Architectural, construction, engineering and inspection services

Kath. Jugendfürsorge der Diözese Regensburg e.V. | Published April 11, 2017  -  Deadline May 2, 2017
cpvs
71000000, 71200000, 71222000

The KJF (Catholic child care of the diocese Regensburg eV) is the holder of Cabrinischulen Offenstetten. This is a support center for children, adolescents and young adults with intellectual disabilities.

A new building will take place. An initial cost estimate amounts to approximately 25 million EUR plus dismantling and demolition measures Ausweichgebäude and other services. With regard to the approximate cost breakdown is referenced enclosed cost overview in the tender documents.

In total, there are 3 700 m2 of floor space. The space program for the school is already clear the space program for the therapy and professional office building (day care) is still in the development.

In this context, the planning services of the power plants are image free gem. § 39 para. 3 HOAI i. V. m. Plant commissioned 11 Nr. 11.1 phases 1-9.

Architectural, construction, engineering and inspection services

Kath. Jugendfürsorge der Diözese Regensburg e. V. | Published April 5, 2017  -  Deadline May 2, 2017
cpvs
71000000, 71200000, 71222000

This is a support center for children, adolescents and young adults with intellectual disabilities.

With regard to the approximate cost breakdown is referenced enclosed cost overview in the tender documents.

The space program for the school is already clear the space program for the therapy and professional office building (day care) is still in the development.

11.1 Service phases 1-9 commissioned.

A disabled Planning emphasis must be placed.

The space program for the school is already clear the space program for the therapy and professional office building (day care) is still in the development.

an isolated operation for the interim Cabrizio may need to be planned and implemented.

The new building is to then bind to the Cabrizio.

It should be noted that two different funding bodies (in relation to the school and the day care center) are involved, so must that held a separate cost determination.

This concept of technical building equipment must accept and consider.

The future contractor and the preparatory work for the conclusion of maintenance contracts is expected.

11.1 Service phases 1-9 commissioned.

  • 1