Architectural and related services

Staatliches Bauamt Regensburg | Published November 12, 2016  -  Deadline December 13, 2016

Architectural Work, project planning building in accordance with § 34 HOAI 2013

860 m 2 (NF 1 - 6)

Cost ceiling 4,030,000 EUR gross (cost group 200-600 DIN 276)

Commissioning of Phases 1 to 4 and intention to gradually further mandating the

Phases 5 to 9 in accordance with § 34 (3) HOAI.

The planning task is classified III "minimum sentence" in fee band.

On the grounds of the former Rafflerkaserne in Bajuwarenstraße in Regensburg a Behördenzentrum is with buildings of Police (police headquarters, Criminal, indoor shooting), the state works department (National Tree t, building and road construction) and the motorway Südbayern.

In this urban environment is planned to the existing indoor shooting range for the increased demands on the police use of the construction of training facilities in the immediate vicinity.

The space program includes, besides training and conference rooms a practice area consisting of a variable multi-purpose room, an exercise staircase and a blackout for night situations exercise yard, where the diverse, practical simulated scenarios can be practiced.

By means of a high-quality camera system can be observed from here the exercises, recorded and analyzed in the wake of the conference room.

200 m 2 attributable to the covered exercise yard.

The costs referred to include the cost groups 200 to 600 in accordance with DIN 276-1: 2008-12.

Events:

Completion HU-Bau 09.15.2017

Construction is expected in July 2018

Completion expected May 2020th

Architectural Work, project planning building HOAI 2013

Staatliches Bauamt Regensburg | Published November 12, 2016  -  Deadline December 13, 2016
Police departments former Rafflerkaserne Regensburg

Architectural and related services

Studentenwerk Niederbayern/Oberpfalz | Published November 12, 2016
New halls of residence in the former Nibelungen Barracks in Regensburg -. Limited open competition for architects as general planner by RPW with prior application procedure by VOF.

Installation of doors

Barmherzige Brüder gemeinnützige Krankenhaus GmbH | Published November 3, 2016  -  Deadline December 6, 2016

Amounts approx .:

Construction phase 1a / b: 30 revolving doors, single-leaf, among others with different sound insulation and fire protection stresses

22 sliding doors, single-leaf, partly with driving.

Construction phase 2a / b: 68 revolving doors, single-leaf, among others with different sound insulation and fire protection stresses

13 sliding doors, single-leaf, partly. With drive.

Execution times approx .:

Construction phase 1a / b: a.) Technical clarification / Planning: From Monday, 13.02.2017 to the end of Friday, 24.02.2017 by AN

. B) testing / release: From Monday, 27.02.2017 to Friday, 03.03.2017 by architect

. C) Production / Doors / Frames / accessories: from Monday, 06/03/2017 to Wednesday, 03/05/2017 by AN

b) mounting frames / door elements:. from Thursday, 05/04/2017 by AN

. D) Completion: according below table - column "Finish" by AN

Construction phase 2a / b: a.) Technical clarification / Planning: From Monday, 08.05.2017 to the end of Friday, 09.06.2017 by AN

. B) testing / release: From Monday, 12.06.2017 to Friday, 30.06.2017 by architect

. C) Production / Doors / Frames / accessories: from Monday, 07/03/2017 to Wednesday, 25/10/2017 by AN

b) mounting frames / door elements:. from Thursday, 26/10/2017 by AN

. D) Completion: according below table - column "Finish" by AN

Construction process name Gewerk early (approx.) Finish (approx)

1A 1a - connection structure, IMC, ZEA interior doors

1A 1a - Connection Structure: Interior Thu 05/04/2017 Mon 07/08/2017

1A 1a - IMC, ZEA: Interior Thu 05/04/2017 Fri 30/06/2017

1A 1a -. Interior restl Endo with ERCP Wed 10/05/2017 Fri 21/07/2017

1B 1b - recovery interior doors

1B 1b - recovery: Interior Mon 23.10.2017 Mon 11.12.2017

2A 2a - New interior doors

2A 2a - New: Interior Thu 26.10.2017 Thu 05.17.2018

2B 2b - Connection Inventory interior doors

2B 2b - New: Interior Wed 11/04/2018 Mon 25/06/2018.