-01191 performed. (Please specify when making inquiries).The district Neckar Park is urban redeveloped. For the NeckarPark area an energy center will be created, which will supply the entire area. In addition, to be built on the same grounds a neighborhood park.
The building will include the energy center, a neighborhood park with at least about 300 parking spaces, a bicycle station for about 100 bicycles with workshop and adjoining rooms as well as a free standing or building integrated gas transfer station and substation.
Special features of B-Plan include a noise barrier to the street with 16.5 m and a minimum of 30% vegetated facade without intensive care.
Since the power station has to go earlier in operation, the construction of the parking garage is drawn.
Building Design HOAI 2013 Part 3, Section 1 (architectural services in accordance with § 34 HOAI) for the new parking garage with power station in Stuttgart-Bad Cannstatt.
The cost of the technical equipment of the power station are not eligible costs of the building design.
The appointment is a function of the project approved by the City Council of the City of Stuttgart under a contract stages. The contractor is obliged to accept the power not power stage 9 HOAI if the project comes to realization. The client intends the power gradually to instruct.
A legal claim for the transfer of all power levels does not exist.
New "Neue Mitte" (Mensa and full-day / teaching area) at the summer school in Rain
Stuttgart-Bad Cannstatt.
The Sommerrain school is a 5-speedy, pure primary school in the district Bad Cannstatt.
Through the proposed new building it is to be developed into a full-day school.
The bulk of the "new center" is about 970 m
The program area this is composed of:
Kitchen, dining area, multipurpose room, full-day spaces and medium- or
long-term replacement for spaces required castlings future construction phases and for lacking in pavilions.
It is gross of total cost of approximately 9.32 million EUR, incl. Ancillary expenses, assumed.
In the planning and execution of the sustainability criteria of the State of Baden-Württemberg have to be considered (nbbw.de).
Building Design HOAI 2013 Part 3, Section 1 (architectural services in accordance with § 34 HOAI) for the
New "Neue Mitte" (Mensa and full-day / teaching area) at the Sommerrain School in Stuttgart-Bad Cannstatt.
The appointment is a function of the project approved by the City Council of the City of Stuttgart
under call-off contracts. The contractor is obliged to accept the power not power stage 9 HOAI,
if the project comes to realization. The client intends the power gradually to instruct.
A legal claim for the transfer of all power levels does not exist.
Reconstruction and expansion of the Anne Frank Community School in Stuttgart-Möhringen.
The Anne Frank Community School is a 3-speed school in Möhringen.
In the course of the measure an extension of the structure as well as the restructuring of the stock with the creation of community school structures will be carried out.
Construction costs.Building planning according to HOAI 2013, part 3, section 1 (Architectural services according to § 34 HOAI) for the
In the extension, there are teaching and differentiation rooms for two years, special needs such as library, media room, team station, school social work, etc. In the stock are about 3 600 mThere is no legal claim to the transfer of all performance levels.
The sustainability criteria of the state of Baden-Württemberg (nbbw.de) must be taken into account in planning and implementation.
General renovation of the five-storey business and office building Eberhardstraße 39 in Stuttgart from the years 1978/1980 with rented business units on the ground floor, two underground floors with large storage rooms, technical rooms, sanitary facilities of the business units and an underground car park in the second basement. In the five above-ground floors, various departments of the Office of Public Order, some of them with public transport, as well as the statistical office are accommodated. The building is in a state of renovation. The building is not in the sole proprietorship of the state capital Stuttgart. The ground floor is for the most part not owned by the city.
The inventory covers approx. 14,400 m
Building planning according to HOAI 2013, part 3, section 1 (Architectural services according to § 34 HOAI) for the renovation of the building Eberhardstraße 39 in Stuttgart.
The commissioning is carried out as a function of the project approval by the city council of the city of Stuttgart in the framework of call-off contracts. The Contractor is obliged to take over the performance up to and including performance phase 9 HOAI when the project is realized. The client intends to commission the service in stages. There is no legal claim to the transfer of all performance levels. The client reserves the right to conclude the negotiation procedure in accordance with § 17 VgV, after the first round of negotiations.
The aim of the procedure is the development of a planning for a new residential complex for students, from the point of view of urban and freelance integration, functional and architectural quality as well as energetically optimized construction, profitability and sustainability.
The object of the competition is the development of the urban development of the partly adjacent land adjacent to the campus of the state seminar for didactics and teacher education, including the existing residential building (student dormitory) as well as the preliminary planning for the buildings of a newly emerging student housing complex next to the existing residential tower on the competition site ,
The order criteria to be applied and their weighting are as follows:Competition result = 50%
Further development of the competition result = 15%
Sustainability / Profitability / Cost and Scheduling = 20%
Performance of the project team = 10%
Fees / Charges = 5%
They are commissioned in stages. The commissioning of the LpH 6-8 is striven for.The procedure is aimed at the variety of proposed solutions and the awarding of a planning contract for the construction of a new residential complex for students at the Campus Königsallee in Ludwigsburg.
The procedure is anonymous.
Uninhabited modernization of a listed quarters in Stuttgart-Wangen with about 5 900 m
Currently done preliminary studies and planning services to the power stage. 2
The implementation of the restructuring is expected in 2019 and in four sections.
Building design in accordance with § 34 HOAI 2013 - Work phases 3-9.
Rotenbergstraße 170 in Stuttgart-Ost
New construction of 40 rental apartments and condominiums with underground parking
of approximately 2 800 m² living space
approximately 5.9 million EUR Construction costs (gross, 300 & 400)
Construction expected Q3 / 2018th
Architectural services under Part 3 section 1 HOAI.
Rehabilitation of infrastructure in the listed Königsbau, 70173 Stuttgart, Königstraße 28th